Total Years of Experience: 13 Years, 3 Months
July 2016
To Present
Bms Operator
at IDARA MADEENA ASKARIYA
Location :
Saudi Arabia - Tabouk
Maintenance and operation hvac System.
January 2013
To Present
Building Management System Operator cum Engineering Coordinator
at Al Asmakh Facility Managemnet
Location :
Qatar - Doha
Maintenance & Servicing of Window & Split Air - Conditioner.
Handling, Maintenance & Servicing of Chiller Plant, Three Phases Air - Conditioner, Package Unit, Air Handling Unit, VFD and Fan Coil Unit (FCU) & Drain Pump.
Handling of BMS, HVAC System of Johnson Control & Solus Access Control System of Logion, Dats, Zicom, Euronet & Tracer Summit CCView CYLON System.
Handling of Fire Fighting System, FM- 200 System, Vesda System, Water Leak Detection, Audio - Video Conference System & Close Circuit Television System ( CCTV ).
Making and Designing of Employ Access Card Stickers.
Handling the DG Generator Set 500KVA(Make FG Wilson)
Co Operation with All Staff.
Handling, Maintenance & Servicing of Chiller Plant, Three Phases Air - Conditioner, Package Unit, Air Handling Unit, VFD and Fan Coil Unit (FCU) & Drain Pump.
Handling of BMS, HVAC System of Johnson Control & Solus Access Control System of Logion, Dats, Zicom, Euronet & Tracer Summit CCView CYLON System.
Handling of Fire Fighting System, FM- 200 System, Vesda System, Water Leak Detection, Audio - Video Conference System & Close Circuit Television System ( CCTV ).
Making and Designing of Employ Access Card Stickers.
Handling the DG Generator Set 500KVA(Make FG Wilson)
Co Operation with All Staff.
July 2010
To July 2012
BMS OPERATOR
at MAF DALKIA
Location :
Saudi Arabia - Jeddah
BMS operator,
handling HVAC Sytem.chiller, AHU, fcu, fire alarm system, vesda, FM-200.water leak detection.
handling HVAC Sytem.chiller, AHU, fcu, fire alarm system, vesda, FM-200.water leak detection.
Share on Facebook
Share on Twitter
Share Via Email