Site Manager QC -KAFD MONORAIL
saudioger
مجموع سنوات الخبرة :21 years, 9 أشهر
• Ensure the QC procedures are implemented on site.
• Coordinate with Site Management on work progress and deficiencies.
• Supervises testing and Commissioning of all related equipment’s
• Follow up pending remarks and reminding the site management for necessary action against outstanding issues.
• Verify the Subcontractors’ compliance with the requirements such as materials, workmanship, and functional performance.
• Coordinates with Consultant for the approval of methods and practices required on site.
• Resolves major issues
Saudi Oger- Electronic-Electrical LC-Coordinator MOE-Project
-Managing and Coordination with Subcontractors
-Coordinate with Consultants
-Follow up Site Activities
-Organizing inspection of site work
-Material submittal preparing and following Material Delivery
-Reviewing subcontractors Shop Drawings.
-Coordinating with procurement Department and reply for their different quires
-Coordinate with Different Discipline Architectural., Structural, Mechanical plans and site activities.
-Present Electrical Department in Site Meetings.
Telecom Engineer/coordinator- management Novia Com Saudi Arabia Company Industry: Telecommunications Job Role/Department: Coordinator- Engineer, 1-Project Name is STC of Ericsson KSA
-Manage, planning and coordinate site activities -Commissioning integration WCDMA and GSM (RBS 3206 and RBS 2206 Ericsson equipment) -Sharing of WCDMA and CDMA -Installation of WCDMA, GSM and CDMA - Documentation -Testing transmission -Supervising the installation and testing of the ff equipment:
- Eltek and Emerson Rectifier PDH, SDH, traffic node and high capacity mini link 2-MTC-Nokia project, installation, configuration, integration, Flexi edge, hop manager.2G, 3G TMR(Two years working exp. for ZAIN )
-Manage, schedule and organize the work of the team in the field
-Attend site acceptance -Knowledge in troubleshooting and testing of VSWR, Distance-to-fault of cellular antenna and feeder system -Responsible for the BER test of the transmission -Responsible for the termination and stimulation of alarm
-PAT
3-Huawei 3G Coordinating and managing the installation and commissioning, Node B equipment
4-Andrew LBS UTDOA
5-NSN, Mobily (L+3) phase 4(NSN equipment)
6- STC End to End, IP ran project
Supervising the installation of the antenna system and testing the RSL
Responsible for leading a team of Engineers which were undertaking the installation of optic fiber cable between local
telephone exchanges for the upgrade of networks.
Recognized and registered in Lebanon
Registered and recognized in Melbourne-Victoria-Australia