project manager
OSMAN GROUP
Total years of experience :27 years, 2 Months
☒ FROM 01/05/2010 TILL Now: -
working as a project manager for the specialized contracting & industries co. (OSMAN GROUP)
PROJECT: Tabiat Elabd drainage pumping station - rasheed
OWNER: Mechanical & Electrical dept. -
Ministry of public works & water resources
ENGINEER: faculty of engineering - cairo university
COST: 50millions L.E.
☒ FROM 01/09/2009 to 30/04/2010: -
working as a project manager for the specialized contracting & industries co. (OSMAN GROUP)
PROJECT: lift pump stations of Abbes villages (7th & 8TH) - alexandria
(5 LIFT PUMP STATIONS)
OWNER: the construction authority of potable water and waste water.
ENGINEER: Egyptian Group for Engineering Consultation (EGEC)
COST: 46 millions L.E.
☒ FROM 01/12/2007 to 31/08/2009: -
working as a project manager for the specialized contracting & industries co. (OSMAN GROUP)
PROJECT: sanitary drainage and lift pump station of Elnaseria 4TH VILLAGE - ALEXANDRIA.
OWNER: the construction authority of potable water and waste water.
ENGINEER: Egyptian Group for Engineering Consultation ( EGEC)
COST: 18 millions L.E.
☒ FROM 01/02/2007 to 30/11/2007: -
working as a Construction manager for the specialized contracting & industries co. (OSMAN GROUP)
PROJECT: sanitary drainage and lift pump stations of Abbes villages (7th & 8th) - alexandria
OWNER: the construction authority of potable water and waste water.
ENGINEER: egyption group for engineering consultation (EGEC) during this period i had supervised the execution of sewage pipelines (UPVC) of varies diameter for 4/8 village & 3/8 village
COST: 46 millions L.E.
☒ FROM 14/02/2005 to 31/01/2007: -
working as a Construction manager for the specialized contracting & industries co. (OSMAN GROUP)
PROJECT: salvation of karnak & luxor temples from underground water. the swedish international development agency in association with USAID grant no. 174-263
OWNER: supreme council of antiquities in association with national organization for potable water and sanitation drainage (SCA/NOPWASD)
ENGINEER: SWECO - international sweden in association with A&A consulting
COST: 10 millions US$
During this period i had supervised the execution of the following: - THE EXECUTION OF TWO LIFT PUMP STATIONS
- THE EXECUTION OF THE UNDERGROUND WATER COLLECTING SYSTEMS WITH LENGTH ABOUT 5.500 KM AROUND KARNAK TEMPLE & 2.500 KM AROUND LUXOR TEMPLE BY THE USE OF CONCRETE AND HDPE PIPES WITH 400: 800 MM DIAMETER
- THE EXECUTION OF THE TWO FORCE MAIN LINES BY THE USE OF HDPE PIPES WITH 400MM & 700MM DIAMETER
☒ FROM 01/02/2004 TO 13/02/ 2005: -
Working as Executive Engineer for J.V. Sorenson Gross & The Specialized contracting and industries co.
PROJECT: Corrosion control facility
Cairo west air base - Egypt
OWNER: The egyption military forces - Cairo west air base
ENGINEER: U.S. ARMY CORPS OF ENGINEERS.
PROJECT SUMMRY: THE DESIGN AND CONSTRUCTION OF A CORROSION CONTROL FACILITY AND ASSOCIATED SITE WORK AND UTILITIES. A NEW FACILITY WILL BE COMPLETED TO ACCOMMODATE THE ACTIVITIES IN SUPPORT OF THE PAINTING, STRIPPING AND CLEANING OF VARIOUS AIRCRAFT FOR THE EGYPTION AIR FORCE
THE SCOPE INVOLVES COMPLETE CONSTRUCTION OF THE INDUSTRIAL WASTE TREATEMENT SYSTEM, OFFICE BUILDING, SITE WORK, LAGOONS, APPROPRIATE TANKS, PUMPS AND PIPING
THE PROJECT REVISED VALUE $7, 722, 611.650
During this period i had supervised the execution of the finishing works
☒ FROM 01/07/2001 to 31/01/ 2004: -
WORKING AS EXECUTVE ENGINEER FOR THE SPECIALIZED CONTRACTING & INDUSTRIES CO. ( OSMAN GROUP)
PROJECT: sanitary drainage - status naser - beni suef
OWNER: National association for potable water and sanitary drainage
ENGINEER: National association for potable water and sanitary drainage
COST: 42 millions L.E
DURING THIS PERIOD I HAD SUPERVISED THE FOLLOWING: - THE EXECUTION OF THE MAIN & TWO SECONDARY PUMP STATIONS AND THEIR SUPPLEMENT BUILDINGS
- THE EXECUTION OF FORCE MAIN ( PRESSURE LINE FROM MAIN P.S. TO SEWAGE TREATMENT PLANTS) BY THE USE OF CONCRETE PIPES WITH 700 MM DIAMETER
☒ FROM 01/09/1999 to 30/06/ 2001: -
WORKING AS EXECUTVE ENGINEER FOR THE SPECIALIZED CONTRACTING & INDUSTRIES CO. ( OSMAN GROUP) -
PROJECT: dream land villa& apartment- 6th city
OWNER: dream land - Dr. Ahmed Bahgat & Co.
ENGINEER: EGYDAN - member of Ahmed Bahgat group.
COST: 17 millions L.E
DURING THIS PERIOD, I HAH SUPERVISED THE EXECUTION OF CONCRETE STRUCTURE AND WET FINISHING WORKS FOR 4 APARTMENT BUILDINGS
☒ FROM 07/04/1997 to 31/08/1999: -
WORKING AS EXECUTIVE ENGINEER FOR THE ARAB CONTRACTORS CO. ( OSMAN AHMED OSMAN & CO.)
PROJECT: wadi alnatroon prisons - sadat city
OWNER: Prisons Dept.
ENGINEER: The arab bureau for designs & engineering consultant
COST: 53 millions L.E
DURING THIS PERIOD, I HAD SUPERVISED THE EXECUTION OF RESIDENTIAL BUILDINGS, PUBLIC BUILDINGS, SEWAGE AND SMALL LIFT STATIONS
التقدير العام : جيد تقدير مشروع التخرج : جيد جداً