السيد  القرموطي, Senior Architect

السيد القرموطي

Senior Architect

ASTAD Project Management

البلد
الولايات المتحدة
التعليم
بكالوريوس, Architecture
الخبرات
31 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :31 years, 2 أشهر

Senior Architect في ASTAD Project Management
  • قطر - الدوحة
  • أبريل 2012 إلى مايو 2018

Onsite Senior Architect for Qatar Petroleum District Project (QPDP) West Bay, Doha- Qatar - Building Includes: Open & cellular Office spaces, Management Suite across nine high-rise towers; Health & Wellness center; Corporate Training facilities; Concourse with food service, etc.; Prayer rooms; Auditorium; five star Hotel; VIP entrance; External plaza & dedicated underground parking; Total Gross Floor Area 690, 940 sq. m.

Duties and Responsibilities include, but not limited to:
Design stage
 Review and determine scopes of work from consultants
 Full design review of consultant submittals throughout all stages
 Observe quality / interdisciplinary coordination issues
 Resolve complex and technical design issues
 Lead the technical team and consultants to ensure that construction documents accurately interpret the intended design.

Construction stage
 Ongoing surveillance and monitoring of CM Consultant supervision
 Participate in routine Weekly QA/QC and site progress review and Technical meetings.
 Oversee base-build progress on site
 Review and approval of Construction Contractors’ submissions, i.e. Material Submittals.
 Review and approval of Mock-ups, Samples etc.
 Reviewing and commentating on subcontractor’s pre- qualifications
 Review & approval of Contractor's Request for Substitutes
 Witness Equipment / Factory / Site Acceptance Tests as required
 Review / concurrence with ongoing RFIs and decisions

Senior Architect في HOK
  • قطر - الدوحة
  • أبريل 2008 إلى يونيو 2012

On site Construction Administration for Hamad International Airport (HIA), (formerly named New Doha International Airport) for Qatar Civil Aviation Authority (QCAA), the new airport constructed on 5, 400-acre site. The first phase construction of the new airport included two runways of 4, 850m and 4, 250m in length, designed specifically to accommodate the new Airbus A380-800 superjumbo. A three-story terminal building, including 350, 000m² of floor space, of which 25, 000m² is dedicated as retail space, and with 9, 300 sq. m. 100 room in-airport hotel along with a 1, 580 sq. m. health spa, a 1, 900 sq. m. public mosque, 3, 100-car parking garage with adjacent ground transportation building, two central utility plants, and a 66, 000 sq. m. state-of-the-art flight catering facility. Phases 1 and 2 concourses have 40 contact gates.

Managing, reviewing and commentating on subcontractor’s pre-qualifications, interiors-related Material data and samples, shop drawings and RFI’s, liaising with HOK Architecture Department, HOK Doha and Overseas Bechtel Engineering Team.


Responsibilities include, but not limited to:
• Reviewing and evaluate contractor’s submittals for lower tier subcontractors and/or venders for major purchase orders relating to past performance in the successful completion of construction work and /or supply of materials and equipment of similar nature.
• Reviewing Materials submittals comprising technical literature, samples and mock-ups as appropriate and in compliance with design specifications.
• Reviewing Shop Drawing submittals in compliance with the design intent.
• Attendance as required at site progress and technical meetings to resolve technical issues.
• Analyze technical/construction/build-ability issue and provide drawings and specifications coordinated with engineering and other disciplines.
• Prepare Field Observation Reports after each site visit using professional terminology, the observation recorded therein serves as a permanent record of the activities, installations, progress of work, weather, site conditions, etc…
• Respond to Contractor's request for information to clarify ambiguities.

Senior Architect في LANGDON WILSON INTERNATIONAL
  • الولايات المتحدة
  • أغسطس 2006 إلى مارس 2008

Senior Architect for Jaber Al Ahmed Al Jaber Al Sabah Hospital & Trauma Center, for the Kuwait Ministry of Health; The Jaber Ahmed Al-Jaber Al-Sabah Hospital project is located in South Surra, Kuwait. The hospital is 1, 120 beds; the total built up area is 270, 000 square meters. The hospital provides a comprehensive range of medical services; comprises Diagnostic and Treatment services, Trauma Center and Casualty services, Outpatient services, Dental services, Ob/Gyn services, Inpatient Care services, VIP Suites for the Visiting Heads of States and also another wing for VIP Suites. Project Value: 1.05 Bn. USD

Responsibility included:

Assists in the development of the design work; leads in the production of technical drawings and specifications; coordinates the related work of the other disciplines.
Facilitate the timely exchange of information between all project team members; assume responsibility for the coordination of all disciplines’ documents, and for insuring that quality control procedures are enforced.
Assume primary responsibility for the daily activities of the architectural project team and the progress of the work and for the technical quality of the Construction Documents (drawings and specifications).
Mentor junior architectural staff assigned to the project.
Help maintain and improve office architectural standards, details and production tools.

Senior Architect في LANGDON WILSON INTERNATIONAL
  • الولايات المتحدة
  • سبتمبر 2004 إلى يوليو 2006

Construction supervision for the Specialized Cardiac Hospital Center in
Kuwait - 152 Beds, 3 Operation Theater and 4 Catheterization labs.
25, 000 m² (14 million Kuwaiti Dinar) (48 million American dolor)

Responsibility included:

Responsible for the day-to-day supervision of architectural works and finishes.
Review Contractor's staff qualifications and CV's to ensure that they are qualified for the Project.
Review sub-contractors pre-qualifications and inspect their shop / factory where required.
Review architectural materials to ensure that they are in accordance with the specifications.
Review shop drawings to ensure that they are in accordance with the design and that they are coordinated with other disciplines on site. Receive feedback from the Site Engineer / Inspector or design office and incorporate their comments.
Review method statements to ensure that the Contractor proposal is feasible and will achieve the intended purpose.
Inspect deliveries / installed / constructed work to ensure that it is in accordance with the shop drawings and the specifications. Review checklists and issue inspection report.
Monitor Contractor's submittals to local authorities and ensure that they are carried out in a timely manner in accordance with the contract documents.
Prepare "Non-Conformance Report" when work is not in accordance with Contract Documents.
Respond to Contractor's request for information to clarify ambiguities.
Attend regular meetings with the Construction team, and the Client to report on progress and help resolve issues where they arise.
Ensure that issues related to local codes, such as health and safety executives and environmental impact issues are complied with.

Coordinate between Architectural and Services Engineers to ensure the smooth progress of the work on site.
Take full charge of site office and perform accordingly in the absence of Resident Engineer.

Project Architect /Assistant Technical Director في DAVIS, CARTER, SCOTT
  • الولايات المتحدة
  • سبتمبر 1997 إلى أغسطس 2004

Responsibilities included:
The primary responsibilities were coordinating and administering assigned projects in office through designed phases of design development, production, permitting and construction contract administration, including the development and production of construction documents for complex projects. Engineering consultant coordination, Establish and modify CAD Standards and Details. Space planning for various tenants, square footage calculations and leasing plans.

Project and Accomplishment:
Washington Hospital Center, Post Partum /Neonatal Unit, Washington, D.C. The design objective was to upgrade the existing semi-private patient suites to completely private suites.
Washington Hospital Center, Cardiac Training and Education Center, Washington, D.C, USA
Interior Architecture for a 70, 000 Square foot Law firm in McLean, Virginia
Interior Architecture for a 350, 000 Square foot, 11 story office building in Washington D.C. for International Law firm
Interior Architecture for a 25, 000 square foot high-tech Internet Company Special amenities include a computer room, employee cafeteria, game room, lounge areas, and touchdown stations for visiting client.
Interior Architecture for 235, 000 square foot build-to-suit regional facility special amenities includes a commercial kitchen and cafeteria, a daycare facility, and a fitness center.
Various commercial, government projects including more than 250, 000 square foot for National Institute of Health. (NIH).

Job Captain في CMSS ARCHITECS
  • الولايات المتحدة
  • فبراير 1996 إلى سبتمبر 1997

Responsibilities included:
Perform Building Code Analysis and confirm the analysis with the Management Team
Develop work plan, including a mini-set, to meet Project deadlines
Assist in preparation of the Cost Estimates, including researching materials
Provide leadership, guidance and training to the Technician
Quality Control Reviews of various Projects in the office when the need arises

Project and Accomplishment
Base Building Architecture for 78.000 sq. foot Highwood’s II Building, Glen Allen· Base Building Architecture for 325, 700 sq. foot Shockoe Plaza, Richmond, VA
Headquarters Building for DEQ 35, 000 sq. foot Woodbridge, Virginia

Project Coordinator/ Associate في EATON DESIGN GROUP
  • الولايات المتحدة
  • أبريل 1987 إلى سبتمبر 1996

Responsibilities included:
Building Code Plan Review including ADA Compliance
Preparation of Design Intent Drawings and Guideline Specifications
Construction Document and Detailing
Construction Administration
Extensive sites visit to review and report construction progress

Project and Accomplishment:
Interior Architecture for a 425, 000 square foot, for Federal Energy Regulatory Commission in Washington D.C.
Interior Architecture for Department of Defense, 120, 000 square foot in Fairfax
Defense Communication Agency 65, 000 square foot in Arlington, Virginia
Institute of Defense Analyses, 98, 000 square foot in Alexandria, Virginia
CACI International, 150, 000 square foot in Arlington, Virginia
Drug Enforcement Agency, 400, 000 square foot in Arlington, Virginia
Rockwell International - F25 159, 000 square foot Herndon, Virginia
Various commercial, government projects in Virginia, Maryland and D.C.

الخلفية التعليمية

بكالوريوس, Architecture
  • في University of Hellwan, College of Engineering Dept. of Architecture
  • يوليو 1979

Specialties & Skills

Interior Architecture
Administration
Production
Experience in Design / Construction Administration, Health Care, Aviation, Commercial Buildings
Ability to review and comment properly on necessary documentation
Understands and implements QA related to Building Codes, Engineering, and Design Standards
Proficient in AutoCAD R12, 13, 14, 2000, 2004, 2005 and 2006
Excellent oral and written communication skills.
Strong technical knowledge in interior details and Hospital fit-out.
Good knowledge of the building code and hospital guidelines
Experience in Technical and Architectural Quality Design Review

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

The American Institute of Architects
  • Assoc. AIA
  • April 1997

التدريب و الشهادات

LEED® Green Associate (الشهادة)
تاريخ الدورة:
December 2010
صالحة لغاية:
May 2017