senior project
Smart technologies
Total years of experience :22 years, 3 Months
Manage project of advertisement of Almultaqa in Ramadan (dubai )
- Repairing all fault emergency that happened in substation
- Preparing the periodic maintenance procedures of substation and put plans for preventive maintenance
- Listing the necessary materials purchased to develop the substation
- Operating the substation and study loads and distribution it on outcomer
- Improving the performance of substation
- Study the technical losses of the substation and networks and provide necessary suggestions to decrease the losses
- Put the schedules and policy in the substations
- Study the periodical faults which determines out of substation and effected it and find the solutions for it
-Make sure the diagrams and wire
- Verification of analog signals digitalis
- Modify the logic control program at the station by the program ABB composer
- Modify graphic on the program Power Generation Portable
- Prepare all protocols for equipment DSC center
- To manage and operate substation
- To ensure the safety of substation and equipment and repair the fault which is happened
- To development of plans for preventive maintenance and spotting work
- Establishment of lists of spare parts and determining the time of purchase
- Preparation of schedules of the work of substation
- To provide reports monthly
- Organization of the substation administrative tables
- The study of the delivery of schemes protections ( over current, earth fault, differentional, distance relay )
- Installation and replace the protection in substations
- Adjusting of protections and to know how to use them reading events registered for spotting, to avoid and disaster and conduct of preventive maintenance
- Member of commission on status of the basic criteria for the values of adjustment protections
- Teacher of the foundations of electricity / practical section / for second year flight engineering
- Teacher of industrial network and improvement power factor electric power systems engineering fourth year
- Scrutinizing and amendment the electric diagrams
- Presentation shopdrawing for project
- Preparation the schedules of project
- Implementation the electrical works
- Preparation the reception reports
- Study of the substation schemes, the possibility of implementation, the work plan, the schedules of implementation
- Modify the schemes for development the work of substation
- Connect all equipment and test it and learn who invest it
- Repairing all fault emergency that happened in substation
- Preparing the periodic maintenance procedures of substation and put plans for preventive maintenance
- Listing the necessary materials purchased to develop the substation
- Operating the substation and study loads and distribution it on outcomer
- Improving the performance of substation
- Study the technical losses of the substation and networks and provide necessary suggestions to decrease the losses
- Put the schedules and policy in the substations
- Study the periodical faults which determines out of substation and effected it and find the solutions for it
- Implement internal and outer substation 20/0.4 kv
- Implement an electric line middle and low voltage grounded and aerial
- The head of the commission on the supervision of implement voltage line
- The head of commission of the prepare the terms of electric project, contract and prices
- Member of the commission of experience
design system for controlling by systems of work of the electrical set 66 /20KV through one center
high voltage substation , management generation, load flow current
electrical design and plan, HV substation , generation, protection , machines