Total des années d'expérience: 12 Années, 9 Mois
juin 2013
A À présent
maintenance Planning Engineer
à EZZ Steel - Petrochemical plant
Lieu :
Egypte - Suez
1. Responsible for commission electrical & instruments Activities, and responsible for making failure report for all electrical and instruments asset in DRP during commissioning phase
2. Responsible for condition monitoring (vibration analysis, thermal image and power quality) for All Electrical Assets (Transformers, MV switchgear, LV switchboard and equipment).
3. Responsible for covering all Corrective Maintenance activity for MV and LV equipment.
4. Responsible for covering all Preventive Maintenance activities for MV and LV equipment to maximize the plant availability.
5. Use eAM Oracle maintenance planning application for running equipment.
6. Identify, design and propose to management technical maintenance improvements and/or developments based on plant, equipment and/or process requirements, implementing approved plans as appropriate in order to support the continual technical improvement of maintenance provision
7. Prepare operating standards for the operation and maintenance of new plant, equipment and/or production systems in order to ensure optimal performance
8. Use specialist engineering skills and techniques to evaluate and solve technical plant, process maintenance issues and problems in order to support the achievement of uninterrupted production
9. Provide technical advice and support to Technicians on non-routine plant and process problems, applying specialist skills and knowledge to ensure problems are resolved quickly and effectively
10. Prepare reports on the full range of engineering and maintenance issues in order to ensure that senior management have sufficient information to support decision making
11. Co-ordinate and organize meetings for OSP manpower, earth moving equipment, scaffolding and any other special OSP requirement for shutdown and for emergency requirements.
2. Responsible for condition monitoring (vibration analysis, thermal image and power quality) for All Electrical Assets (Transformers, MV switchgear, LV switchboard and equipment).
3. Responsible for covering all Corrective Maintenance activity for MV and LV equipment.
4. Responsible for covering all Preventive Maintenance activities for MV and LV equipment to maximize the plant availability.
5. Use eAM Oracle maintenance planning application for running equipment.
6. Identify, design and propose to management technical maintenance improvements and/or developments based on plant, equipment and/or process requirements, implementing approved plans as appropriate in order to support the continual technical improvement of maintenance provision
7. Prepare operating standards for the operation and maintenance of new plant, equipment and/or production systems in order to ensure optimal performance
8. Use specialist engineering skills and techniques to evaluate and solve technical plant, process maintenance issues and problems in order to support the achievement of uninterrupted production
9. Provide technical advice and support to Technicians on non-routine plant and process problems, applying specialist skills and knowledge to ensure problems are resolved quickly and effectively
10. Prepare reports on the full range of engineering and maintenance issues in order to ensure that senior management have sufficient information to support decision making
11. Co-ordinate and organize meetings for OSP manpower, earth moving equipment, scaffolding and any other special OSP requirement for shutdown and for emergency requirements.
mai 2012
A À présent
process engineer
à الشركة المصرية الفرنسية لصوامع التخزين ومعدات المناولة والمعدات الصناعية
Lieu :
Egypte
عمل تصميم اللوحات الكهربية الخاصة بالمواقع وتركيبها
الاشراف علي جميع عمليات التركيب داخل المصنع وجميع الاعمال الكهربية
الاشراف علي جميع عمليات التركيب داخل المصنع وجميع الاعمال الكهربية
janvier 2012
A À présent
electric Executive Engineer
à شركة وادي النيل للمقاولات والاستثمار العقاري
Lieu :
Egypte - Le Caire
electric Executive Engineer
septembre 2012
A juin 2013
process & quality control engineer
à Gerico Agro-industerial engineering
Lieu :
Vietnam
Working in VIETNAM as site quality control engineer with GERICO COMPANY in industerial site working in installing, testing and commissioning levels with french and spanish stuff. I have experience in design and supervise installing the following :
- Earthing system, cable tray, instrumentation, PLC, testing, commissioning, how to follow the work and take care of what the customer need .
- Earthing system, cable tray, instrumentation, PLC, testing, commissioning, how to follow the work and take care of what the customer need .
juillet 2009
A septembre 2009
مهندس كهرباء قوي
à بتروجيت
Lieu :
Egypte - Suez
i was training as electrical power engineer
juin 2008
A septembre 2008
مهندس كهرباء قوي
à هيئة قناة السويس
Lieu :
Egypte - Suez
i was training as electrical engineer in suez canal authority
Partager sur Facebook
Partager sur Twitter
Partager via Email