QA QC Engineer Mechanical
Inma Steel Fabricators Co. Ltd Saudi Arabia
مجموع سنوات الخبرة :8 years, 10 أشهر
• Attending weekly Project Co Ordination meetings & other PMT/Engg. meetings as required.
• Communicate with client technical team ensure comments and waivers have been discussed and closed.
• Capabilities to handle individual projects, handle many Aramco & Sabic, Sadara projects.
• Preparing the ITP & weld map for projects (Preparation of ITP for Sabic & Aramco Projects)
• Preparation of Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Qualification Record (WPQ).
• Reviewing the MTCs Quality check on the material and installation as per the quality specification and codes.
• Prepare all inspection reports for the individual activities inspected as per the requirement.
• Monitoring and inspecting the prefabrication works by the construction, including the inspection of incoming materials, material handling, heat number transfer, Fit-up inspection prior to release for welding.
• Verify that all PMI of material has been performed as per specification. Witness final pressure tests, including hydro test and pneumatic test. Witnessing Visual inspection of Weldments.
• Inspection of Heat treatment such as Preheating, Post Weld Heat Treatment, De Hydration as per Standard.
• Monitoring of activities like electrode baking, Voltage, Current, Inter pass temperature, Preheating.
• Preparation of inspection reports.
• Initial inspection of the location for affected areas of Shell during initial visual inspection
• Fit up & weld Nozzle Pipe to Flange and Nozzle to insert plate.
• Perform weld visual examination and PT.
• R.F. Pad leak test.
• Visual & Final Dimensional Inspection of Repair area with client & AI.
• Hydro test as required as per the approved hydro test procedure.
• Preparation of "Report of Repair" (Form R1).
• Verification and installation of NBIC "R" nameplate.
• Inspection of Heat treatment such as Preheating, Post Weld Heat Treatment, De Hydration as per Standard.
• Review of document such as Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Qualification Record.
• Monitoring of activities like electrode baking, Voltage, Current, Inter pass temperature, Preheating.
• Review of calibration reports.
• Stage-wise & final inspection of the job as per Inspection and Test Plan, Code & Specification.
Preparation of inspection reports. Fit up and weld visual inspection.
• Incoming material inspection as per ASME codes and Client specifications.
• Monitoring and inspecting the prefabrication works by the construction, including the inspection of incoming materials, material handling, Fit-up inspection prior to release for welding, weld visual etc.
• Preparing the ITP & weld map for projects (Preparation of ITP for Sabic & Armaco Projects)
• Preparation of Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Qualification Record (WPQ).
• Capabilities to handle individual projects, handle many Aramco & Sabic, Sadara projects.
• Reviewing the MTCs Quality check on the material and installation as per the quality specification and codes
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.