ELECTRICAL FIELD SUPERVISOR
SECO
Total years of experience :22 years, 9 Months
JOB DESCRIPTION
•Installation of 33/11Kv Transformer.
•Installation of HT and LT Panel.
•Installation of HT Bus duct 11KV.
•Installation treated and non-treated earthing.
•Erection of all types of electrical cable trays, Main lighting, dry type transformer 150 KVA, etc.
•Installation of lighting poles.
•Punch list clearance and hand over the plant for operation
JOB DESCRIPTION
•Installation & Commissioning of 1.25 MVA Transformer, Switchgear unit 11Kv.
•Installation of HT Bus duct 11KV.
•Installation of earthing.
•Erection of all types of electrical cable trays
JOB DESCRIPTION
•Installation & Commissioning of 11/2.5 MVA Transformer, Switchgear unit 6.6Kv.
•Installation of PMCC & MCC.
•Installation of LT Bus duct 440V.
•Installation of treated and non-treated earthing.
•Erection of all types of electrical cable trays, Lighting poles, earthing, JB, s, Main lighting dry type transformer 200 KVA, etc
Erection Work:
•Erection of 11KV, 6.6KV and 415V switchgears and power transformers.
•Erection of 4*750AH UPS batteries.
•Erection of 220v, 3000AH Main plant battery.
•Erection of Cable Trays and laying of HT and LT Cables.
•Maintaining the quality procedures for works carried at site.
•Erection of Pole mounted lighting, wall mounted lighting and street lighting pole.
•UAT 2.5 MVA 11KV/415V (Siemens),
•4 ESP T/F Rectifier (HIND RECTIFIER LTD)
•HT Circuit Breakers Vacuum circuit breaker (11KVs)
•Operation & Maintenance of VCB, ACB, MCCB, MPCB & LT PMCC Panels.
•Operation & Maintenance of CT&PT, LAs, Isolators,
•Planning of Plant Shutdown Works & its Executes with proper manpower handling.
•Daily Maintenance of the power consumption report.
•Daily Preparation of Preventive Maintenance formats.
Testing and Commissioning:
•Testing and commissioning of Low and Medium voltage Switchgears (Chinese and ABB Switchgear's).
•Testing and commissioning of two number of ACS5000VFD cabinets for ID fan motor rated 4.3MVA.
•Testing and commissioning of HT and LT motors.
•Commissioned 7 number of HT motors ranges from 1MW to4MW (11KV&6.6KV).
•Testing and commissioning of 56 numbers 150KVA, 415V/75KV oil cooled transformer for ESP.
•Testing and commissioning of Transformers up to 2.5MVA.
•Testing of HT / LT cables.
•Testing and commissioning of soot blowers for coal fired boilers.
•Commissioned two number of Rotary APH.
•Preparation inspection documents, compiling reports, as built drawings and
•Punch list clearance and hand over the plant for operation
Erection of 11KV, 6.6KV and 415V switchgears and power transformers.
•Erection of Cable Trays and laying of HT and LT Cables.
•Maintaining the quality procedures for works carried at site.
•Erection of Pole mounted lighting, wall mounted lighting and street lighting pole.
•UAT & SAT 2.5 MVA 11KV/415V (Siemens),
•HT Circuit Breakers Vacuum circuit breaker (11KVs)
•Operation & Maintenance of VCB, ACB, MCCB, MPCB & LT PMCC Panels
•Operation & Maintenance of CT&PT, LAs, Isolators,
•Planning of Plant Shutdown Works & its Executes with proper manpower handling.
•Daily Maintenance of the power consumption report.
•Daily Preparation of Preventive Maintenance formats.
PROJECT-6
Dismantling and assembling of distribution transformer up to 2x 2.5MVA/ 11KV.
•Communication maintenance, Main plant lighting works.
•Preventive maintenance testing of relays ( O/C, E/F, U/V, Motor protection).
•LT Motors service and maintenance and electrical equipment’s repairing works.
•Relay restricted earth fault relay, overload relay & commissioning.
•Operation and maintenance of UPS 400 KVA
•DG maintenance up to 1800KVA(AMF)
JOB DESCRIPTION
•Preventive maintenance of all type of electrical and electronics equipment’s.
•Operation and maintenance of 11kv, 22kv, 250KVA Transformer.
•Preventive maintenance testing of relays ( O/C, E/F, U/V, Motor protection).
•Operational and maintenance of UPS 400 KVA.
•Operational and maintenance of MV, HV, Metering Panel.
More than sixteen (16) years of dedicated work experience in various technical and engineering disciplines. Works involved in electrical Construction works such as Cable Glanding, Termination & Testing, power cable tray, roughing-in of all conduit pipes, pulling of high and low tension cables, control cables, high voltage insulation and hook-up as well, including grounding system. Fabrication works and other electrical work related.
Key Skills
Provides technical assistance regarding estimates of materials needed for the construction.
Prepares work schedule / manpower loads / daily activities
Field supervision / oversee and monitoring of all related electrical works from cable trenches and aboveground installation.
Supervision on the installation of high voltage and medium voltage switch gears, motor control center (MCC), power transformers from 33kv / 6.6kv / 0.4kv and all related control panels, remote control units and pushbutton switches.
Supervision on the installation of lighting fixtures and small power socket outlets.
Supervision and assist in the installation of power cable tray, roughing-in of all conduit pipes, pulling of high and low tension cables, control cables, termination, high voltage insulation and hook-up as well, including grounding system.
Co-ordinate accordingly with subcontractor all related electrical works that requires permit, such as excavation, hot and cold permits.
Initiate punch list items upon completion of each process system area prior to turnover / pre-commissioning.
Report directly all related work activities to my supervisor and monitor the enforcement of company’s safety policy’s and regulation which is the no. 1 priority
ENERGY SAVING PROJECT, 22MW GAS TURBINE PLANT
J3 Reliance Project Benzan Recovery unit & Scanfiner, Jamnagar
Project : 2x600MW Coastal Energen Private Ltd., Tamil Nadu
Project : 2x250 MW BHEL Ltd, Tamil Nadu
Project : 33/11 KVA Sub station inTaif
courses: Electrical C-License No. C 42758 •