sanjib chaulagai, F/M Scaffolding

sanjib chaulagai

F/M Scaffolding

CCIC

Lieu
Népal
Éducation
Etudes secondaires ou équivalent,
Expérience
7 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :7 years, 3 Mois

F/M Scaffolding à CCIC
  • Qatar
  • novembre 2011 à avril 2013

 Applying the manager and the site engineer instructions and site vision.
 Checking the drawings required for my work area.
 Arranging the materials required for my work.
 Observe the quality of all work to be done by my groups.
 Ensure the safety procedures are implemented.
 Inspect the scaffolding against the required safety procedure as per the scaffolding inspection procedure I had in the training.
 Report the works done by my senior (daily report).
 Arrange toolbox talk (PJO) to my groups on daily basis as per safety procedure.

C/H Scaffolding à CCIC
  • Qatar
  • février 2010 à novembre 2011

Supervision of scaffolding work.
 Provide technical support for my workers.
 Conducting Hazard Identification and Risk Assessment programs are implemented and followed.
 Observe the quality and safety of all works to be done by my groups.
 Arranging the materials required for my work.

Scaffolder à CCIC
  • Qatar
  • octobre 2006 à février 2010

 Provide technical support for the F/M’s.
 Safety Audit with Client.
 Install the safety barricading and life line where ever it is required.
 Arrange the toolbox talk (PJO) to my groups on daily basis as per safety procedure.
 Checking the drawings required for my work.
 Observe the quality of all works to be done by my groups.
 Applying the Manager and superintend instructions and site vision.
 Ensure the safety procedures are implemented.
 Arranging the materials required for my work.

Scaffolder à CAPE EAST
  • Émirats Arabes Unis - Abu Dhabi
  • septembre 2005 à avril 2006

 Provide technical support for the C/H’s.
 Applying the manager and the site engineer instructions and site vision.
 Checking the drawings required for my work area.
 Arranging the materials required for my work.

 Observe the quality of all work to be done by my groups.
 Ensure the safety procedures are implemented.
 Inspect the scaffolding against the required safety procedure as per the scaffolding inspection procedure I had in the training.
 Report the works done by my senior (daily report).
 Arrange toolbox talk (PJO) to my groups on daily basis as per safety procedure.

Éducation

Etudes secondaires ou équivalent,
  • à Shree Mahendra Ratna Secondary School
  • mai 2004

Specialties & Skills

scaffolder

Langues

Hindi
Débutant
Anglais
Moyen

Formation et Diplômes

ESCAPE MASK Training (Formation)
Institut de formation:
CCIC
Date de la formation:
August 2008
Scaffolding Basic Level 1 (Formation)
Institut de formation:
CCIC
Date de la formation:
March 2006
PTW Trainng (Formation)
Institut de formation:
CCIC
Date de la formation:
January 2010