sarwar khan, Engineering Manager

sarwar khan

Engineering Manager

Emirates National Oil Company (ENOC Group)

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Etudes secondaires ou équivalent, mechanical Engg
Expérience
21 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 4 Mois

Engineering Manager à Emirates National Oil Company (ENOC Group)
  • Émirats Arabes Unis
  • Je travaille ici depuis février 2007

Managing Engineering department’s activities as functional and administrative head

Design Engineer à National Engineering Services (engineering division of Velath Engineering)
  • Émirats Arabes Unis
  • juin 2006 à février 2007

for U, U2 ‐Stamp audit, ISO Certification/Audit /documentation
* Rechecking//validation design calculation of existing vessels for retesting /hydro test, Design
* Calculation and drawing preparation for re bottoming of API Storage tank.
* Mechanical Design Calculation of structure related to equipment, piping, Pipe racks, pipe support,
Cross over platform etc.
* Prelim design calculation, Review and design verification of tender document for estimation
* To ensure that all work is completed without compromise to quality and is delivered according to the project
schedule

Design Engineer à Grand Prix Pvt. Ltd. Delhi
  • Inde
  • janvier 2003 à juin 2006
  • novembre 2018 à
Project Engineering manager à HORIZON JEBEL ALI TERMINAL LLC
  • Émirats Arabes Unis
  • à

4 km Berth and Jetty pipeline.

08 Project: INCREASE WATER CAPACITY
Client: EPCL Refinery, Dubai
Responsibility - Engineering manager
EPC Contract for construction of 2 Nos. Utility water storage tanks.
As Engineering manager for Design of storage tanks according to API 650. Vent calculation,
Preparing datasheet for equipment and accessories PV Vent, Emergency vent etc. Coordinating
and resolving queries for various sub‐contractors and aligning the design and project
requirements

09 Client: TOTAL LUBRICANTS BLENDING, DUBAI UAE
Responsibility - Engineering manager
Project: EPC Contract for Total Lubricants Manufacturing Plant proposes for integration of old 04
bitumen tanks with lem with pumps, pipeline and automation

10 Project - ELOMP PH.3 AT PLANT AT FUJAIRAH.
Client ‐ ENOC Lubricant and Grease Manufacturing Plant LLC

Design Engineer à AL‐FANAR General Contracting
  • à

Detailed Mechanical Design of 8‐Tank, checking of drawings, and handled all design related
issues till the approval of design and drawings by the consultants.

Design Engineer à ONGC. / Larsen & Turbro Ltd
  • à

Detailed Mechanical Design of 24‐Vessels, checking of drawings, and handled all design related
issues till the approval of design and drawings by the consultants.
24 Project - VERTICAL UNDERGROUND LPG STORAGE TANK.

Design Engineer à Shell. / J. Ray McDermott Middle East Inc
  • à

Project Coordination, Detailed Mechanical Design of 4‐Vessels (SS) & 2 Rectangular Tanks (SS),
checking of all drawings, and handled all design related issues till the approval of design and
drawings by the consultants.
23 Project - UP GRADATION OF

Design Engineer à ENOC Processing Company LLC
  • Émirats Arabes Unis
  • à

plan, pipe rack, pipe support, checking of all drawings and successfully handling all design
related issues till the approval of design and drawings by the consultants.

Design Engineer
  • à

EPC Contract for construction of 16 Vessel, 14 Tank and Piping, Stress analysis of piping, piping

Design Engineer à API
  • Émirats Arabes Unis
  • à

EPC Contract for construction of 2 Nos. of cone roof storage tank
Responsibility -Project Coordination, Mechanical Design Calculation of two nos. of

Design Engineer à MIDDLE EAST LUBE TANK Client ‐ MIDDLE EAST LUBE COMPANY LLC
  • à

Responsibility -Project Coordination, Technical Evolution, Data sheet Preparation Detailed
Mechanical and checking of all drawings and successfully handling all design related issues till
the approval of design and drawings by the client and consultants.
15 Project - EPPCO PIPING MODIFICATION/MAINTENANCE
Client ‐ ENOC
Responsibility - Lead Design Engineer
EPC Contract for construction of FFS revamping
Responsibility -Project Coordination, Technical Evolution, Data sheet Preparation Detailed
Mechanical Design of Piping, Stress analysis of piping, piping plan, pipe rack, pipe support,
checking of all drawings and successfully handling all design related issues till the approval of
design and drawings by the client and consultants.
16 Project - LAM‐28 PLATFORM TOPSIDE.
Client ‐ Dragon Oil.
Responsibility - Lead Design Engineer
Responsibility - Project Coordination, Technical Evolution, Data sheet and Detailed Mechanical
Design calculation of 2Phase Separator, Skid, checking of related drawings and handled all
design related issues till the approval of design and drawings by the consultants.
17 Project - WET CRUDE OIL VESSELS
Client ‐ SOUTH OIL COMPANY
Responsibility - Lead Design Engineer
Responsibility -Project Coordination, Technical evolution, data sheet preparation, Detailed
Mechanical Design of 17 nos. of vessels ( Desalter, Dehydrator, Coalescer and sump tank,
checking of all drawings and successfully handled all design related issues till the approval of
design and drawings by the consultants.
18 Project

Design Engineer à API
  • Émirats Arabes Unis
  • à

EPC Contract for construction of 12 Nos. storage tank
* Design of all the tanks based on

Design Engineer à DUGAS
  • Afghanistan
  • à

EPC Contract for construction of 15 Vessel, 7 Tank and Piping, Stress analysis of piping, piping
plan, pipe rack, pipe support, checking of all drawings and successfully handling all design
related issues till the approval of design and drawings by the consultants.
14 Project - SUPPLY OF

  • à

Product development, planning & progress monitoring of engineering activities
cost optimization/economic analysis, Design Optimization & data sheet/specification preparation
* Manpower and resource planning for engineering department, Co-ordination with planning, PMT, client
and consultant…etc.
* ISO, U Stamp and U2 Stamp documentation, certification and surveillance audit.
* Department procedure development, Process flow chart, Department’s KPI, BSC & managing
department resources and control of internal & external documents, codes &standards.
* Preparation of tender documents, Technical review, issuing TBE, providing support to
marketing/estimation department during bidding phase & Prequalification.
* Analysis of Static equipment, Storage Tanks and Piping, C&S and E&I review as per various
International standards like ASME, API, NFPA & BS etc.

Project à ENOC FUJAIRAH DISTRIBUTION & TRADING TEMINAL
  • à
Design Engineer à HORIZON EMIRATES TERMINAL LLC
  • à

PC Contract for construction of 7 Nos. Jet fuel storage tanks.
esign of Jet fuel tanks according to API 650. Vent calculation, Preparing datasheet for various
quipment and accessories like floating suction, PV Vent, Emergency vent etc. Coordinating and
solving queries for various sub‐contractors and aligning the design and project requirements.

12 Client

Project à FALCON
  • Émirats Arabes Unis
  • à
Engineering manager
  • à

EPC Contract for new Marine Loading Arm (MLA), interconnecting pig‐able product piping, Pig
launcher & receivers, compressed air supply, power distribution system, instrumentation and
control systems, earthing system and all related civil and structural works etc.
05 Project - DUGAS ‐ PRESSURISED PROPANE STORAGE FACILITY
Client ‐ DUGAS
Responsibility - Engineering manager
EPC Contract for construction of 2 Nos. Propane storage sphere as per ASME SEC. VIII DIV.2
Design and detail engineering, procurement and construction of propane storage sphere
according to ASME SEC. VIII DIV.2. propane sphere, with all civil and structural work, piping,
Firefighting system and E&I.
06 Project - PROPANE STORAGE SPHERE ENGINEERING, PROCUREMENT & CONCTRUCTION
OF INPLANT PIPING
Client ‐ DUGAS
Responsibility - Engineering manager
* EPC Contract for in‐plant piping of propane storage sphere
* As Engineering manager for Design of piping, FFS, HAZOP Study, civil and structural
work , Piping and E&I , Coordinating and resolving queries for various sub‐contractors
and aligning the design and project requirements
07 Client: PYRAMID E & C
Project: PETROLEUM REFINERY & PROCESS FACILITY
Responsibility - Engineering manager
* EPC Contract for construction of 20 Nos. storage tanks including Crude and various fuel
products, Fire water, Effluent and Diesel tank. Project also includes Terminal Piping and

  • à

involves design and analysis of Storage Tanks and pressure vessels by manual calculation,
referring ASME &BS Standards and software like PV‐Elite & CODECALC etc
* Preparation and checking of piping layout, isometric drawings etc.
* Preparation and checking of G.A and Fabrication Drawings.
* Design and detail engineering of Skids, TDC & MTO Preparation
* Preparation of data sheet and specification.
* Design Calculation of Rectangular tanks, Preparation of drawing and checking.
* Preliminary design verification and MTO preparation for estimation purpose
* To assist personals during the fabrication process.
* Involved in the U stamp and ISO audit and certification
* Prepare TQ’s and other clarification with client inputs,
* Perform Design calculation of Static Equipment as per ASME Sec. VIII Div.1 & 2,
* Review the Pressure Vessel, & other Inter Disciplinary drawing/documents.
* Prepare RFQ for materials and evaluate the Quotations from suppliers.

  • à

Preparation & Checking of related Engineering Drawings, planning. /scheduling of engineering
deliverables for project.
* Data sheet preparation, RFQ/Tender and Project’s SOW preparation for vendor/ subcontractors
* Leading the team for Engineering vendor’s prequalification & audit
* BV Certified of Internal Auditor for ISO 900 2008 & 2015 and Integrated Management system
* Providing training/technical guidance to UAE Nationals/university students as & when required.
* Leading the team &Managing the KNOX for cylingas and holding the position of Knowledge
management champion in ENOC knowledge management Team for Cylingas.
* Mechanical design calculation of piping and static equipment as per ASTM/ASME, ANSI, API, ASME
SEC. VIII Div. I /Div.2 and PD 5500 etc.
* Design and detail engineering of maintenance work of API tanks, piping and Pressure vessels. etc.
* Project coordination, Technical Evolution of Engineering documents/ Technical Bid evolution for
procurement and Preparation of SOW and tender documents for subcontract
* Process Design Calculation of separator, skid, Thermal Design Calculation of heating coil by manual
and by using FEP software tools. Preparation of Conceptual Engineering and FEED documents.
* Thermal design calculation for heating coil.
* Checking of P&ID, Piping Plan, isometrics, Pressure drop calculation etc.
* Technical review and selection of rotating equipment (like PD, CF Pump etc).
* Preparation of specification, data sheet, equipment life and safety Instruction sheet.
* Preparation /checking of Design calculation and drawings for LPG Tank, LPG piping and LPG fittings
and Propane Tank, Propane/LPG Sphere etc.
* Design Calculation and Supervision of Drawing Preparation/checking of rectangular Tank based on
good engineer practice & various international code/book ..etc.
* Checking /Designing of piping, stress analysis, nozzles and reinforcement, MAWP, pipe supports, pipe
rack ..etc.
* Review of vendor drawings, Piping design for hot oil heat tracing and steam tracing. MTO, data sheet and
spec. preparation/review of Valve, strainer and other equipment and piping.
* Piping stress analysis by using Caesar‐II software., review & checking
* Recommendation for Re‐rating, checking & validation of static equipment, providing supporting
design calculation of existing vessels/tanks for retesting….etc.
* Sizing calculations for various items such as PSV/ TSV, ESD, valves, strainer…etc
* Participation in HAZOP, SIL Assessment, technical clarifications, 3D modelling & Review constructability
review, value engineering & closeout reports….etc
* Input to P&ID, plot plan, cause & effect, design philosophy, package item/equipment procurement…etc

Asst à Nirmal Industries
  • à

Responsibility - Detailed Mechanical Design of Filter Separator and Scrubber, checking of
drawings, and handled all design related issues till the approval of design and drawings by the
consultants.

Éducation

Etudes secondaires ou équivalent, mechanical Engg
  • à Institute of Engg. & Technology, MJP RU UniversityCSJM UniversityICFAI University
  • novembre 2018

Worked as a lecturer of Physics, Chemistry & math for

Baccalauréat, mechanical Engg
  • à Institute of Engg. & Technology, MJP RU UniversityCSJM UniversityICFAI University
  • novembre 2018

Worked as a lecturer of Physics, Chemistry & math for

Baccalauréat, mechanical Engg
  • à Institute of Engg. & Technology, MJP RU UniversityCSJM UniversityICFAI University
  • novembre 2018

Worked as a lecturer of Physics, Chemistry & math for

Specialties & Skills

ADMINISTRATION
FUNCTIONAL
MANAGEMENT
DISEñO DE LA DISPOSICIóN
GRAPHIC DESIGN
SPECIFICATION
AUTOCAD

Langues

Anglais
Expert
Hindi
Expert
Urdu
Expert