سمير تيريشين, Senior section engineer

سمير تيريشين

Senior section engineer

Al Jaber group

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, civil engineering
الخبرات
28 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :28 years, 5 أشهر

Senior section engineer في Al Jaber group
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ أكتوبر 2011

Analyzing and resolving field construction issues.
 Prepare, review and distribute RFIs. Maintain RFI Log.
 Maintain job Rental Authorization Log.
 Maintain job files and as-builts.
 Develop and maintain schedule with Superintendent input.
 Maintain thorough understanding of contract documents and subcontracts.
 Prepare meeting minutes for all job meetings.
 Complete required tasks daily: Timecards, Purchase Orders, Work Orders, RCC Daily Paperwork
Packet and collecting Subcontractor Daily Job Reports.
 Weekly project photos.
 Inspect/verify material deliveries.
 Manage project closeout and obtain all warranties required for final acceptance.
 Maintain punch list with Superintendent.
 Ensure company procedures and standards are maintained.
Other duties assigned.

project engineer في system construct
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2010 إلى سبتمبر 2011

Analyzing and resolving field construction issues.
 Prepare, review and distribute RFIs. Maintain RFI Log.
 Maintain job Rental Authorization Log.
 Maintain job files and as-builts.
 Develop and maintain schedule with Superintendent input.
 Maintain thorough understanding of contract documents and subcontracts.
 Prepare meeting minutes for all job meetings.
 Complete required tasks daily: Timecards, Purchase Orders, Work Orders, RCC Daily Paperwork
Packet and collecting Subcontractor Daily Job Reports.
 Weekly project photos.
 Inspect/verify material deliveries.
 Manage project closeout and obtain all warranties required for final acceptance.
 Maintain punch list with Superintendent.
 Ensure company procedures and standards are maintained.
Other duties assigned.

senior site engineer في great earth building construction
  • الإمارات العربية المتحدة - الشارقة
  • نوفمبر 2007 إلى أغسطس 2010

Receive and review drawings and specifications, identify queries and seek resolution
* Ensure setting out and measuring equipment is checked, controlled and protected and suitable for intended use
* Liaise with Foreman and set out the works as shown on drawings to meet day to day requirements
* Check deliveries for conformance to specification
* Check critical elements of work during construction and on completion
* Identify defective materials and workmanship and ensure effective corrective action is taken
* Provide accurate records and reports, daily and weekly as required
* Co-operate with others involved in construction operations including obtaining approval from client representatives when specified
* Work in accordance with Company procedures
* Prepare Method Statements, Quality Plans and the like as and when required.

Project Engineer في probat construction company
  • الجزائر - عنابة
  • يناير 2003 إلى نوفمبر 2007

To inspect and record the construction works carried out by contractor on site and resolve the site generated quaries by co-ordinating with Asst. Resident Engineer.
• To ensure performance of the work in strict accordance with the drawings and specification.
• Supervision and Inspection of `additional works’ and `out of scope works’ carried out by contractor.
• Process the joint measurement forms and maintain the records of their status.
• Maintain records of completed works for interim and final payment and as-built plans.
• Make special notes and document the contractors activities that may lead to claims.
• Be fair and firm in dealings with the contractor. Consider the alternatives and consequences carefully before making decisions.
• Check temperature, compaction, joints and surface of asphalt
• Check all form works, reinforcement etc before concrete pouring
• Co-ordinate and co-operate with Contractors site Foreman for all the activities.
• Adhere to safe working methods and report to ARE for any accidents on site.
• Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day.
• Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials.
• Checking the `Day work records’ submitted by contractor
• Supervision and Inspection of all construction activities carried out by contractor on site.
• Maintaining records of site resources, daily progress of work, inspections, construction and workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special notes and document the contract activities that may lead to claims.
• Drafting site instructions for any required variations from, or additions to, the contract documents.
• Report questionable methods of operations by the contractor to the Engineer.

site inspector في beau consultant
  • الجزائر - عنابة
  • نوفمبر 1995 إلى نوفمبر 2002

To inspect and record the construction works carried out by contractor on site and resolve the site generated quaries by co-ordinating with Asst. Resident Engineer.
• To ensure performance of the work in strict accordance with the drawings and specification.
• Supervision and Inspection of `additional works’ and `out of scope works’ carried out by contractor.
• Process the joint measurement forms and maintain the records of their status.
• Maintain records of completed works for interim and final payment and as-built plans.
• Make special notes and document the contractors activities that may lead to claims.
• Be fair and firm in dealings with the contractor. Consider the alternatives and consequences carefully before making decisions.
• Check temperature, compaction, joints and surface of asphalt
• Check all form works, reinforcement etc before concrete pouring
• Co-ordinate and co-operate with Contractors site Foreman for all the activities.
• Adhere to safe working methods and report to ARE for any accidents on site.
• Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day.
• Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials.
• Checking the `Day work records’ submitted by contractor
• Supervision and Inspection of all construction activities carried out by contractor on site.
• Maintaining records of site resources, daily progress of work, inspections, construction and workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special notes and document the contract activities that may lead to claims.
• Drafting site instructions for any required variations from, or additions to, the contract documents.
• Report questionable methods of operations by the contractor to the Engineer.

الخلفية التعليمية

بكالوريوس, civil engineering
  • في University badji mukhtar
  • سبتمبر 1995

5 years at university, with civil engineering courses with honor, specialty domestic and industrial buildings.

Specialties & Skills

Civil Works
Field Work
Civilian
communication
self confident
problem solving
leader sheap
technical
computer
analysis/synthesis
motivated

اللغات

الفرنسية
متمرّس

العضويات

french business council
  • member
  • May 2014

التدريب و الشهادات

project manager professional (تدريب)
معهد التدريب:
chicago institut
تاريخ الدورة:
September 2012
المدة:
40 ساعة

الهوايات

  • basket ball
    15 years basket ball player in algeria .
  • scuba diving
    scuba dive certified from al boom scuba diving center dubai.