Total Years of Experience: 27 Years, 7 Months
April 2013
To December 2017
مدير أشراف على التنفيذ قسم الألكتروميكانيك
at مكتب المهندسون الأستشاريون ECC
Location :
Egypt - Cairo
handled the project by preparing shop drawings and technical studies negotiating prices performing contracts for the whole project systems transformers, switch gear, generators, ring main units, fire alarm, nurse call, data&telephone, central battery ups, public address, matv, central clock, isolation and surgical, bed head units, lighting wiring devices and power panels studied the projects by preparing quotations compliance statements technical submittals and shop drawings handled the busway and fire alarm projects by preparing technical and commercials offers, shop drawings and supervising, installation, at site, bms, power, lighting, fire alarm, public address, data telephone, ups special, sound effects special, lighting, access control and, cctv, ring main units, switchgears, voltage regulators, synchronizer, busway, ups units, low voltage distribution boards, earthing system, fire alarm system, video conference system, access control system, lighting control system , cctv, sound system, data and telephone, earthing system, ring main unit
April 2010
To October 2013
مهندس الكتروميكانيك ( الإدارة الهندسية )
at الشركة الفتح للمقاولات والتشييد (شتات) / بالقاهرة / جمهورية مصر العربية
Location :
Egypt - Cairo
Workplace: - Consultant engineers Centre (ECC) Engineering Consultant Center / Cairo / Arab Republic of Egypt
Position: - Aloketromekanak supervision department director of the Department of projects (Engineering Management)
Responsibilities: -
Director of the Department Aloketromekanak (the supervision of the Executive sites) by the Office oversee them.
And projects that you oversee them now are;
1. The Egyptian Company for Pharmaceutical Industries and chemicals site (EPCI) wisdom Farm group.\{ Supervising the works of electromechanics (electricity from the medium pressure chamber of the main and sub-panels for lights, power, light current systems of telephones, data, alarms, audio system, internal control system, building management system, lighting control)
Mechanical works (fire extinguishing system, central water system, water water systems, sanitation & drainage systems, cold & hot water supply, water fire extinguishing system\}
2. The SAS FACTORY FOR ELECTRIC ACCESSORIES Tenth of Ramadan Industrial Zone .\{ Supervising the works of electromechanics (electricity from the medium pressure chamber of the main and sub-panels for lights, power, light current systems of telephones, data, alarms, audio system, internal control system, building management system, lighting control)
Mechanical works (fire extinguishing system, central water system, water water systems, sanitation & drainage systems, cold & hot water supply, water fire extinguishing system\}
Position: - Aloketromekanak supervision department director of the Department of projects (Engineering Management)
Responsibilities: -
Director of the Department Aloketromekanak (the supervision of the Executive sites) by the Office oversee them.
And projects that you oversee them now are;
1. The Egyptian Company for Pharmaceutical Industries and chemicals site (EPCI) wisdom Farm group.\{ Supervising the works of electromechanics (electricity from the medium pressure chamber of the main and sub-panels for lights, power, light current systems of telephones, data, alarms, audio system, internal control system, building management system, lighting control)
Mechanical works (fire extinguishing system, central water system, water water systems, sanitation & drainage systems, cold & hot water supply, water fire extinguishing system\}
2. The SAS FACTORY FOR ELECTRIC ACCESSORIES Tenth of Ramadan Industrial Zone .\{ Supervising the works of electromechanics (electricity from the medium pressure chamber of the main and sub-panels for lights, power, light current systems of telephones, data, alarms, audio system, internal control system, building management system, lighting control)
Mechanical works (fire extinguishing system, central water system, water water systems, sanitation & drainage systems, cold & hot water supply, water fire extinguishing system\}
Share on Facebook
Share on Twitter
Share Via Email