EXPERIENCE:-
Employer :- (MASCO) Muhammad Ali Al Suwailam Company in (Saudi Arabia).
Duration:- Nov, 2010 - To Till Date
Working as a team member of Engineering Department, Design Section In Jeddah City on:
Projects :-
(HHR PROJECT) Haramain High Speed Railway Project 450 Km worth $ 3.75 billions.
(KASC) King Abdullah Sport City Project In Jeddah.
Makkah. Jeddah Expresswy M.O.T Project 30KM.
Rayadah Housing Complex (Infrastructure Project In Jeddah).
Al-Dawadmi Housing Socity (Infrastructure Project In Jeddah).
(as a Senior Auto Cad Civil, Infrastructure Draftsman and Quantity Surveyor) on their different kinds of project including Rail Design, Road Design, Sewage Work, Irrigation Work, Potable Work, Utilities Work, Manhole Details, Chamber Details, Structure Work, Electric Work and Building Work.
Making Centerline Plan, Profile, X-Sections & Calculation of Quantity.
• Prepair Shop Drawing of Manholes, Chambers, Sewage Lines, Irrigation System, Potable Work, and Utilities Work.
• Prepair Shop Drawing of Cross Bridges Center Line, Profile And Cross Sections with Quantity.
• Prepair Shop Drwing of Camel Crossing with Embankment Quantity.
• Prepair Shop Drawing of R.C Slope Protection Around Abutments for Hajj Interchange and Cross Bridges with Settingout Data.
• Prepair Shop Drawing of R.C Slope Protection Around Abutments for Air Defance Interchange and Settingout Data.
• Prepair Shop Drawing of R.C Slope Protection Around Abutments for Cross Bridges, Rail Bridges, Wadi Bridges, Camel Crossings and Settingout Data.
• Prepair Shop Drawing of Diversion Dikes Center Line, Profile and Cross Sections with Settingout Data and Quantity.
• Calculation Quantity of Spur Dikes.
• Prepair Shop Drawing of Drainage, Ditches, Profile, Cross Sections and Settingout Plan.
• Grouted Riprap Slope Protection Profile and Calculation Qunatity of Riprap And Stub.
• Concrete Riprap Slope Protection Profile and Calculation Quantity Of Riprap.
• Prepair Shop Drawing of Concrete Chutes.
• Prepair Shop Drawing of Soil Replacement with Classification Material.
• Prepair Shop Drawing of Cat eyes And Cyramics.
• Prepair Shope Drawing of Backfilling & Drainage System Details and R.C Slope Protection Around Abutments for Rail Bridges, Cross Roads and Camel Crossings.
• Prepair Shop Drawing of Stream Diversions and Rienforcement Concrete Channels.
• Prepair Shop Drawing of Retaining walls Settingout Plan Section and Elevation.
• Prepair Shop Drawing of Box Culvert Arrangment and Reinforcement.
• Prepair Shop Drawing of Box Culvert Elevation, Wingwall and Settingout Data.
• Prepair Shop Drawing of Step Chute Settingout Plan, X-Section and Elevation.
• Calculation of Monthly Bill for Railway Embankment and Excavation.
• Calculation of Monthly Bill for Roadway Embankment and Excavation.
• Calculation of the Cavity Probing holes and Grouting.
• Estimation Quantity of Earthwork.
• Prepair As-Built Drawings of Each Item and Finalize Quanties.
- Company industry:
- Construction & Building
- Job role:
-
Civil Engineering