Shady Abouelela, Process and Production Manager

Shady Abouelela

Process and Production Manager

FRESH for Home Appliances

Location
Egypt - Cairo
Education
Bachelor's degree, Engineering
Experience
14 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 8 Months

Process and Production Manager at FRESH for Home Appliances
  • Egypt - Cairo
  • My current job since April 2018

Process manager for Motors Factory

Effectuation:

1- Design New Layout with Team Work from China

2- Following the Load the Machine from China to Egypt

3- Make Aching Plan for This Project

4- Follow up the electro-mechanically installation

5- Make Start up for each machine in Factory ( High Speed Press, aluminum Die Cast, inserting shaft, CNC, Winding Line, Varnish Oven and Assembly Line)

6- Make new reports system for Production, quality, rework and maintenance

7- Used All new report to make analysis daily, weekly, monthly and yearly  

8- Make Line balance between process and make the process sheet for all process also make time analysis foe each process in the factory

9- Decrease the rework percentage from 19% to 2%

10- Decrease the Defect percentage from 3% to 0.5%

11- Increase the Performance percentage from 60% to 97%

12- Increase the Production from 16000 motors/month to 209000 motors/month

13- Apply the FIFO between Process also apply 5S System to help us to apply the Lean Manufactory

14- Make Maintenance plan for the mould of high speed press also for aluminum Die cast

 

Note: I Was Going To China 21 Days in YC Motor Factory For:

a) Test Some Machines

b) Check All Maintenance and Operation manuals

c) Continue working there and discuss the problem and how to solve it

d) Make Report About Missing Machine For Our Motors Factory

Engineering manager at Nerhadou International
  • Egypt - Cairo
  • January 2016 to April 2018

Manager of Engineering Department for Nerhadou Factory
Effectuation :
1- Received the production machine and installation and take training
2- Received the heavy equipment ( generator, chiller, compressor, boiler and cooling tower )
3- Make start up for the electro-mechanically (HVAC, BMS, generator, chiller, compressor, cooling tower, boiler, UPS, fire alarm and fire fighting system & pumps)
4- Make start up for the Production machine
5- Make schedule of Preventive Maintenance for heavy equipment and activate this schedule
6- Make SOP for all equipment and maintenance Police
7- Make Maintenance for any thank in electro-mechanically, Heavy equipment, production machine and administration building

Project Manager at Almajal Serves Master
  • Saudi Arabia - Abha
  • April 2014 to January 2016

Project Manager (Maintenance electro-mechanically) For Al-Rajhi Bank branches in South Area
Effectuation:
1- Make the Preventive Maintenance for all Branch every month
1- Check the electrical panels electrical cable, lighting and UPS
2- Check the HVAC
3- Check all pipe for plumping and hand shower
4- Check the carpentry, glass door, locks, all door and curtain
5- Check the painting inside and outside and check cladding
2- Solve any job order in 24 hour
3- Increase the performance from 85% to 96%

Line manager for maintenance and Process at Fresh Electric for Home Appliances
  • Egypt - Cairo
  • April 2013 to April 2014

Line manager for maintenance and Process for new Refrigerator Factory
Effectuation :
1- Design New Layout with Team Work
2- Following the Load the Machine from Italy and Download at Georgia
3- Make Aching Plan for This Project

Line manager for maintenance and Process at Fresh Electric for Home Appliances in Georgia
  • Georgia
  • May 2012 to April 2013

Refrigerator Factor
Line manager for maintenance and Process for new Refrigerator Factory
Effectuation: 1- Design New Layout With Team Work
2- Following the Load The Machine From Italy and Download at Georgia
3- Make Aching Plan For This Project
Note: I Was Going To Italy 22 Days For:
a) Machine Testing
b) Check All Dimensions Machines
c) Check Foundation Dimensions For Same Machine
d) Make Report About Missing Machine For Georgia Factory

Line manager for maintenance and Process at Fresh Electric for Home Appliances
  • Egypt - Cairo
  • January 2010 to May 2012

Electric Water Heater Factor (January 2010 ----- May 2012)
Welding Line & Assemble Line (July 2010 ----- May 2012)
Welding Line: Line manager for maintenance and Process in Welding Line for the Electric Water Heater Factor.
Effectuation: 1- Increase unit per hour 19% by applying lean manufactory.
2- Decrease rework from 6% to 4% by applying 6 tools.

Assembly Line: Line manager for maintenance and Process in Assembly Line for the Electric Water Heater Factor.
Effectuation: 1- Increase unit per hour 18% by applying lean manufactory.
2- Decrease Line stop from 10% to 3% by applying change in layout.

Assemble Line (April 2010 ----- July 2010)
Assembly Line: Line manager for maintenance and Process in Assembly Line for the Electric Water Heater Factor.

Enamel Line (January 2010 ----- April 2010)
Enamel Line: Line manager for maintenance and Process in Enamel Line for the Electric Water Heater Factor.
.

Designer Engineer for Kitchen by AutoCAD Program, 3D Home Program, Kitchen Draw Program at El-Sallab for Trade and Import
  • Egypt - Cairo
  • October 2009 to January 2010

El-Sallab for Trade and Import (October 2009
January 2010) Designer Engineer for Kitchen by AutoCAD Program, 3D Home Program, Kitchen Draw Program, Sketch up Program.

Education

Bachelor's degree, Engineering
  • at Culture and Science Academy
  • July 2009

Culture and Science Academy. High Institute of Engineering. Degree awarded: B.Engineering. Department: Mechatronics. Major grade: good plus. Graduation date: 2009. Graduation project Design and Execution Shrink Packing Machine (excellent) Course

Specialties & Skills

Facility Management
Management
Lean Manufacturing
Manufacturing
AUTO CAD
KAIZEN Report
MICROSOFT OFFICE
Fire Fighting
Lean manufactory
6 Tools
6 Sigma
5S System
Solid Work
maintenance
production planning
problem solving
operations management
lean manufacturing
production management
production work
operation
line management
line production
process engineering
labor management
maintenance management
plant maintenance
planning
manufacturing operations
lean sigma
engineering management
manufacturing engineering

Languages

Arabic
Expert
English
Expert

Memberships

نقابة المهندسين
  • عضوية عامة
  • January 2010
هيئة المهندسين السعودية
  • عضوية عامة
  • April 2014

Training and Certifications

PMP Essentials (Certificate)
Date Attended:
May 2023
facility management (AUC) (Certificate)
Date Attended:
February 2023
production management (AUC) (Certificate)
Date Attended:
September 2022
OEE (Certificate)
Date Attended:
January 2020
Mini MPA (Certificate)
Date Attended:
March 2022
Summer Training (Training)
Training Institute:
Nestle – 6 October, Egypt
Date Attended:
July 2006
Summer Training (Training)
Training Institute:
Nestle – 6 October, Egypt
Date Attended:
July 2007
Microcontroller (Training)
Training Institute:
Cairo University
Date Attended:
July 2008
6 Sigma (Training)
Training Institute:
Fresh Company
Date Attended:
April 2010
PLC (Training)
Training Institute:
Cairo University
Date Attended:
August 2008
SMED (Training)
Training Institute:
Fresh Company
Date Attended:
March 2010
Lean manufactory (Training)
Training Institute:
Fresh Company
Date Attended:
May 2010
6 Tools (Training)
Training Institute:
Fresh Company
Date Attended:
April 2010