senior civil engineer في EMC
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ ديسمبر 2012

1. Cables route surveys, identifying corridor obstruction & resolving the same at site.
2. Preparation of the plan for work, the coordination for Surveying , quantity surveyor.
3. Assist in obtaining NOC from various government authorities to execute works at site.
4. Supervision of NDRC and micro tunneling works, complete route surveys and taking trail pits for finding out existing ground services before proceeding with works.
5. Review current status of both engineering and procurement for the project.
6. Plan and manage manpower requirement and distribution.
7. Construction of duct bank as RCC or PC for road crossings by open-cut.
8. Trench excavation under asphalt/tiles/grass and backfill/reinstatebin formation layer as per client/consultant requirements and specification.
9. Oversee high voltage 11kv cables laying activity.
10. Evaluate the overall project construction to ensure compliance with all government.
11. Preparation the as-built drawings, reinstatement work in accordance with local statutory authority.

Project Engineer في AMANA PIPELINES CONSTRUCTIONS
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أبريل 2011

Solar Collector Modules project (Masdar)

1. Responsible for the production of the solar collector modules at the SCA factory and erected at the field (site).
2. Preparation of the plan for work, the coordination for Surveying, quantity surveyor for the intermediate and central support.
3. Coordination with authority (UTE ABENER TEYMA).
4. Preparation of the plan for the tube work (welding, RT tube, fix on the modules in the site.

Project Engineer في Al Kharafi Constructions (MAK)
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2008 إلى أبريل 2010

Dubai Logistics City (Jebel Ali Airport)
1. Responsible for the execution of infrastructure work.
2. Preparation of the plan for work, the coordination for Surveying, quantity
surveyor.
3. Coordination with different authorities (DEWA, Etisalat…etc)
4. Supervising all infrastructure work as pipe lines, champers /manholes (drainage,
sewerage, chilled water, water supply - fire fighting - telephone, Power …etc).including road marking and sign board), Fence work, Pipe lines, champers
/manholes (drainage, sewerage, water supply, fire fighting, foam lines, Power
…etc).

Site Engineer في AL‐BASHA CONSTRUCTIONS CO.
  • مصر - الغردقة
  • يناير 2008 إلى مايو 2008

NUBYA RESOURT
responsible for shop drawings, monthly Payment, Progress
Report, and execution of all site works

Site Engineer في Dar Almeamar
  • مصر - القاهرة
  • ديسمبر 2006 إلى ديسمبر 2007

Mountain View (2) project
Responsible for preparing shop drawings, monthly Payment, Progress Report, and execution of all site works

Site Engineer في United Company for constructions
  • مصر - القاهرة
  • ديسمبر 2004 إلى أكتوبر 2006

Al‐Lotus Project
The Job was to execute Sewerage network including pipe lines and manholes.
After this testing network and handing over to consultant/client

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Helwan Univesity
  • سبتمبر 2004

Specialties & Skills

Marketing
Preparation
Autocad
Microsoft office package

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

Engineering Syndicate
  • Civil Engineer
  • August 2004