Electrical Supervisor
Technip Qatar
Total years of experience :12 years, 0 Months
I Have to Work In Qatar As An Electrical Supervisor Area Was Brown Field And Green Field.I Handle Subcontractor People and Supervision My Job here on the Site and in Office See the Drrawing on PC then check On the site About Drawing Perfect Location For install Equipment(J.B., Light Fixture, and Route for Tray in the Field.Sometime i Make Asbuit of Drawing If Some Location Will Be Change.After Submit RFI.And Attend Meeting If Checksheet Will Be Open or Official Meeting. If Client Write Some Coments Like Punchlist then I Close on the site then i Close in My PC WinPCS.
I Handle Subcontractor People and Supervision My Job here on the Site and in Office See the Drrawing on PC then check On the site About Drawing Perfect Location For install Equipment(J.B., Light Fixture, and Route for Tray in the Field.Sometime i Make Asbuit of Drawing If Some Location Will Be Change.After Submit RFI.And Attend Meeting If Checksheet Will Be Open or Official Meeting. If Client Write Some Coments Like Punchlist then I Close on the site then i Close in My PC WinPCS.
Cable Laying, Cable Glanding, Cable Tray Installation.Mcc/Pcc/Fcc & Switchgear Installation.Cable Glanding & Cable Termination & Motor, Transformer, Mcc, Pcc, Fcc, Cable Continuity & Megger Test, Lighting Installation, Lighting Pannels & Junction Boxes Installation.
Marshalling Cabinets, Dcs Pannels, Junction Boxes Installation.
Preparation Of As-Built After Completion Of The Projects.
All Type Of Electrical And Instrumentation Materials Inspection Like HV/MV/LV Control Cable And Multi Core Cable And Single Pair Cable, Fibres Optic Cable, HV/MV/LV Switchgear And Control Pannel, MV/LV Motor, Step-Up Transformer, Step-Down Transformer, Generator, Mcc, Pcc, Control And Marshalling Cabinet, All Type Of Smart Transmitters, Pressure Switches,
Pressure Guages, Instrument Tube, Instrument Protection Boxes, Cable Tray, Angle Bar All Consumable Materials That Is Required For E & I Construction Works After Inspection Preparation Report If Any Damage Preparation OSD Report Day To Day Progress Report To QA/QC Manager.
Cable Glanding & Cable Termination & Motor, Transformer, Mcc, Pcc, Fcc, Cable Continuity & Megger Test, Lighting Installation, Lighting Pannels & Junction Boxes Installation.• Marshalling Cabinets, Dcs Pannels, Junction Boxes Installation.• Mcc/Pcc/Fcc & Switchgear Installation.Cable Laying, Cable Glanding, Cable Tray Installation.
Cable Glanding & Cable Termination & Motor, Transformer, Mcc, Pcc, Fcc, Cable Continuity & Megger Test, Lighting Installation, Lighting Pannels & Junction Boxes Installation. Wiring, Conduiting, Electrical Equipment Installation.
• * Passed Diploma in Electrical Engineering, Calcutta, West Bengal in 1996. • Passed Diploma of Computer Science from Babbage Computer Centre, Bihar Sharif,
• ☞ Passed High School Certificate from Bihar Intermediate Education Council, Patna in 1993.
• ☞ Passed Secondary School Certificate from Bihar School Examination Board, Patna in 1991.