Review material requisitions and developed material take-offs on projects in the SAR 1.5 MM Oil and Gas and Petrochecm projects ranging in construction values up to SAR 2.5 MM Equipment costs ranged up to SAR 4MM requiring key electrical options decisions and balancing with project milestones.
Industrial Treatment Plant 8 Stage III Plant Expansion
- 55, 000 cubic meters/day Treatment Plant Exp - SAR 440 Million Fast Track
- More than 35 kilometers of power cables
- New 4 MVA power service requiring extensive interaction with SEC
- Fully integrated SCADA system, electrical power buildings, Power Distribution Room
- Numerous pump motors, blowers, HVAC systems, and lighting etc.
Specific Tasks
Quality Analysis and Checking of the various works done, 34.5kv/13.8kV, Switch gears. 480V MCC and Switchgears . 110V DC UPS, Batter.
Marafiq - Jubail: Assitant RE Electrical Dec 2011 - Aug 2012
Sewage Waste Treatment Plant Expansion Phase 2
- 55, 000 cubic meters/day Treatment Plant Exp - SAR 300 Million Fast Track
- More than 40 kilometers of power and control cables
- New 4 MVA power service requiring extensive interaction with SEC
- Fully integrated SCADA system, electrical power buildings, Power Distribution Room
- Numerous pump motors, blowers, HVAC systems, and lighting etc.
Specific Tasks:
Working closely with EPure Chinese EPC contractor managing daily communications, inspections, QA/QC issues and schedule planning on site
Quality Analysis and Checking of the various works done, 34.5kv/13.8kV, 4.16 KV Switch gears. 480V MCC and Switchgears . 110V DC UPS, Battery and Charger for Substation supply. 240V AC UPS for Emergency/Instrument loads
The systems include site power distribution equipment (4.16kV, 480V), generators and facility electrical equipment.
Inspection of 34.6KV Switch gear, transformer installation, motor installation, High Voltage & Low Voltage Switch Gear panels installation, cabling works and various other electrical works.
Testing of transformers, motors and LV and MV Switch gears & Cables.
Commissioning and Testing of MV Oil-Filled Power transformers Testing of Induction Motors Commissioning of Lighting Systems Commissioning of Navigational Aid Systems Commissioning of AC and DC UPS 's Protection Relay Testing Commissioning of MV switchgears, LV MCC switchgears and Power Panels & Preparation of Electrical Commissioning Dossiers Preparation of Electrical System Commissioning Strategy and Plan LV Dry Type Distribution transformers.
Jacobs- khobar: Electrcial Materials Procurement Sep -2012 to Jun 5 2013.
Reviewed material requisitions and developed material take-offs on projects in the SAR 1.5m. Oil and Gas and Petrochecm projects ranging in construction values up to SAR 2.5 m. Equipment costs ranged up to SAR 4 requiring key electrical options decisions and balancing with project
Jacobs DCSA: Lead Electrcial Supervisor June 2013 to Dec 31, 2015
Lead Electrical Engineer supervising NSH Personel for SADARA CHEM-1 CHLORINE PROJECT, manage all electrical activities, supervising and monitor the installation of electrical equipment, transformers rectiformers, switchgear, switch racks to ensure that standard procedures are followed
- Company industry:
- Construction & Building
- Job role:
-
Engineering