Senior Project Manager
Cenomi Centers
Total years of experience :11 years, 2 Months
• Manage team responsible for creating and managing project plan including budget, timeline, resources, etc., leading to successful
completion of projects.
• Developed mall development capex plan, budgeting $40, 000, 000 for each eight malls, and allocating $7000, 000 to each category.
• Ensuring projects, program, and other activities are organized and executed in a consistent manner and fulfilled within established
standard.
• Managed multiple related projects by coordinating efforts and setting milestones to achieve greater benefits for the organization.
• Improved project management metrics by developing trend reports and data sheets by professionally utilizing power BI and excel.
• Monitoring output and outcomes of a program components activities, adjusting the program and its activities appropriately, and preparing
reports on the program including its performance against goals to be used by management when making business decisions.
• Created a process for documentation and evaluating changes in order to ensure proper implementation and improvement of current
processes
• Effectively managed 2 different large scale projects NEOM, and Granada Mall.
• Managed the installation of MV-LV electrical equipment: transformers, switchgear, Main distribution Boards (MDB), SMDB, MCC, EIP, LP,
PP, DC Chargers, Earthing systems, and streetlights, ensuring strict compliance with safety and quality standards.
• Developed plans, schedules, and scopes for the preparation of designs, processes, reports, correspondence, according to client
specifications, by delegating tasks and providing work direction to project team.
• Identified, developed solutions, and implemented for any issues that may affect cost, schedule, safety, or quality, as demonstrated by the
increased financial metrics, and the increase in safety and quality metrics.
• Completed projects within schedule and budget constraints, resulting in an increased on-time completion rate of 90%.
• Enhanced efficiency by establishing standard processes, templates, and best practices, as evidenced by a 15% decrease in processing time
• 5 years' experience maintaining electrical power high voltage substation equipment such as power transformer, power switchgear, power
auxiliaries and troubleshooting equipment failures using electrical, mechanical, and maintenance tools.
• Performed preventive maintenance on 30 high voltage power substations, reducing failure rates by 20% per year
• Conducted testing and measuring equipment such as: TTR, insulation resistance, winding resistance, dielectric, Insulation power factor
(Doble) tester, Circuit Breaker Timing, Analyzer, ammeters, voltmeters, hi-pot, cable test van, battery bank and charger load tests to
determine if equipment was safe and operational.
• Trained junior technicians in advanced diagnostics, troubleshooting, test, repair, and maintenance procedures/methods.
• Practice good housekeeping, including jobsite cleanup, which conforms to safety standards, rules, and practices and requires it in others.
Related Courses :Digital Circuit Design, Electric Circuits, Electromechanical Power Conversion, Electronics, Power System Analysis, Power System Engineering, Semiconductor devices, Senior Design, Signals & Systems, computer network system, digital circuit design, signal & control, computer network system, Digital VLSI Design