مجموع سنوات الخبرة :15 years, 3 أشهر

Senior Project Controls Engineer في Archirodon Construction (Overseas)
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مارس 2014

Integrated Gas Development (IGD-E1) Expansion Project, UAE, Abu Dhabi Gas and Liquefaction Company (ADGAS), USD 267 Million

Project Scope: Engineering, Procurement and Construction (EPC) of (a) Revetment works including 3D modelling (b) Dredging, reclamation and soil improvement works (c) 60 m Quay Wall (d) Pre-casting and installation of corelocs armour units (e) Piles (f) Retaining wall (g) Drainage infrastructure works (h) Electrical duct banks and cable pits
General Cargo and Liquid Terminal, Port of Salalah, Oman, Ministry of Transport and Communication, Sultanate of Oman, USD 143 Million

Project Scope: Engineering Design (Firefighting system only), Procurement and Construction (EPC) of (a) Revetment works (b) Dredging, reclamation and soil improvement works (c) 1, 100 m Quay wall (d) Pre-casting and installation of 350 units of manholes and pits for infrastructure networks (e) Electrical substations, a multi-storey control room building as well as a prayer and dining facilities building (f) 85, 000m2 of heavy duty interlocks paving (g) Road works (h) 1, 300 m of rails for cranes (i) 3, 600 ton structural steel pipe rack (j) Electromechanical works

Achievements:
• Estimated, prepared, submitted and followed up successful proposals for variation orders under direct supervision of senior management, worth USD 9.2 Million, in a timely manner.
• Played a vital role in maintaining the variance between certified woks and actual work performed within 5%.
• Consolidated the material take-offs and prepared material requirement plans, allowing reduction in material wastages by up to 15%.
• Take-off and procurement of 700 tons of reinforcement steel while keeping the wastage factor under 1.5%.
• Successfully coordinated with the Project’s ENGINEER and supervised a team of draughtsman to finalise civil works IFC drawings besides performing routine Project Control duties at the Port of Salalah Project.
• Coordinated design related matters between the design team and site staff from the project’s Home Office and reducing procedural times by constant follow-up.

Job Profile:
• Generating tender budget at beginning of the project followed by monthly / quarterly updates and rolling forecasts.
• Monitoring costs under different cost centres in comparison with the budget and exercising control.
• Supervising quantity surveyors for preparation of monthly invoices with a focus on maximising revenues.
• Reporting of predefined Key Performance Indicators to the higher management.
• Checking the actual progress of activities on site and comparing it against the planned activities.
• Generating S-curves from actual and planned quantities of work and seeking directions from the Project Manager for control measures.
• Quantifying and arranging for additional requirements of labour, material or equipment as necessary.
• Maintaining of a risk register and enlisting the associated costs that are either positive or negative.
• Preparation of red mark-up drawings in consultation with the construction team to finalise as-built drawings
• Supervising the measurement of final quantities from the as-built drawings and closing of final invoice.
• Preparation of project closeout report with the project team and consolidation of lessons learnt.

Project Controls Engineer في DESCON Engineering Qatar LLC
  • قطر
  • ديسمبر 2011 إلى فبراير 2014

Barzan Onshore Gas Project, Qatar, Qatar Petroleum (QP) & Japan Gas Corporation (JGC), USD 155 Million

Project Scope: (a) Pipe rack foundations (b) Pipe sleepers (c) Equipment foundations (d) Retention ponds (e) U and V ditches around the plant area (f) Valve Chambers (g) Cooling tower with equipment installation (h) Flare erection (i) Metallic and GRP piping (j) Structural steel and equipment erection (k) Laying and energising of up to 132 kv power lines

Achievements:
• Planned, coordinated and monitored timely completion of over 1, 000, 000m3 of earth works and approx. 80, 000 m3 of concrete works including planning of resources to carry out the works while working with Descon Engineering.
• Received a certificate of appreciation from the client for timely completion of one of the project milestones that were the civil works for 3km of 132kv power lines while working with Descon Engineering.
• Estimated, prepared and submitted successful claims worth approx. USD 30 Million under direct supervision of Regional Contracts Manager.

Job Profile:
• Prepared of Budgeted Cost to Complete (BCTC) every quarter.
• Monitored costs under different cost centres in comparison with the budget and exercised control for variances.
• Prepared material requirement plan and conducted procurement of direct materials.
• Consolidated the material consumptions and kept the wastages under desired levels.
• Verified work done with the quantity surveyors to finalise monthly invoices.
• Measuring the construction progress on the principle of Earned Value.
• Updated project progress on the Project Management System (DPMS), in terms of total, completed and remaining quantities and reported the results to the Project Controls Manager.
• Prepared and submitted claims for additional works on site with due consideration to the Contract.
• Compared the actual progress of work done on site against the updated base-line plan and raised red flags in case of slippages.
• Analysed and presented the impact of slippages on the cash flow to the Project Control Manager.
• Ascertained and arranged additional requirements of labour, material, or equipment as necessary.

Assistant Engineer في Civil Works Organisation (Government of Pakistan)
  • باكستان - روالبندي
  • أبريل 2009 إلى أغسطس 2010

Cantonment Infrastructure Works - Rawalpindi, Pakistan, Pakistan Army

Project Scope: Engineering Design, Procurement, Operation and Maintenance of (a) Potable water network complete with wells, pump rooms and overhead tanks (b) 11kv power distribution network linked with the grid station (c) Natural gas distribution network in collaboration with the relevant Government body (d) Road network (e) 60 semidetached houses / villas (f) 15 blocks of apartments (g) Multiple office complex (h) Sports complex (i) Soldier barracks (j) Mechanical transport sheds

Achievements:
• Successfully managed the overall operation and maintenance of a cantonment with a team of 55 technically qualified individuals along with plant, equipment / vehicles.
• Prepared standard operating procedures for routine operations and maintenance works for the new cantonment.
• Initiated and successfully implemented the system for prequalifying, shortlisting and awarding subcontracts for maintenance works.
• Maintained a very high level of motivation and professionalism amongst my team members.

Job Profile:
• Carried out the inspection of existing infrastructure works for any defects regularly.
• Estimated the upcoming requirements of maintenance works and preparation their budget.
• Planned and executed maintenance works as well as supervising the quality of the work.
• Supervised prequalification, bidding, post tender negotiations and award of subcontracts.
• Provided support and technical assistance to the contractors of new constructions.
• Taking over of newly built facilities from the Handing-Over Committee and maintaining records.
• Independently coordinated routine maintenance works with Water and Power Development Authority (WAPDA) for electric power network and Sui Northern Gas Pipelines for natural gas network.

Cost Engineer في Davis Langdon and Seah Pvt. Ltd.
  • باكستان - إسلام أباد
  • يوليو 2008 إلى مارس 2009

Crescent Bay Karachi, Pakistan, EMAAR Pakistan, USD 1.8 Billion
Project Scope: Development of a luxury mixed-use community on Karachi’s waterfront including (a) 45 high-rise buildings (b) Masjids (c) Schools (d) Hospitals (e) Parks (f) Community centres (g) Sports complex (h) Roads and associated infrastructure
Achievements:
• Successfully carried out cost reduction of three high-rise buildings by up to 6% after performing value-engineering exercises under supervision of Lead Principle Quantity Surveyor.
Job Profile:
• Developed skills for cost estimation and quantity surveying.
• Received on-job training and weekly Continual Professional Development (CPD) sessions by Lead Principal Quantity Surveyor that helped me develop skills in Contract Management and Cost Control.
• Actively contributed in preparation of tender documents and letters of intent.
• Actively contributed in preparation of draft contract documents and letter of award.
• Prepared comparative evaluation reports from the bids received from tenderers.
• Evaluated monthly invoices and variation/change order requests from the contractors.
• Sorted and organised post contract correspondence carried out with the contractors and other consultants.

Site Engineer في Habib Rafiq Pvt. Ltd.
  • باكستان - إسلام أباد
  • نوفمبر 2007 إلى يوليو 2008

Islamabad Stock Exchange Towers, Islamabad - Pakistan, Securities and Exchange Commission of Pakistan (SECP), USD 35 Million

Project Scope: Construction of 22 storey high rise complete with (a) Piling and foundation works (b) All civil works (c) Potable water and firewater plumbing works (d) Mechanical installations including elevators and power generators (d) All electrical power works (e) State of the art IT networking system for the stock exchange (f) Fire alarm system

Achievements:
• Successfully carried out my first independent assignment as a Site Engineer, that was to carry out a survey and prepare a shop drawing for connecting the main sewer for the high-rise building to the existing municipality sewer.

Job Profile:
• Conducted the Engineer’s representatives during routine site inspections and concrete pours.
• Supervised preparation of shop drawings and submitted to the Engineer for approval.
• Prepared the daily and monthly progress reports.
• Coordinated and arranged client meetings as and when required.
• Attended the design team meetings along with the Project Manager to discuss build-ability issues.
• Lead the preparation of as built drawings for completed works under direct supervision of the Project Manager.

الخلفية التعليمية

ماجستير, MSc Construction Management
  • في University of Birmingham
  • سبتمبر 2011
بكالوريوس, Civil Engineering
  • في National University of Sciences and Technology
  • مارس 2007

Specialties & Skills

Navisworks
Quantity Surveying
Construction Drawings
Cost Estimating
AutoCAD
Primavera Pertmaster
MS Office
Geo Office
AutoCAD

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Registered Engineer
  • August 2007
Pakistan Engineering Congress
  • Member
  • March 2009
The Institution of Engineers Pakistan
  • Elected Member
  • February 2008