Samir AL-Haider, project construction manager

Samir AL-Haider

project construction manager

Wjeen International Co. Ltd

Location
Saudi Arabia
Education
Bachelor's degree, Electrical Engineering
Experience
20 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 5 Months

project construction manager at Wjeen International Co. Ltd
  • Saudi Arabia - Aldawadmi
  • My current job since May 2023

Construction Manager, May 2023-Present
• Confer with site project management & staff to discuss project
approved drawing, specifications and procedures.
• Coordinate and direct projects, making detailed plans to accomplish
goals and directing the integration of technical activities.
• Analyse technology, resource needs and market demand, to plan
and assess the feasibility of projects.
• Direct, review, preparation and submission for approval of design
and changes, shop drawings and details.
• Preparation, submission and ensure approval of technical submittals
for materials, proposals, queries and other related
engineering/technical matters.
• Ensure that all construction related activities are executed according
to the approved drawings, use specified materials and meet
standards for quality of work.
• Identification and preparation of construction variation-orders and
preparation of cost analysis.
• Assist in selecting sub-contractors, vendors, suppliers and
negotiating contract of the construction.
• Coordination and support to other project team members on;
construction, quality, safety, procurement/purchasing department

Construction Project Manager at HKSSC
  • Saudi Arabia - Khobar
  • December 2019 to December 2022

Construction manager
2019 to present
Am reviewing the Scope of Work for Aramco project (UPGRADE FIREWATER SYSTEM AT JU’AYMAH TANK FARM)
Responsibilities:
• Works with other consultants and contractors to manage and direct the overall planning of construction activities to identify critical milestones and priorities.
• Provides the required leadership to the team for proper execution of the work.
• Manage the assignment of manpower, materials, and equipment to maximize efficiency, maintain schedules, and to meet budget goals.
• Keeps alert to possible problem areas and takes preventive action to ensure that critical milestones are met. • Establishes, monitors, and maintains construction engineering quality control in the field.
8/DEC/

• Prepare periodic reports summarizing progress of construction activities for higher-level management and clients. Prepares technical reports and conduct high quality presentations when needed.
• Establishes and maintains a close working relationship with project design engineering, client representatives, and contractors.
• Reviews material submittals, shop drawings and method statements. Recommends approval, forwards to the Client for final approval and follows-up with the Client, as applicable.
• Monitors contractor performance pertaining to schedule and conformance to plans and specifications. Performs technical reviews and evaluations.
• Maintains project control documentation, design drawings and specifications, back-charge documents, change orders, etc.
• Conducts performance evaluations for assigned personnel.
• Frequently interfaces with upper-level management and client personnel. Keeps them informed of the progress and relay potential problem that may affect the project so a prompt action can be made.

Sr. Project Enginerr at ARKAD
  • Saudi Arabia - Eastern Province
  • August 2016 to November 2019

Sr. project Engineer responsiple of management and assignment of personnel for the company, manage all electrical, communicaton, construction, and civil activities, supervising and monitor the installation of project equipments and making sure that company’s engineering and quality procedures are followed.

Electrical Lead Project Engineer at jacobs.com
  • Saudi Arabia - Eastern Province
  • March 2011 to December 2015

 Review material requisitions and developed material take-offs on projects in the SAR 1.5 MM Oil and Gas and Petrochecm projects ranging in construction values up to SAR 2.5 MM Equipment costs ranged up to SAR 4MM requiring key electrical options decisions and balancing with project milestones.

Industrial Treatment Plant 8 Stage III Plant Expansion

- 55, 000 cubic meters/day Treatment Plant Exp - SAR 440 Million Fast Track
- More than 35 kilometers of power cables
- New 4 MVA power service requiring extensive interaction with SEC
- Fully integrated SCADA system, electrical power buildings, Power Distribution Room
- Numerous pump motors, blowers, HVAC systems, and lighting etc.

Specific Tasks
Quality Analysis and Checking of the various works done, 34.5kv/13.8kV, Switch gears. 480V MCC and Switchgears . 110V DC UPS, Batter.

Marafiq - Jubail: Assitant RE Electrical Dec 2011 - Aug 2012

Sewage Waste Treatment Plant Expansion Phase 2

- 55, 000 cubic meters/day Treatment Plant Exp - SAR 300 Million Fast Track
- More than 40 kilometers of power and control cables
- New 4 MVA power service requiring extensive interaction with SEC
- Fully integrated SCADA system, electrical power buildings, Power Distribution Room
- Numerous pump motors, blowers, HVAC systems, and lighting etc.

Specific Tasks:
 Working closely with EPure Chinese EPC contractor managing daily communications, inspections, QA/QC issues and schedule planning on site
 Quality Analysis and Checking of the various works done, 34.5kv/13.8kV, 4.16 KV Switch gears. 480V MCC and Switchgears . 110V DC UPS, Battery and Charger for Substation supply. 240V AC UPS for Emergency/Instrument loads
 The systems include site power distribution equipment (4.16kV, 480V), generators and facility electrical equipment.
 Inspection of 34.6KV Switch gear, transformer installation, motor installation, High Voltage & Low Voltage Switch Gear panels installation, cabling works and various other electrical works.
 Testing of transformers, motors and LV and MV Switch gears & Cables.
 Commissioning and Testing of MV Oil-Filled Power transformers Testing of Induction Motors Commissioning of Lighting Systems Commissioning of Navigational Aid Systems Commissioning of AC and DC UPS 's Protection Relay Testing Commissioning of MV switchgears, LV MCC switchgears and Power Panels & Preparation of Electrical Commissioning Dossiers Preparation of Electrical System Commissioning Strategy and Plan LV Dry Type Distribution transformers.

Jacobs- khobar: Electrcial Materials Procurement Sep -2012 to Jun 5 2013.
Reviewed material requisitions and developed material take-offs on projects in the SAR 1.5m. Oil and Gas and Petrochecm projects ranging in construction values up to SAR 2.5 m. Equipment costs ranged up to SAR 4 requiring key electrical options decisions and balancing with project

Jacobs DCSA: Lead Electrcial Supervisor June 2013 to Dec 31, 2015

Lead Electrical Engineer supervising NSH Personel for SADARA CHEM-1 CHLORINE PROJECT, manage all electrical activities, supervising and monitor the installation of electrical equipment, transformers rectiformers, switchgear, switch racks to ensure that standard procedures are followed

Project Engineer at Saudi Aramco
  • Saudi Arabia - Eastern Province
  • August 2004 to February 2011

 Northern Area PMT/ Co-Generation Projects Division, SHEDGUM gas plant. Worked for power plant project step down from 230 KV to 13.8 KV.
 NAPD Division, ELECTRICAL C BERRI GAS PLANT. I worked for power plant project to supply power 115 KV step down to 13.8 KV and upgrade for main Sub-Station.
 Worked in Khursaniyah Project for the Design Review of the over-head power line (13.8 KV) and coordinated with contractor for Catholic Protection System Design Evaluation
 Joined in HNRPD/Juaymah Expansion Project as SAPMT-IK representative during the preparation of Detailed Design. Coordinate with JGP Proponent and Saudi Aramco-PDD for any power outage schedule. Made constant follow up for all local manufactured electrical equipments (i.e. MV/LV) Switchgears/Control gears, LV Switch racks and MV/LV Bus Ducts. Install cable 13.8 KV from main Sub-Station to new Sub-station and install know transformer 13.8 KV, switchgear and MCC. Witness the testing in factory and site. Coordinate with Saudi Armco-IT for all communication related work.
 Recently connected with PPD/Oil Upstream Projects as SAPMT-IK representative. Worked closely with Contractor, PDD and Proponent for the design review of 13.8 kV over-head power line and design evaluation for the Cathodic Protection System, during the preparation of the detailed design. Strictly implement the project specification, Saudi Aramco Engineering Standard and other applicable standards in carried out any construction activity. Maintained high safety standard always at site. Coordinate with Project inspection for any quality matters. Facilitate with PDD and Proponent for any electrical equipment testing activity.

Pre Commissioning ENGINEER at Fouad Abdullah Fouad Company
  • Saudi Arabia - Dammam
  • January 2003 to August 2004

 Join FAFCO.ARAMCO Support. in HARAD AH GAS PLANT AS Electrical Engineer and was Involved in Followings PRE COMMISSIONING ACTIVITIES:
 Medium voltage switchgear (13.8/4.16kv).
 Low voltage switchgear (480 V).
 Function test on both medium and low voltage switchgears.
 Testing of CT.PT.CPT. breakers and protective relays.
 Functional test on both medium and low voltage auto transfer scheme.
 Motor windings insulation test and 4 hours run’ test.
 Stability test for both bus and transformer differential circuit.
 TESTING ON DRY TYPE TRANSFORMERS. LIGHTINING PANEL

WORK With Saudi ARAMCO PMT AT QATIF FACILITY PROJECT AND Supervision the below PER Commissioning activities:
 Supervisor erecting Power transformers
Supervisor Testing CT, PT, CPT, Breaker, Protective Realigns and Function test on various voltage level switchgear

 FAFCO/ARAMCO Working in (QATIF Facility at BERRI GAS PLANT) Working as Safety Engineer

Education

Bachelor's degree, Electrical Engineering
  • at gh Diploma of Science – Electrical Engineering, in 2001• Clayton University, St.Louis, Missouri USA
  • December 2001

Obtained Bs Degree from Clayton University from USA

Specialties & Skills

Commissioning
Testing
Project Supervision
Switchgear
Technical Electrical work
Supervising
Project Management
Management
Construction

Languages

Arabic
Native Speaker
English
Expert

Training and Certifications

OSHA: Occupational Safety and Health Administration (Training)
Training Institute:
Jacobs
Date Attended:
April 2015
Duration:
30 hours
Beyond Zero Safety Training (Training)
Training Institute:
Jacobs
Date Attended:
April 2011
Duration:
8 hours
Time Management Seminar (Training)
Training Institute:
Aramco
Date Attended:
August 2006
Duration:
8 hours
Personal Development Program (Training)
Training Institute:
Aramco
Date Attended:
October 2006
Duration:
16 hours
Leadership & Development Program (Training)
Training Institute:
Aramco
Date Attended:
August 2004
Duration:
8 hours

Hobbies

  • Travel
    Traveled to US, Europe and Egypet