Electrical Manager
BUTEC Utility Services
مجموع سنوات الخبرة :16 years, 7 أشهر
-Oversaw the execution phases of 60+ monthly construction projects with 5 subcontractors.
-Managed the operation department for a MV/LV network infrastructure with 500K users.
-Managed the upgrade and reinforcement of 1, 200 existing substations annually.
-Led 14 maintenance engineers and staff in resolving 400+ faults per month.
-Managed 11 customer service agents in handling 500+ work orders per month.
-Managed the meter reading and bill collection department that generates $35M annually.
-Prepared weekly reports to Asset Manager on construction and maintenance progress.
-Coordinated logistics and stock control procedures which delivered materials 100% on time.
-Maintained a dashboard with all departmental activities which improved performance by 38%.
-Prepared BOMs and cost estimates for projects which resulted in an average ROI of 5.
-Collaborated with planning, designing and OCC managers which increased efficiency by 53%.
-Managed and tracked cash expenses for the department which reduced costs by 21%.
-Reviewed invoices for all services which ensured a 100% adherence to financial regulations.
-Designed distribution network infrastructure for $7M worth of construction projects.
-Designed and reconfigured medium voltage distribution network infrastructure, resulting in a 15% reduction in network losses and improved capacity to handle a 21% increase in peak load.
-Selected network components for distribution substations which reduced costs by 14%
-Supported the transition in Beirut from 11KV to 20KV increasing transmission capacity by 32%.
-Proposed substation upgrades that demonstrated a cost saving of $3M over 10 years.
-Utilized software for MV network analysis, identifying a critical bottleneck and implementing a targeted reinforcement plan that reduced voltage drop by 5% in the affected area.
-Designed distribution networks for 50+ annual construction projects worth over $18M.
-Implemented standard network design procedures which reduced design errors to 0.2%
-Supervised and oversaw the installation of 85 substations with a 98% safety record.
-Identified capacity issues and proposed solutions that increased network capacity by 12%
-Prepared and delivered 47 engaging lessons on various physics topics to Grade 7 & 8 students, using multiple teaching strategies and tools to facilitate student learning and engagement.
-Designed and administered 43 assessments to evaluate student learning, graded student work, and maintained accurate records of student progress and performance.
-Worked collaboratively with 8 other teachers and educational organizations to ensure the delivery of high quality instruction and support to students.
Courses Completed: o Electric Machinery Fundamental and its Laboratory o Fundamentals of Power Engineering o Industrial Electrification o Auto CAD (Civil Engineering CAD) o Programmable Logic Control Laboratory (PLC) o Microprocessor and Microcontroller course and laboratory. o Principle of Semiconductor Devices o Electromagnetic fields and its Laboratory o Program design and data abstraction using C++. o Digital Integrated circuits. o Wave Propagation for Wireless Communication. o Bio-medical Engineering. o Fiber Optics. o Communication Systems. Achievements: o Senior project: Controlling a car via speech recognition system (CCSR) o Generating Electricity from windmills research o Generating Electricity from solar cells project o Parking System Project using PLC o Bio sensing using Carbon nano-tubes research. o Digital clock using PIC16F84. o Yagi-Yuda Antenna.
75/100