Commissioning Manager
Saudi Electricity Company
Total years of experience :13 years, 4 Months
Khafji 380/115/13.8 KV BSP:
Technical Activities: Witnessing RED 670 Relay Final Settings, MICOM P546 Relay Final Settings, All OC/UV/UF
Relay Settings, Auto Reclosure, Breaker Failure, Synchro Check, 115 KV Bus Bar Scheme, 13.8KV Bus Bar
Scheme, Bushing CT Tests, Transformer tests and almost all major activities carried in a Substation.
Managerial Works: Managing the activities in parallel, managing available resources on site, coordination with
Contractors and CSD Dept., managing Office Admin Works and Mess, managing documentation and formatting
works.
Testing of Over Current Relay SIEMENS 7SJ6025
Jubail 17BD S/S:
• Replacement of 13.8KV SG Panels including Installation, Testing and Relay Testing.
• Sound Knowledge of all kind of Maintenance Jobs.
Ministry of Water & Electricity, Al-Medinah, KSA.
Worked as Instrumentation Engineer, responsible for calibration of following Transmitters/Sensors and
Controllers/Indicators.
• ABB Flow Meters (MagFlow)
• Krohne Flow Meters (IFC 110, 300)
• Phoenix Controllers/Indicators
• Nivelco Ultrasonic Level Transmitters
• Nivelco Controllers/Indicators
Doha 380/230/115/13.8kV Substation-Saudi Electricity Co.
Worked as T&C Engineer, responsible for Configuration, Testing & Commissioning of Gas Insulated Switchgear
(GIS).
• Scheme & Functional Checks of GIS
• CT, VT, Auxiliaries Testing
• Synch Check Activity
• BCU Configurations
• Dew Point & Purity Testing
• Protective Relay Testing (UV, OV, OC, UF)
• Under Frequency Function Test
• Auxiliary Relays Testing (MVAX12, MVAJ205, MVAJ105, MVAX34, MVTT14, MVAJ101)
Saudi Aramco Power Plant
• Testing of Protection Relays (ABB, ALSTOM, MICOM)
• Transformer Tests
• Function Checks of GIS
RLNG Fired 225 MW Power Plant, Bin Qasim, Khi.
• Provide Technical support regarding I&E Scope of work
• Carried out Environmental Impact Assessment (EIA)
• Hydrological and Goe-Physical survey of Power Plant Site.
Coal Fired Power Plant Project Aug'13 -Nov '14:
Key Responsibilities:
• Provide technical input and support for the I&E/C scope of Coal Fired Power Plant Project
• Review of project deliverables such as Process Flow Diagrams (PFD's), Process & Instrument
Diagrams (P&ID's), Equipment's Data Sheet, Basic Design Engineering Packages.
• Attending technical meetings with EPC Contractors and the Government Employees (kick-off meetings, HAZOP
Study meetings……etc.) and manage the progress and performance of the related contracts
• Independently lead the Chinese and Japanese Delegations during their visits to Power Plant and
Mining Site.
• Professionally manage the site work (construction & arrangements) during the Ground Breaking
Ceremony of the project by the Prime Minister and Former President of Pakistan.
Closely worked on:
Gas Turbines, Steam Turbines, Heat Recovery Steam Generators (HRSG).
DCS, PLCs, pH and Gas Analyzers
Boiler Control System, Burner Management System
Control Valves and Regulators, Field Instrumentation, Transmitters, Sensors
Controllers and Control Modes
Electrical Fundamentals (AC Motors, Generators, Switch Gears etc.)
In FISHER Controls Division:
• Handling the Sales & Support of Fisher Regulator Division i.e. IR Technologies and NG
• Technologies & Fisher Control Valve Division.
• Selection & Sizing of the Pressure Reducing Regulator to calculate the Cv & Cg for the given
process data.
• Sizing & selection of Control Valves based on the provided data by customers.
Electronics NED-UET, Karachi
Percentage > 890/1100=80.90
Percentage > 702/850=82.58