Salim Basha Rahamathullah, Area Superintendent

Salim Basha Rahamathullah

Area Superintendent

Almeer technical services Equate

البلد
الهند - نافي مومباي
التعليم
بكالوريوس, Mechanical ENGINEERING
الخبرات
11 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 3 أشهر

Area Superintendent في Almeer technical services Equate
  • الكويت - الفحيحيل
  • أغسطس 2022 إلى يوليو 2023

 Co-coordinating and arranging all the Pre TA Requirement and Post TA activities for the contractors as per the Job Scope.
 Preparation and monitoring of work schedule as per list of deliverables.
 Reconciliation of Piping Material including field Measurement of worksHanding over of Spare & Surplus Material and Correlation with client.
 Execution of projects right from conception stage till handing over in a professional and systematic manner.
 We shall also prepare erection procedures for submission/approval to Customer and for implementations by sub-contractors for important activities.
 In charge for Seawater internal and external repair works
 Repairing of joints and surface inside and outside of pipe by using Lamination, Glass flakes and clock spring materials
 Repairing of more than 500 lamination Joints.

shift Incharge في Equate petrochemical
  • الكويت - الأحمدى
  • أغسطس 2022 إلى فبراير 2023

Rahablitation and Replacement of seawater line approximately 1800meters length

shift in Charge في Almeer
  • الكويت - الأحمدى
  • أغسطس 2022 إلى فبراير 2023

Rehabilitation and Replacement of Seawater line

Piping Supervisor في Technicas reunidas
  • الكويت - الأحمدى
  • أبريل 2018 إلى يوليو 2021

• In-charge for erection and site installation of piping of various materials (i.e., CS, AS, SS and RTRP lines).
• Review of GAD, P&ID and Piping isometric drawings
• Supervising and providing necessary technical support for contractors in equipment installation.
• Co-ordinate and providing necessary support for contractors in execution of hot-tapping activities.
• Co-coordinating with shop for piping fabrication and timely release spools for site installation.
• Review hydro test package and conducting walk-down inspection for all the completed construction activities.
• Execution of hydro-testing for all the piping and equipment’s.
• Monitoring sub-contractors progress and updating.
• Coordinating with field design team for field changes.
• Co-ordinate with KNPC operations in obtaining necessary approvals for construction activities in the operating units.
• Co-ordinate with all servicing division (i.e., Scaffolding, NDT, Inspection, Insulation, Blasting and Painting) for the timely completion of project activities

Piping Engineer QC في SAMSUNG C&T
  • قطر - الدوحة
  • أبريل 2016 إلى مارس 2017

• Reviewing work procedure for Quality content.
• Review of ITP as per the working procedure.
• Reviewing and updating project requisition and other quality content.
• Following the inspection as per the standard like ASME, API, EN and countries codes which are applicable.
• Raising NCR wherever required as per quality requirement.
• Controlling processing or delivery of non-conforming product until the deficiency is corrected.
• Compiling Quality records and Quality plan required for As-built drawing
• Managing incoming, in process and final inspection.
• Organizing and conduction quality Awareness training for employees.
• Preparing test packages and MCP for walk down.
• Witnessing of pressure testing, holiday test and other kinds of as required.
• Participating with the Client activities as to ensure smooth flow of work.

Piping Engineer في Ismath engineering
  • الهند - مومباي
  • يناير 2014 إلى مارس 2016

• Working as a Piping execution engineer to expedite the piping execution, Prefabrication and Erection of Piping in Process.
• Following & studying of GAD's, Isometrics & P & ID's in the process Area.
• Preparation and monitoring of work schedule as per list of deliverables.
• Involvement of Painting, Insulation & Hydro testing of Piping Loops as per Standards, Pre-commissioning Activities of Pigging, Flushing of Piping Systems & Charging of Utilities.
• Reconciliation of Piping Material including field Measurement of works
Handing over of Spare & Surplus Material and Correlation with client.
• Execution of projects right from conception stage till handing over in a professional and systematic manner.
• Invoicing/sub-contractor invoice clearing.
• We shall also prepare erection procedures for submission/approval to Customer and for implementations by sub-contractors for important activities.
• Providing redesign solutions for the field problems or changes (mismatching) ensuring with the client regarding the same
• Ensuring implementation and adherence as per project specification and procedure.
• Responsible for monitoring piping construction and fabrication activities and ensuring quality.
• Witnessing all field tests including hydro test (HT).
• Involved in the preparation of work packages, job cards, work schedules, Manpower and equipment schedules.

Piping Supervisor في Daelim Industrial co
  • الكويت - الأحمدى
  • أبريل 2012 إلى نوفمبر 2013

• Piping Supervisor for KNPC Gas Plant Train -4 Project.
In-charge for Erection. Shop fabrication and Site installation of above and underground Piping of various materials and equipment’s, valves etc. (i.e., CS, AS, SS and RTRP lines).

• Review of GAD, P&ID and Piping isometric drawings and checking with respect to site condition.
• In charge of Sea Water Line, Firefighting Line, Cement lined pipes for LPG Train-4
• Supervising and providing necessary technical support for contractors in Piping equipment installation and providing necessary support for contractors in execution of hot-tapping activities.
• Coordinating with shop for piping fabrication and timely release spools for site installation, Following Blasting, Painting and Cement lining.
• In charge of cement Lining Pipe Repairing
• Review hydro test package and conducting walk-down inspection for all the completed Construction activities and hydro-testing for all the piping and equipment’s
• Coordinating with field design team for field changes and preparing as built drawing
• Co-ordinate with KNPC operations in obtaining necessary approvals for construction activities in operating units and with all servicing division (i.e., Scaffolding, NDT, Inspection, Insulation,
• Blasting and Painting for the timely completion of project activities
• Following safe practice as per clients requirement to maximize production with minimum risk Coordinate with other departments/sub-contractors such as the Electrical & Instrumentation to be able to incorporate relevant information that will affect the implementation of the project schedule.

Mechanical Piping Engineer في Abdullah Nass and Partners co wll
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2009 إلى سبتمبر 2011

Working as Piping Engineer//Mechanical Engineer.
• Execution of dome shaped Tanks and required piping System for re refining of lubrication oil.
• Assigned to QAQC team initially for preparing reports on Tank fabrication, Welding, Piping & Structures and at the same time taking care of Engineering Coordination & Construction.
• Prepare overall progress report for Piping, Structural & Mechanical works and reporting name to higher official.
• Planning, organizing and directing the technical aspects of all types of Tanks Construction and Piping works.
• Responsible for verification of all materials for plant drawings before it will be released for Construction.
• Coordinating & supervising construction and installation works in the area of Structural, Piping & Mechanical and modification of the existing facilities operated by contractor.
• Responsible in assuring all the pipe line systems in accordance to its specifications, correct routing of the pipe according to its isometric drawings & P&ID and all structural supports for all pipe line system packages.
• Prepared as built drawings for modification and obstructed pipe spools
• Evaluation and analysis of current project status and schedule based on progress
Update against the baseline schedule.
• Involved in the preparation of work packages, job cards, work schedules, Manpower and equipment schedules.
• Managed & maintained construction schedule regularly by affecting actual site progress and conditions.
• Carrying out Hydro-Test for the Tanks as well as Pipes, witnessed sand blasting and painting of the tanks
• Responsible for tie in Points location, Heat Exchangers, Vessels, Drums, Valves.
• Scheduling daily activities with Superior in co-ordination with Planning team
In accordance to achieve the required target with the effective workforce and updating the same to the department superiors.
• Ensuring Safety of the worker as well as equipment before start of the work.

الخلفية التعليمية

بكالوريوس, Mechanical ENGINEERING
  • في Anna University
  • يونيو 2006

Mechanical engineering

Specialties & Skills

اللغات

الهندية
متمرّس
التاميلية
متمرّس
المراتي
متوسط
الملايام
مبتدئ
الانجليزية
متمرّس

الهوايات

  • Reading, cricket