سارافانان كريشنان, Electrical Engineer

سارافانان كريشنان

Electrical Engineer

Qatar Gas

البلد
الكويت - الأحمدى
الخبرات
14 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 11 أشهر

Electrical Engineer في Qatar Gas
  • الهند
  • أشغل هذه الوظيفة منذ سبتمبر 2013

Position : Electrical Engineer (Sept'2013 - Till Date) Company : Qatargas

Projects : Jetty Boil-off Gas Recovery project (JBOG), Plateau Maintenance Project (PMP), Diesel Hydro Treatment Project (DHT), Waste Water Treatment Plant (WWTP) QG1JBOG, QG1 Power Bridging Project (PBG), Laffan Refinery Company Limited-2 (LR 2), LR 2 Zero Liquid Discharge (ZLD), Wastewater Recycle and Reduction Project (WRRP), North Field Bravo Offshore accommodation expansion project (ALQ), Common Sulphur Project (CSP) & HIA Jet A1 supply - JSP Project Key Deliverables: ✓ Report commissioning/startup/Early operation progress and anomalies to the Head of Maintenance on day-to-day basis. ✓ Demonstrated commitment to HSE excellence. Support Qatar gas Safety, Health and Environment policies and
programs, and perform specific duties and responsibilities related to work scope per the Company's management system documentation, policies, procedures, safety manual and other related documents. Email: sarvi_1969@yahoo.co.in saraetneb@gmail.com
✓ Ensures that personnel are trained to required competence. ✓ Participating in project HAZOP/HAZID workshop and 3D model reviews ✓ Review/approve electrical testing plans (ITPs), pre-commissioning, and commissioning/start-up procedures. ✓ Oversee the PMC activities related to electrical works, which include electrical component testing, initial energizing, and solo running of drivers. ✓ Ensures electrical works during commissioning and startup periods are successfully completed. ✓ Organizes & coordinates all electrical works including ELICS / EMCS / SCS during early operation of new projects. ✓ Reports work in close coordination with other commissioning and startup electrical team members. ✓ Review mark up any changes to design drawings and documentations ✓ Provide input as necessary to System Mechanical Acceptance Packages (SMCPs) to support Systems completion plan and participate in pre-commissioning, commissioning and startup activities, mechanical completion checks, running tests, punch list and follow up. ✓ Coordinating and attending project system completion walk-downs and raising punch list ✓ Review MCC / RFC / RFSU dossiers and provide concurrence ✓ Oversees/approves systems acceptance. Ensures that hand over files of commissioned facilities from project management teams (PMT's) include all documents such as Operation and Maintenance Manuals, Engineering Mechanical Catalogues, Vendor manuals etc. ✓ To review spare parts requirements for capital spares, commissioning and 2 years operation, and identify shortcomings or potential negative impacts. ✓ PMCR review and Endorsement for the electrical equipment ✓ To ensure all equipment warranty requirements are met during early operation phase. ✓ Identify and implement witnessing/vendor support for initial startup/early operation. ✓ Participate in establishing of a functional CMMS prior to handover to OPCO asset in charge team. ✓ Participate in Safety walk through and PSSR (Pre-startup safety review) walk through ✓ Transfer care, custody and control of the early operated facilities to the OPCO asset in charge team for startup. ✓ Provide detailed debriefing of early operation lessons learnt to the benefit of both routine and future start up maintenance.

Provide start up assistance for tuning, performance testing, and System trouble shooting and capture lesson
learnt.

Lead Electrical Engineer / Commissioning في McDermott Middle East Inc
  • الإمارات العربية المتحدة
  • يناير 2011 إلى أبريل 2012

Company : McDermott Middle East Inc / Jebel Ali / Dubai / UAE (Short Term Contract) Client : Saudi Armco, Al-khobar.
Project : Upgrade of crude gathering and power supply facilities in Safania Field (Off-Shore Project)

Key Deliverables: ✓ Development of level 3 Pre-Commissioning / Commissioning schedule in conjunction with project Pre-comm. / Comm. Coordinator ✓ Identification of resources (Personnel, Equipment, Materials, Spares and Consumables) ✓ Identification and coordination of vendor assistance during commissioning ✓ Identification and coordination of hiring of specialized test equipment ✓ Identification and coordination of subcontractor needed to perform specialized activities ✓ Preparation of assigned functional test procedure ✓ Preparation of equipment list that require preservation ✓ Clearing and managing punch list ✓ Coordination of discipline Pre-Commissioning / Commissioning activities in the Yard and Offshore ✓ Issue progress report ✓ Manage interface with subcontractor with regards to discipline Pre-Commissioning / Commissioning activities ✓ Provide guidance to junior Engineers. ✓ Preparation of project specific commissioning check sheets to comply with WinPCS

Lead Electrical Engineer / Commissioning في National Petroleum Construction Company (NPCC)
  • الإمارات العربية المتحدة
  • ديسمبر 2008 إلى نوفمبر 2010

Client : Maersk Oil Qatar AS (MOQ) (Project Completion) Project : AL Shaheen Field Development 2005 (Off-Shore Project)

Key Deliverables: ✓ Commissioning of MV switchgears, LV MCC switchgears and Power Panels ✓ Protection Relay Testing ✓ Commissioning of AC and DC UPS 's ✓ Commissioning of Solar Panels, Solar Controller Panels for Telemetry, Gas detection and
Navigational AID systems. ✓ Commissioning of Battery charger system and DC distribution boards. ✓ Commissioning of Lighting Systems. ✓ Testing of Induction Motors ✓ Commissioning and Testing of MV Oil-Filled Power transformers & LV Dry Type Distribution transformers ✓ Identification of System & Sub-system limits and updating of limits in line with latest revision of P&ID's/SLD's ✓ Identification of PTW requirements and the raising of applicable permits to cover commissioning work-scope ✓ Preparation of Electrical System Commissioning Strategy and Plan ✓ Preparation of Electrical Commissioning Dossiers ✓ Determine manpower requirements ✓ Organize and control vendor representatives site visits ✓ Preparation of commissioning spare part list & test equipment requirements ✓ Supervising the site works& monitoring electrical commissioning activities ✓ Issue As-commissioned electrical drawings ✓ Responsible for onshore and offshore commissioning activities ✓ Preparation of OTP's & project specific commissioning check sheets to comply with ICAPS

Apprentice Engineer / Electrical في Southern Railways
  • الهند
  • أبريل 1991 إلى أبريل 1992

✓ Testing and Commissioning of 6 .6 Switchgear Systems, LT Switchgear Systems and all Electrical Equipment's. ✓ Commissioning of AC and DC UPS's ✓ Erection and Commissioning of Generator Relay panels and Generator Control panels, SF6 Circuit Breakers, MIMIC & Control Panels, 11 / 110 KV 90MVA & 50 MVA Power Transformers, 11/6.6 KV 15MVA Station Auxiliary Transformers
(SAT), 6.6 KV / 0. 433 KV 2.25 MVA Unit Auxiliary Transformers (UAT) ✓ Earthing arrangements of all the Equipment's.

Position : Apprentice Engineer / Electrical (April'91- April'92) Company: Southern Railways / Tiruchirapalli / Government of India

Key Deliverables: ✓ Erection, Commission, POH and Maintenance of HT & LT Systems and Substations. ✓ Erection, Commission, POH and Maintenance of Electrical Equipments and Machineries. ✓ Maintenance and POH of Electrical Equipments in Train lighting and Air- conditioning ✓ Preparation of Drawings and Detailed Estimates.

Specialties & Skills

CIRCUIT BREAKERS
COMMISSIONING
DESALTER
ELECTRICAL EQUIPMENT
GAS TURBINE
MANAGEMENT
PLANNING
ELECTRICITY
TECHNICAL SERVICES

اللغات

التاميلية
متمرّس
الملايام
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس