sanjib تشاولاجاي, F/M Scaffolding

sanjib تشاولاجاي

F/M Scaffolding

CCIC

البلد
نيبال
التعليم
الثانوية العامة أو ما يعادلها,
الخبرات
7 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :7 years, 3 أشهر

F/M Scaffolding في CCIC
  • قطر
  • نوفمبر 2011 إلى أبريل 2013

 Applying the manager and the site engineer instructions and site vision.
 Checking the drawings required for my work area.
 Arranging the materials required for my work.
 Observe the quality of all work to be done by my groups.
 Ensure the safety procedures are implemented.
 Inspect the scaffolding against the required safety procedure as per the scaffolding inspection procedure I had in the training.
 Report the works done by my senior (daily report).
 Arrange toolbox talk (PJO) to my groups on daily basis as per safety procedure.

C/H Scaffolding في CCIC
  • قطر
  • فبراير 2010 إلى نوفمبر 2011

Supervision of scaffolding work.
 Provide technical support for my workers.
 Conducting Hazard Identification and Risk Assessment programs are implemented and followed.
 Observe the quality and safety of all works to be done by my groups.
 Arranging the materials required for my work.

Scaffolder في CCIC
  • قطر
  • أكتوبر 2006 إلى فبراير 2010

 Provide technical support for the F/M’s.
 Safety Audit with Client.
 Install the safety barricading and life line where ever it is required.
 Arrange the toolbox talk (PJO) to my groups on daily basis as per safety procedure.
 Checking the drawings required for my work.
 Observe the quality of all works to be done by my groups.
 Applying the Manager and superintend instructions and site vision.
 Ensure the safety procedures are implemented.
 Arranging the materials required for my work.

Scaffolder في CAPE EAST
  • الإمارات العربية المتحدة - أبو ظبي
  • سبتمبر 2005 إلى أبريل 2006

 Provide technical support for the C/H’s.
 Applying the manager and the site engineer instructions and site vision.
 Checking the drawings required for my work area.
 Arranging the materials required for my work.

 Observe the quality of all work to be done by my groups.
 Ensure the safety procedures are implemented.
 Inspect the scaffolding against the required safety procedure as per the scaffolding inspection procedure I had in the training.
 Report the works done by my senior (daily report).
 Arrange toolbox talk (PJO) to my groups on daily basis as per safety procedure.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها,
  • في Shree Mahendra Ratna Secondary School
  • مايو 2004

Specialties & Skills

scaffolder

اللغات

الهندية
مبتدئ
الانجليزية
متوسط

التدريب و الشهادات

ESCAPE MASK Training (تدريب)
معهد التدريب:
CCIC
تاريخ الدورة:
August 2008
Scaffolding Basic Level 1 (تدريب)
معهد التدريب:
CCIC
تاريخ الدورة:
March 2006
PTW Trainng (تدريب)
معهد التدريب:
CCIC
تاريخ الدورة:
January 2010