Responsible for costing, estimating and planning of projects, preparing project initiation documentation and
ensuring best value is obtained for the project including supplier base, use of internal and external resources. Key
role in tracking activities against the detailed project plans and updating project plans to include agreed changes.
Projects Handling:
* EPIC for Two Numbers Plant Change Request at Qatar Petroleum Refinery, Mesaieed which includes
Engineering, Design, Installation, Testing& Commissioning of 30V DC UPS and Installation of Twenty
Numbers CBCT and ELR in one of the Critical Panels inside the plant.(Nitrogen Unit And De-Alkalization
Unit).
* High and Low Voltage Power Cable jointing, Termination and Associated services in RLIC, which includes the
cable fault identification, High Pot testing, Termination of cables & Cable Jointing etc
* EPIC for Replacement of 6 no’s 110V DC Battery Chargers(DALE, UK)at NGL(Natural Gas Liquid) Plant Qatar
Petroleum, Mesaieed. Includes Engineering, Design, Installation, Testing& Commissioning of 6 No’s 110V DC
Chargers.
* EPIC for Two Numbers Plant Change Request Job at Qatar Petroleum Refinery, Mesaieed which includes
the Installation, Testing& Commissioning of 37KW hazardous classification motor .
* Call-off contract for Cable laying, Jointing & Termination at QP Refinery for 5 years, Mesaieed. Includes
Testing of Cables up to 33 KV, Cable Fault Identification, Termination of Cables, Cable Jointing, Excavation,
Cable Laying.
* Electrical Maintenance Services at QP Offshore Locations for 5 years. Includes co-ordination with OEM for
Offshore Mobilization, arranging manpower for Electrical works at Offshore.
* Maintenance of Substation & Street Lights for 5 years at Mesaieed and Raslaffan for Qatar Petroleum
which involves Routine, Preventive and Corrective Maintenance of Substations, Street Lights, High Masts,
Generator sets, UPS, Battery Chargers, test services of MV LV Switch Gear, Cubic Panels, Circuit Breakers,
Protection Relays, Power & Distribution Transformers, Isolator switches, MCCB’s, Cables, Cable Joints, Earth
System etc.
Projects Completed:
* Excavation, Cable laying & Termination of Power cables for Boiler units at Qatar Chemicals, RasLaffan.
* Excavation, Cable laying & Termination for replacement of Underground Power cables for O2 Analyser &
Acid gas flare at Qatar Chemicals, Mesaieed.
* Installation and commissioning of 560 High bay LED lights in South Logistics area including replacing of two
Distribution Boards with new at Qatar Chemicals, Mesaieed.
* Installing and commissioning of four no’s Plant Change Request jobs in Qatar Petroleum Refinery which
includes replacement of plant lights for the area lighting, installation of Distribution board including
commissioning and erection, Fixing of Explosion proof junction boxes for plant motors.