* Installation of 220 KV XLPE cables in trench with associated civil & mechanical activities with Pulling & Jointing of Cables.
* Spiking of Existing Cables and its diversion.
* In diversion of 220 KV XLPE Cable involved in Installation of Joint Bay, Link Boxes & PD Boxes with Pre-commissioning Electrical tests such as LV Test ( Outer Sheath DC Voltage Test, Phasing of Cables, Insulation Resistance & leakage current test, Earth Resistance Test, link Contact resistance test, Conductor resistance test, Capacitance & Impedance measurement ) & its HVAC test.
* Involved in Splicing & Terminations of DTS and Optical Fiber Cables with its OTDR Test and End to End Test.
* Reported all activities to Project Manager on daily basis.
* Manage & coordinate with Client (KAHRAMAA), Consultant (KEO International Consultants) and Sub Contractors.
* Performed Thermal Resistivity Test of Soil along the Cable route for selection of suitable back filling materials included Testing of FTB (Fluidized Thermal Backfill) & CBS (Cement Base Sand) for EHV cables.
* Installation of Ducts under Highway crossing by Horizontal Directional Drilling (HDD) & Open Cut (OC) Road crossings.
* Handling & Controlling of 132 KV- 2000 Sq. mm XLPE Cable laying jobs in this project such as (Excavation of Trenches, Duct Installations, FTB Bedding, Cable pulling, FOC & DTS Cable Blowing, Cable jointing, Installation of Link Box, PD Box FOC & DTS Box with Splicing, CBS Pouring & Tiles Placement, Backfilling with Compaction Test, LV & HVAC Test of Cable).
* LOA & PTW Permit Holder provided by KAHRAMAA.
* Prepared Daily & Weekly Progress Reports with Schedule related to Project and submitted to Client, Consultant and Project Manager
* Laying of 66 KV Power (XLPE) Cable and involved in related Civil and Electrical works of Cable.
* Performed LV and HV Test of Diverted 66 KV Power (XLPE) Cable
* Review of Client approved Drawings and involved in Surveyor Marking Activities for the Execution of Civil & Electrical works.
* LOA and PTW holder provided by KAHRAMAA.
* Coordination with Execution team for Project works about Progress.
* Corrections of T punch/snag point for Installation given by Client / Consultant.
* Involved in Installation of 132 KV 2000 SQ MM XLPE Cable with ODSE -Termination and connection through Gantry structures to Power Transformer.
* Involved in HV - CONNEX PLUG - IN techniques of 132 KV - 2000 SQ MM XLPE Cable Termination to GIS (Gas Insulated Switchgears) inside Substation.
* Check & Maintain all Breakers such as VCB, SF6, ACB, MCCB, MCB & RCD's
* Check All Day Consumption and maintain it with the satisfaction of Client.
* Maintain the HV Panel, LV Panels and all Building Electrical Installation.
* Resolved Problem of Shutdown during fault by shifting of Bus-Coupler from Transformers to Generators.
* Manage & Coordinate with Client & Reporting to Senior Electrical Engineer on daily basis.
- Company industry:
- Electric Power Production & Transmission
- Job role:
-
Electrical Engineering