Service team lead
SIG Combibloc Obeikan
Total years of experience :15 years, 6 Months
Responsible for filling lines efficiency, troubleshooting any malfunction, Leading preventive
maintenance, manage spare parts consumption and stock
Insuring filling lines are achieving target efficiency and send daily performance report
Leading of field service Engineers on site for their task assignment and providing necessary
coaching and training
Troubleshooting any machine malfunction, take necessary corrective actions and send technical
incident report with root cause analysis
Creating inspection lists, order spare parts and lead preventive maintenance activities
Follow up spare parts stock and order necessary parts according to budget and site priority
Holding daily meeting with customer to plan activities and support customer team in technical
issues
Acting as site safety supervisor and responsible for site safety action plan
Leading both electrical and mechanical maintenance operations through the shift to maintain
engineering KPIs targets
Leading predictive and preventive maintenance tasks and provide support and coordination with
production dept.
Carrying out machine error diagnosis according to the machine’s O&M manuals
Implementing World Class Manufacturing projects
Preparing daily, monthly and major incidents reports and discussing it with management with
proposals for efficient solutions or improvements.
Leading electrical shift team in coordination with area owners, instrumentation and automation teams
to Implement planned maintenance activities and troubleshoot any machine error
Fixing any detected equipment malfunction by repairing or replacing it and making necessary
hardware or software modifications
Analysis of repetitive equipment failures and providing efficient solutions
Working in collaboration with area teams during overhauls and shutdowns
Supervising the electrical installations then commissioning of El-Sewedy Cement Factory (El-Sukhna plant) with FLS specialists and ASA team
• Contributed in electrical installations of power and instrumentation factory equipment and cable routing.
• Testing and commissioning of each installed equipment one by one
Testing, commenting about the results of electrical, mechanical, D.G.A. tests and repairing power transformers.
• Worked in Samalout 500kV substation in El-Menya city in transformers condition assessment with specialists of Z.T.Z. Company (Ukraine)
• Worked in High Dam power plant in transformer fault determination with specialists of Z.T.Z. Company (Ukraine)
• Worked in transformer fault determination in EgyptAlum (Big Egyptian Co. for aluminium industries) with Z.T.Z. Company specialists;
• Worked with different oil testing devices (Dissolved Gas Analysis, water content and breakdown voltage) and analysis of the results.
Common Maintenance Strategy Maintenance Policies and control (KPIs) Shutdown Project Planning using Primavera Total Productive Maintenance (TPM) Reliability Centred Maintenance (RCM) Criticality Analysis (Risk Based) Root Cause Failure Analysis (RCFA) and Failure Mode Effect Analysis (FMEA)
B.Sc. in Engineering, Electrical power and Machines Dept.