seyed amir jahani,  Projects manager

seyed amir jahani

Projects manager

Rahbord Energy

Location
Iran
Education
Bachelor's degree, Civil Engineering
Experience
30 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 9 Months

Projects manager at Rahbord Energy
  • Iran
  • My current job since March 2018

MD consultant and managing project managers for engineering projects and also engineering part of EPC projects to be done on time and on a budget

Project Engineer Manager at Jondishapour co
  • Iran
  • May 2017 to March 2018

Engineering head for the following projects:

 Fajr petrochemical company
o ABS / Rubber plant EPC project, (240 mm Euro )

 Qeshm oil plant completion EPC project

Business Development Manager at Rahbord haye hooshmand
  • Iran
  • November 2016 to May 2017

Business development & Tenders Manager

Project manager at Rahbord haye hooshmand
  • Iran - Tehran
  • October 2008 to November 2016

Share holder and Project manager for offshore projects
 Hengam EPC project, (Brown Field)
(98 mm Euro)
Construction and installation of 3 offshore topside well head platform. 3 x 2500 ton, Including helideck, main deck, cellar deck and drain deck.
And Construction and installation of Infield subsea pipeline for the platforms, 14”oil + 4.5” MEG piggy back, 1400 + 2700 meter long, including tie-in spools (21 pieces) plus retrofit risers (8 x 4.5” + 2 x 14”), 70-75 meter water depth. This part of job was done by C-Master pipe lay barge for laying. Riser & spool installation was done by DULAM diving co. (UAE)
And 2x45 km submarine cable from offshore to onshore (procurement stage).Client, Iranian Offshore Oil Company

 Foroozan offshore complex. (Brown field) EPC project.,
(138 mm Euro including 7.8 mm Euro for engineering part )
Engineering (Basic & detail) for renovation and reconstruction of 5 existing offshore platforms, 2 wellhead, 2 production & one LQ, plus 2 new LQ modules, Basic engineering was done by Ranhill Worley Parsons, RWP, detail design done by ISI engineering inhouse team.
Client, Iranian Offshore Oil Company.

 Kharg Island Gas gathering & NGL recovery - Export jetty top side, EPC project - completed.
Engineering (Basic & detail) of jetty for export of condensate, pentane and LPG, sea water intake (56, 000 m³/day) and 2 km pipe rack (24 pipe 6”- 36”)

Project manager at Paravar consultant engineering co
  • Iran
  • August 2006 to October 2008

Project Manager for engineering part of the following projects:

 Cheshme khosh wellheads facilities, infield and export pipelines (EPC)
EPC of 4 production, 2 injection wellheads facilities and 19 km 6", 12 km 8", 60km 10" pipelines.

 Salman fire water system. (Brown field) Revamping.
Engineering of Salman offshore complex (8 platforms) for revamping of existing fire water system.

Project coordinator / Project Manager at Iranian offshore oil co.
  • Iran
  • October 2001 to August 2006

Aboozar subsea pipeline project
Construction and installation of 24" main oil export pipeline, 80 km in offshore / 1.5 km onshore. Including top side tie in, new retrofit riser, spool pieces and also shore pulling.
Designed by J P KENNY & laid by Valentine Maritime Co. UAE.

Project coordinator for following projects:

•Kharg Island gas gathering and NGL recovery project
•Construction and installation of 2 Gas compressor platform that were installed by float over method.
•Construction and installation of 175 km subsea gas pipeline, 26” to 12”
Designed by J P KENNY & laid by Valentine Maritime Co. UAE.


•Sirri subsea pipeline projects.
•Construction and installation of 12” subsea pipeline from Sirri Island to Kish Island, 105 km app.
•Construction and installation of 12” subsea pipeline from Sirri Island to Qeshm Island, 95 km app.
Project was done by SAIPEM.

•FEED study of Sirri island gas gathering and NGL recovery projects,
Which was down by John Brown Hydrocarbon & CBI Co.

•FEED study of Kharg island gas gathering and NGL recovery projects,
Which was down

Field engineer at Offshore Engineering & Construction Company (IOEC)
  • Iran
  • July 2000 to October 2001

Pipe laying of 32” submarine pipeline and SBM installation of south pars gas field development (Phase 1) project.

•Subsea cable & pipe laying of ABOOZAR development. 10”, 12”, 16”, 18” and 24” submarine pipeline with 45 km long and 55km submarine cable, project .

•Load out of concrete coated pipeline of south pars gas field development Phases 2 & 3 (56 shipment of 32” and 4”) project.

•Supervisor of ABOOZAR-1200 (derrick lay barge) during conversion

Project Engineer at Iranian Offshore Oil Co.
  • Iran
  • August 1995 to October 2000

Project Engineer for offshore and onshore projects

Site engineer
  • August 1993 to August 1995

120 km, 20” buried gas pipeline (onshore) project from Tabriz to Azarshahr,

Education

Bachelor's degree, Civil Engineering
  • at Ferdowsi University
  • January 1993

Specialties & Skills

Offshore
Pipelines
Onshore
MICROSOFT WINDOWS 98
PROCUREMENT
MS office

Languages

English
Intermediate
Persian
Native Speaker

Hobbies

  • walking, Watching movies,