4 years of hands-on experience managing testing and commissioning activities as 3rd party /or direct managing, being engaged in +7 mega projects listing my responsibilities and activities as below:
• Attending Project Manager weekly meeting Responsible for (CxA, CxC) Activity Progress.
• Attend & Hold commissioning meetings to highlight any constraints.
• Attend Handover meetings representing (owner/client).
• Manage the process of requesting or defining the project requirements for pre-commissioning, commissioning, and start-up / handover and turnover.
• Provide first line contact with project managers, class surveyor, client site team, local and offshore vendors to ensure all commissioning requirements are meeting class and project specifications.
• Handling Testing & Commissioning activities (Pre-Commissioning, Commissioning and TAB) of Mechanical Systems (HVAC, Firefighting, Domestic Water, Drainage, BMS, Irrigation, Grey Water Treatment) on a spot basis, witness mechanical system final testing and commissioning.
• Preparing Testing & Commissioning Progress dashboards and Progress reports including TAB progress report (Weekly).
• Preparing Testing & Commissioning Plan, Method Statement for mechanical systems.
• Monitor commissioning progress and resolve any problems that may arise and follow-up on all submitted inspection requests.
• Preparation of O&M Manuals & Training Manuals.
• Design Drawings Review from Commissioning Point of View.
• Troubleshooting for mechanical systems (testing and commissioning failures).
• Continually review the contractor’s construction schedule during the progress of site works with regards to MEP services and report to the project director on the same.
• Manage the day-to-day work of the site mechanical team.
• Review Contractor’s installation method statements.
• Monitor quality of the Contractor’s construction installations.
• Assist with MEP Design and reviews systems design including HVAC, Firefighting and Sanitary
• Verify the accuracy of Shop Drawings and their compliance to the specification, design and existing local authority standard.
• Prepare the MEP section of the Project Managers monthly progress report.
• Deal with Contractor’s RFIs relating to the MEP works.
• Attend the Project Manager’s internal meetings.
• Witness on-site piped system pressure test, air conditioning duct leakage testing and any other testing that may be required during the first fix works.
• On a spot basis, witness mechanical system final testing and commissioning.
• Reporting to the engineering head.
• Responsible for all mechanical works in all our new projects including HVAC, Fire fighting and plumbing.
• Analyze all the tender layouts and review all the designs.
• Keeps daily records of work performed and materials, and inspects construction work.
• Responsible for field activities of all site development and subcontractors which include
scheduling, tracking progress, inspections, and quality control testing.
• Providing the construction site report, quantifying the materials and work percentage on site.
• Follow up on all the activities on site and dealing with all kind of problems.