Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
khaja ilyas, Electrical QA/QC Engineer

khaja ilyas

Electrical QA/QC Engineer·NESMA INFRASTRUCTURE AND TECHNOLOGY

Saudi Arabia

Bachelor's degree, electrical engineer

Work experience

Total years of experience: 13 years, 1 months

Electrical QA/QC Engineer

October 2017 - Present

NESMA INFRASTRUCTURE AND TECHNOLOGY

Jeddah, Saudi Arabia

October 2017 - Present

• Preparation of Construction Quality Procedure, Checklists and Method of Statements.
• Preparation and Submittal for RFI.
• Review and Inspection of all Electrical Material, prior to Installation.
• Daily monitoring the Construction Activities.
• Responsible for the over-all implementation of Quality Control related electrical works accordance with project specifications and Engineering Standards.
• Verify the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.
• Inspection of installation of OHTL tower insulators.
• Inspection of OHTL 380KV line stringing activity of AAAC conductor as per the approved drum schedule and key plan.
• Inspection of Mid span joints and dead end clamps installation.
• Inspection of OHTL line sagging.
• Inspection of OPGW installation, splicing and termination.
• Inspection of Gantry equipment’s installation (GIB, Surge arrestor, Wave trap, CCVT).
• Monitor the Underground installations; check the required burial depth and spacing requirements to adjacent installations, prior to backfilling
• Witness Testing of OHTL 380KV Line, cable meggaring and HI - POT test.
• Inspection of Electrical Equipment function test and Illumination level testing of lighting system.
• Inspection of electrical installation Panels Monitoring control panel wiring, Termination, cable routing & cable tray installation.
• Verify all required inspection report and test records are systematically generated and compiled according to the approved QC Procedures.

• Coordinate with Client representatives regarding the implementation and quality of works.
• Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.
• Installation of control panel and termination continuity and Meggar test.
• Inspection of Ground Rod and Grounding cable, as per Engineering Specification.
• Preparation of Electrical Inspection Reports
• Provide sufficient feedback to QA/QC Manager and Team leader on the day to day quality issues.
• To supervise and carry out effective implementation of work schedule to clear punch list.

Company industry:
Construction & Building
Job role:
Electrical Engineering

Electrical Site Engineer

March 2014 - September 2017

Hyundai Heavy Industries

Jeddah, Saudi Arabia

March 2014 - September 2017

• Supervising for Installation of 13.8kV, 4.6kV MV SWGR Panels for Sub-contractor work.
• Supervising for Installation of LV, Lighting Dist.Board, AC/DC UPS Panels
• Supervising for Installation of Station service transformers with vendor
• Supervising and Give Instruction to Subcontractor as per IFC drawings for Lighting systems and Earthing systems in power plant and Substation
• Supervising for Fire Alarm Installation in Power Block and BOP Area as per IFC Drawings
• Co-ordination with vendor’s and Sub-contractor
• Co-ordination with Engineering department any Technical Query or Site modification work
• Participate with QA/QC with Clients, During Inspections
• Attend Daily, Weekly, and Monthly meetings with sub-contractors and Clients.
• Co-ordination with commissioning teams, During Initial energization of Electrical Package’s.
• Prepare the 3 Weeks Work schedule and Meeting Agenda for weekly review meetings.
• Participate Material inspections with QA/QC with clients.

Company industry:
Electric Power Production & Transmission
Job role:
Civil Engineering

Electrical Engineer

April 2013 - January 2014

Power Mech Projects Ltd.

Jeddah, Saudi Arabia

April 2013 - January 2014

Electrical Engineering

Company industry:
Electrical Engineering
Job role:
Electrical Engineering

Education

sree chaitanya engneering colege

March 2013

March 2013

Bachelor's degree, electrical engineer

India

GPA (percentage): 70%

GPA (percentage): 70%

Electrical Engineering with A grade
View attachment

Skills

Transformer
Expert
Transformer
Expert
MEP
Expert
MEP
Expert
Illumination
Expert
Illumination
Expert
Preparation
Expert
Preparation
Expert
Electrical Design
Expert
Electrical Design
Expert
auto cad
Beginner
auto cad
Beginner
Commissioning
Intermediate
Commissioning
Intermediate
quantity survey
Intermediate
quantity survey
Intermediate
MEP electrical desinging
Intermediate
MEP electrical desinging
Intermediate
site inspection
Intermediate
site inspection
Intermediate
desining on softwares like RELUX, CGLUX, AUTOCAD
Expert
desining on softwares like RELUX, CGLUX, AUTOCAD
Expert
Transformer
Expert
Transformer
Expert
MEP
Expert
MEP
Expert
Illumination
Expert
Illumination
Expert
Preparation
Expert
Preparation
Expert
Electrical Design
Expert
Electrical Design
Expert

Languages

English

Expert

Training and Certifications

Certifications
ISO 9001-2015 Lead Auditor
MEP electrical desing engineer
Taiba training institute
Jul 2013 - Dec 2013

Recommendations

Azeemuddin khaja

Nov 2015

Nov 2015

accountantColleague

I am writing to recommend Mr khaja ilyas I have known him since past 4 year s. khaja ilyas has shown the kind of initiative that is necessary to be successful over the long term in the field.He has excellent forensic skills, yet remains focused on the overall needs of the Industry I belive he will be a strong and has an excellent future in his field. he is conscientious worker and has an excellent work ethics.

Hobbies and interests

playing cricket