Shift leader
GLOBAL GAS SERVICES LLC OMAN
Total years of experience :16 years, 0 Months
worked as shift leader of ASU and CO2 plant.
additional charge as site supervisor of ASU erection .
responsible for receiving the material from suppliers.
study the GAD, LAY OUT, and ISOMETRIC drawing .
finding the sequence of piping and their isometric drawing.
Giving the instructions to fabricator about piping directions and their instruments installation.
coordinate to the GM and inform the daily basis progress report.
Worked as senior shift Engineer in air separation plant.
responsible for safe operation of plant .
bring the production and maintain their purities.
Handling the emergency in case of power jerking.
prepare the production report on daily, weekly and monthly basis.
maintain the record of tanker dispatches to customer.
workek in GASAL QSC Qatar through SPIE OIL AND GAS Services.
IN gasal worked in ASU air separation plant operator
plant capacity 770 TPD.
familer to prepare PTW .
ASU plant operation field and through DCS.
worked as shift operator ASU.
Responsible for safe and smooth operation of ASU .
Plant startup and shutdown.
bring the production and maintain their purities.
communication with sales department.
prepare the maintenance work Schedule.
worked in Pakistan atomic energy commission as a sub engineer in utility and service department.
I worked on Boiler bebcock D package type boiler, 22 ton capacity and 16 bar pressure.
5000 thousand ton capacity York absorption system chiller.
reciprocating compressor lille France.