Mechanical Engineer
General Electric (GE)
Total des années d'expérience :18 years, 6 Mois
Working for leading Executive team of engineers and technician while performing the Scheduled, Corrective Maintenance for Gas Turbine & Compressor by providing the team with all technical documents, technical information’s for supporting the jobs to be finalized correctly according to the standards procedure and in the planned time
Working for leading Executive team of engineers and technician while performing the Scheduled, Corrective Maintenance for Gas Turbine & Compressor by providing the team with all technical documents, technical information’s for supporting the jobs to be finalized correctly according to the standards procedure and in the planned time
QA & QC for new material in and old material out for (6) Gas turbines (MS5002D) NUOVO PIGNONE - ELNG, Idco, Egyp
- Combustion Inspection for (MS 5002D, MS5002D+) GE gas turbine by replacing Secondary fuel nozzle, Liner Cap, Liner, Retainers, cross fire, tube and transition pieces in, ELNG, Idco, Egypt. (Four times)
- Hot Gas Path inspection for MS 5002D GE gas turbine by replacing first stage Nozzles and second stage nozzles variable angles (visual inspection) first stage buckets Replacement and Update the turbine blades from (D Extendor) To (D+ Extendor) and checks the clearances in Egyptian-LNG plant. (Four Times)
- Replacement of Dry gas Seal, tertiary seal, journal bearing pads& thrust bearing
Pads for 3MCL1405” NUOVO PIGNONE Centrifugal Compressor in - ELNG, Idco, Egypt.
- Overhaul maintenance for (Centrifugal, Immersed, Submerged, and Plunger type pump, high speed pumps, and low speed pumps) in MIDOR, Alexandria, Egypt.
- Overhauling maintenance for More than 100 fan coolers (Induced
& Forced - Fixed blades, Variable blades) in MIDOR, Alexandria, Egypt.
- Multiple Overhauling for Dresser-Rand and NUOVO PIGNONE Reciprocating Compressors in MIDOR Site, Alexandria, Egypt.
- Overhauling for (MAN TURBO) six stages Centrifugal Compressor (bearing replacement, stages balance, shaft balance, shaft replacement) in MIDOR Site, Alexandria, Egypt.
Watania Company for Industrial Installation- Alexandria, Egypt
Working as: Mechanical Supervisor for Installations of pipelines of Fire protection and Air Condition systems with their pumps and sprinklers, and diffusers.
I have been graduated from Alexandria university - Faculty of engineering in June 2005 by a grad of Good, and join multi nationals company in the field of services and construction in the oil and gas fields and now am working for GE Oil & Gas. Best Regards Shady Attia