Adel Saoudi, Researcher

Adel Saoudi

Researcher

CRAPC, Physico-Chemical Research Center

Lieu
Algérie - Annaba
Éducation
Doctorat, Metallurgy and Materials Engineering
Expérience
15 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :15 years, 4 Mois

Researcher à CRAPC, Physico-Chemical Research Center
  • Algérie - Annaba
  • Je travaille ici depuis novembre 2015

Neural Network modelling on mechanical properties of a pipeline steel.

Plant Inspector à SGS/ Sonatrach-Total-Repsol
  • Algérie
  • janvier 2015 à août 2015

Corrosion monitoring and cathodic protection of existing gas treatment plant, well head and manifold
- Review and update of pressure vessels records
(static and mobile pressure vessels) and coordination with ARH
- Prepare and approve work permits for all inspection related activities
- NDT inspections : RT, PT, VT

QC Inspector à SAFIR
  • Algérie - Annaba
  • mai 2014 à novembre 2014

RGZ3 PROJECT : Quality control of the fabrication of large diameter helical
submerged arc welded SAW pipeline, welding inspection, Hydrostatic testing,
NDT, welding repaires, welding book follow up, preparation of test reports,
mechanical testing witness and approval, external coating and internal painting in pipe mill (Alfapipe - Annaba) Algeria..

QC Inspector à ENACT
  • Algérie - Annaba
  • octobre 2012 à décembre 2013

GR5 PROJECT :
Quality control of the fabrication of large diameter helical submerged arc welded SAW pipeline, welding book follow up, preparation of test reports, Hydrostatic testing and approval, welding inspection, welding
repairs, NDT and mechanical testing witness in pipe mill (Alfapipe - Annaba) Algeria
- Responsible for following Welding & NDT inspections activities and reporting NCR.

QA/QC Inspector à Moody Intertek, SCH-FCP/SAIPEM
  • Algérie - Alger
  • août 2010 à mai 2012

MLE PROJECT :

- NDT; VT, PT, RT
- Identification and selection of materials using for PQR’S and WQT
- Ensure welders are qualified and their certificates are prepared and maintained in accordance with company control procedures
- Conducting and Monitoring welding procedure PQR’S, WQT and Coordinate with third party DPEM (ARH) for mechanical testing in laboratory
- Monitoring fabrication of pipe as per ISO and spooling drawings, check: dimension, orientation, fit-up, preheating, electrode consumable control, welding inspection
- Monitoring NDE requirements’ of piping line systems as per line list and job specification - Check release spool as per drawing
- Monitoring daily report, summary report and traceability of welder’s, welds repair rate and progress
- Witnessing leak test hydro-test and pneumatic test
of piping systems
- Piping test package as per P&ID and line list, review test package and test limit, walk around inspection release and approval for testing
- Ensuring quality documentation is raised, completed and filed
- Liaising with client and third party personnel to ensure that the project is progressed in line with project requirements - Execute the specific inspections on materials, equipment and construction/installation activities on site according Isometric Drawing
- Prepare and check Test Packages for hydrostatic testing of piping according to isometric and P&ID.

NDT Inspector à GERAL SARL
  • Algérie - Annaba
  • août 2008 à août 2010

PROJECT : Thermal Gaz Turbine Annaba Port 2x36 MW :
Periodically carry out site visits to ensure that welding is being conducted in line with the
company welding control procedures
- Review and approve sub-contractors welding, nondestructive examination procedures where necessary
- Ensure welders are qualified and their certificates are prepared and maintained in accordance with company control procedures
- Maintain and continuously update the Company Welder Qualification Register
- Ensuring welding instruments for recording parameters are maintained in good condition and are regularly calibrated
- Maintain and update the register of company welding procedure qualification records
- Perform welding engineering tasks as directed by the Company Welding Services Manager
- Providing support to Quality Manager with regards to problems and issues arising throughout the
project
- Delivering support to the Quality team to ensure compliance with project requirements
- Performing inspection of welding activities
- Performing nondestructive inspections: VT, RT and PT
- Ensuring quality documentation is raised, completed and filed.

QC Engineer à NORMISO SARL
  • Algérie - Alger
  • octobre 2007 à février 2008

Company of technical control, approval and maritime expertise (Port of Algiers):
- Approval, maritime expertise
- Preparation of conformity certificates of iron and steel products after mechanical tests of tensile and bending/unbending, chemical analysis of materials such as reinforced bar steel, wire rod, hot and cold rolled sheets, profiles, nonradioactivity tests, etc.

Éducation

Doctorat, Metallurgy and Materials Engineering
  • à Badji Mokhtar Annaba Unviersity
  • décembre 2017

Ongoing Doctorate on Metallurgy and Materials Engineering

Master, Métallurgie et Génie des Matériaux
  • à Annaba University
  • mai 2010

Magister on Metallurgy and Materials Engineering

Baccalauréat, Métallurgie et Génie des Matériaux
  • à Badji Mokhtar Annaba Unviersity
  • juin 2005

State Engineer on Metallurgy and Materials Engineering

Specialties & Skills

Métallurgie
Welding
Corrosion
Welding Inspection
Corrosion monitoring
Metallurgy
Microsoft Office Applications

Langues

Arabe
Expert
Français
Expert
Anglais
Expert

Formation et Diplômes

ASNT RT 2 (Certificat)
Date de la formation:
August 2017
Valide jusqu'à:
August 2022
ASNT RT 2 (Certificat)
Date de la formation:
June 2014
Valide jusqu'à:
June 2017
ASNT RT 2 (Certificat)
Date de la formation:
June 2011
Valide jusqu'à:
July 2014
ASNT RT 2 (Certificat)
Date de la formation:
June 2008
Valide jusqu'à:
June 2011
ASNT PT 2 (Certificat)
Date de la formation:
November 2008
Valide jusqu'à:
November 2011
Visual Testing VT (Formation)
Institut de formation:
Institut de Soudure (Welding Institute) IS France
Date de la formation:
April 2010
Durée:
16 heures
IELTS Test (Certificat)
Date de la formation:
April 2007
Valide jusqu'à:
April 2007

Loisirs

  • Reading, internet.