Executive civil engineer
Sahara Prime City Limited
Total years of experience :12 years, 3 Months
Planning Engineering, Quantity surveying, Estimating and costing, billing, bill of quantity, Rate Analyisis, Tendering, MIS, Auto Cadd2007, Reprots and presentattion, site Execution
National Thermal Power Corporation (NTPC), Unchahar
Duration: June-July 2012
Scope: Observation of the Civil Maitenance Depertment, Construction of 2-BHK apartments along with road, sewerage disposal & its treatment methodology.
Project in B.TECH FINAL YEAR
• Sewage Disposal
Personal Dossier
Address: 374/5, Sarvodaya Nagar, Post:-Doorbhash Nagar, Raebareli, U.P.
• Post Graduation: I Year : August 2014- May 2015 1) TVC survey & Calculation of Volume Characteristics. 2) Bus Terminal & Railway Terminal survey. 3) Socio Economic Survey Block- A of SVNIT Campus. 4) Housing Society Planning & Development(Autocadd). 5) Neighbourhood Designing, Planning & Cost Estimantion for Jahangirpura, Surat. 6) Urban Renewal for Athwa Gate to Makai Pool, Surat area : Provision of Parking(Auto Cadd) 7) Town Planning Scheme Analysis of Existing TP Scheme & redisigning new TP Scheme for ADAJAN 31 TP as per the Gujarat Town Planning Act (Auto Cadd) 8) Infrastructure Planning for Navsari City : Water Supply System survey, Analysis & Proposal Report. II Year : August 2015 – August 2016 1) CDP Study of Lucknow City 2) Preparation of Development Plan for Agra(Tourism Driven City ) & Mathura (Pilgrimage City)….Ongoing. 3) Seminar Report: GIS Mapping of cities for Fire Safety & Emergency response System…..Ongoing • Dissertation Title: Development of Underground Utility Complexity Index (UUCI) using Analytic Hierarchy Process(AHP) Brief Aim of the study is to develop UUCI for the complexity analysis of the underground utility(gas, elctricity, sewerage, water, OFCs etc.) related works. This index would help in the pre-evaluation of the onsite conditions and computation of time and cost more precisely.Thereby it helps in reducing the problems faced during major infrastructure projects which get delayed because of utility shifting,laying or maintainance chaos.
Civil Engineering with Third Rank in the University of Uttar Pradesh Technical University and A total percentage of 84.58 with honourary qualification and I was absorbed in the job Before the completion of my Graduation