Total Years of Experience: 22 Years, 5 Months
August 2012
To Present
RE and stockholder manager
at Mouchel Consultant
Location :
United Arab Emirates - Abu Dhabi
Participate in Design Development providing the necessary liaison, when required, between preconstruction department and the owner.
Client: DOT
Contractor Al Jaber, Ghantoot, and Al Kharafi
Client: DOT
Contractor Al Jaber, Ghantoot, and Al Kharafi
March 2010
To October 2012
Project manager
at HILALCO & GHANTOOT
Location :
United Arab Emirates - Abu Dhabi
Location: Abu Dhabi Western Region (Sir Bani Yas Island, Jabel Al Dhana/Al Mugharaq port and Liwa city).
Achievements:
Construction of high quality port at Jabel Al Dhana which serving vessels coming mainly from Delma & Sir Bani Yas islands and monitor/control construction through administrative direction and ensure project is built on schedule and within budget. Coordinate the preparation of the schedule and long term planning.
Also the works includes execution of impressive road works in liwa comprising embankment, backfilling, villas accesses & maintenance.
Achievements:
Construction of high quality port at Jabel Al Dhana which serving vessels coming mainly from Delma & Sir Bani Yas islands and monitor/control construction through administrative direction and ensure project is built on schedule and within budget. Coordinate the preparation of the schedule and long term planning.
Also the works includes execution of impressive road works in liwa comprising embankment, backfilling, villas accesses & maintenance.
September 2009
To March 2010
project manager
at Sir Bani Yas Island, Jabel Al Dhana/Al Mugharaq port and Liwa city
Location :
United Arab Emirates
Lead PMC staff in controlling and responsible for the follow-up and implementation of all the project aspects for the following works:
Design and supervision of, Two story office building inside Sir Bani Yas Island, extension of Municipality Office building in Liwa city, Maintenance of Municipality Office building & Etisalat building in Madinat Zhaid, Extension & rehabilitation of the
arrival and departure buildings for Sir Bani Yas island accompanied with hard and soft landscaping &
Design and supervision of, Two story office building inside Sir Bani Yas Island, extension of Municipality Office building in Liwa city, Maintenance of Municipality Office building & Etisalat building in Madinat Zhaid, Extension & rehabilitation of the
arrival and departure buildings for Sir Bani Yas island accompanied with hard and soft landscaping &
January 2009
To January 2010
Project manager
at MACADM
Location :
United Arab Emirates - Abu Dhabi
Achievement: Design and Execution of villas at Silaa city and rehabilitation of 2km rock revetment breakwater.
November 2008
To September 2009
RE & Senior structural Edngineer
at Hyder Consultant
Location :
United Arab Emirates - Abu Dhabi
Design and Execution of villas at Silaa city and rehabilitation of 2km rock revetment breakwaterRE & Senior Structural Eng.
for two Bridges at Al Reem Island, ABU-DABI
Contractor: NPC
Achievements: Supervision of two bridges crossing marine canal associated with infrastructure, road works & landscaping.
• Manage financial aspects of contracts to protect client and company interests: review and approve budgets, cost reports, PMC’s reports, fee payment, rental equipment, income, expenses, etc. Perform the final review of internal items such as Cost Analysis Worksheets, Monthly Billing, Master Cost Breakdown, General Conditions Estimate, Labour Cost Report, and Monthly Reports.
.
for two Bridges at Al Reem Island, ABU-DABI
Contractor: NPC
Achievements: Supervision of two bridges crossing marine canal associated with infrastructure, road works & landscaping.
• Manage financial aspects of contracts to protect client and company interests: review and approve budgets, cost reports, PMC’s reports, fee payment, rental equipment, income, expenses, etc. Perform the final review of internal items such as Cost Analysis Worksheets, Monthly Billing, Master Cost Breakdown, General Conditions Estimate, Labour Cost Report, and Monthly Reports.
.
June 2006
To November 2008
RE
at Hyder Consultant
Location :
United Arab Emirates - Abu Dhabi
Supervision of mix of structures comprising reinforced concrete and steel structure buildings for administration and recreation buildings as well under ground reinforced concrete water tanks for potable water and others for Diesel fuel tanks in addition to Fire fighting tank above the ground.
Also supervision of Industrial buildings such as Sand blasting building, Generator building and substation buildings, refurbishment and extension of 20 meter height steel structure control tower, accompanied with all infrastructure works such as asphalt roads, helipad, up lift pumping stations, potable water network.
The scope also includes 500 meter sheet piles port used as services harbour at Ruwais Industrial Area including onshore piles for 100 ton bollard for mooring the tug boats and offshore piles for 200 ton mooring dolphin, retaining walls and storm water drainage.
Also supervision of Industrial buildings such as Sand blasting building, Generator building and substation buildings, refurbishment and extension of 20 meter height steel structure control tower, accompanied with all infrastructure works such as asphalt roads, helipad, up lift pumping stations, potable water network.
The scope also includes 500 meter sheet piles port used as services harbour at Ruwais Industrial Area including onshore piles for 100 ton bollard for mooring the tug boats and offshore piles for 200 ton mooring dolphin, retaining walls and storm water drainage.
June 1983
To August 1987
Resident Engineer
at Ministry of Buildings & Housing/ Al Mansour Company
Iraq.
I undertook design and construction supervision of a number of projects. Some of these projects are as follows:
Design and site supervision for numerous 12+G residential and commercial Buildings.
Also Six industrial warehouses: I designed all structural elements of 6 warehouses. These were one story 18m x 40m R.C. portal frame structures and covered with post-tensioning pre-cast double T beams. I undertook supervisory role during the construction of these industrial buildings.
University of Technology / Building and Construction Engineering Dept., Baghdad, Iraq.
Research Student undertaking a research program for the degree of Doctorate.
Analytical and design experience during the doctoral study includes development of short span Ferro cement dome to long span Ferro cement roof implies all the three dimensional geometrical analysis including iteration P-delta and bowing action as well as material analysis thru incorporation of Modulus of elasticity changes Which are significant for high rise buildings. In addition to full design courses and teaching the under graduate students.
I undertook design and construction supervision of a number of projects. Some of these projects are as follows:
Design and site supervision for numerous 12+G residential and commercial Buildings.
Also Six industrial warehouses: I designed all structural elements of 6 warehouses. These were one story 18m x 40m R.C. portal frame structures and covered with post-tensioning pre-cast double T beams. I undertook supervisory role during the construction of these industrial buildings.
University of Technology / Building and Construction Engineering Dept., Baghdad, Iraq.
Research Student undertaking a research program for the degree of Doctorate.
Analytical and design experience during the doctoral study includes development of short span Ferro cement dome to long span Ferro cement roof implies all the three dimensional geometrical analysis including iteration P-delta and bowing action as well as material analysis thru incorporation of Modulus of elasticity changes Which are significant for high rise buildings. In addition to full design courses and teaching the under graduate students.
January 1983
To January 1987
Senior Structural
at Al Idreeci Centre Consulting Company University of Technology
Location :
Iraq
Structural Engineer
Senior Structural Engineer
at Hyder Consulting (M.E.) for ADNOC Projec
Contractor : Target
I have undertaken the role of designs review thru utilize of ETABS design software and structural supervision for M/S ADNOC for a project consists of mix of structures comprising reinforced concrete and steel structure buildings for administration and recreation buildings as well under ground reinforced concrete water tanks for potable water and other for Diesel fuel tanks in addition to Fire fighting tank above the ground.
Also design and supervision of Industrial buildings such as Sand blasting building, Generator building and substation buildings, refurbishment and extension of 20 meter height steel structure control tower, accompanied with all infrastructure works such as asphalt roads, helipad, pre-cast and cast in-site deep manholes with up lift pumping stations, potable water network, road crossing concrete ducts for all services ( potable water system, sewage lines, fibre optic cables ) .
The scope of work also included marine works including pre-cast units for capping beams with sheet piles used as services harbour at Ruwais Industrial Area including onshore piles for 100 ton bollard for mooring the tug boats and offshore piles for 200 ton mooring dolphin, retaining walls and storm water drainage.
I have undertaken the role of designs review thru utilize of ETABS design software and structural supervision for M/S ADNOC for a project consists of mix of structures comprising reinforced concrete and steel structure buildings for administration and recreation buildings as well under ground reinforced concrete water tanks for potable water and other for Diesel fuel tanks in addition to Fire fighting tank above the ground.
Also design and supervision of Industrial buildings such as Sand blasting building, Generator building and substation buildings, refurbishment and extension of 20 meter height steel structure control tower, accompanied with all infrastructure works such as asphalt roads, helipad, pre-cast and cast in-site deep manholes with up lift pumping stations, potable water network, road crossing concrete ducts for all services ( potable water system, sewage lines, fibre optic cables ) .
The scope of work also included marine works including pre-cast units for capping beams with sheet piles used as services harbour at Ruwais Industrial Area including onshore piles for 100 ton bollard for mooring the tug boats and offshore piles for 200 ton mooring dolphin, retaining walls and storm water drainage.
Senior Structural Engineer
at Al Idreeci Centre Consulting M.E Company
Iraq.
Design and site supervision for numerous residential & commercial multi-story buildings and industries buildings, some were including post-tensioning pre-cast slabs. Example of these projects is two buildings of 5 - stories steel structure complies steel I - sections for columns, beams and composite construction of concrete and corrugated steel deck for slabs.
Execution of cars parking and hard & soft landscaping with all associated industries buildings.
University of Technology / Building and Construction Engineering Dept., Baghdad, Iraq.
Undertaking a taught and research program for the degree of Master.
Analytical experience during the master study includes development of interaction bond of corrugated sheets with concrete slabs normally used for buildings and bridges.
Civil Defence, Structural Engineer
Structural design and supervision engineer for construction and rehabilitation of several Multi-storey buildings and infrastructure.
Other Experience
Academic and research experience in Structural and Civil Engineering
I worked for the Civil Defence Department as site ENGINEER for construction of shelters. These underground buildings had 1.65m thick R.C. walls and 2m thick slabs reinforced with layers of reinforcement #20 every 0.3m taking all requirements to reduce temperature. I also undertook three months training at Haditha dam and gained a substantial experience in water cement injection in earth to reduce permeability and reinforcement soil filling.
Design and site supervision for numerous residential & commercial multi-story buildings and industries buildings, some were including post-tensioning pre-cast slabs. Example of these projects is two buildings of 5 - stories steel structure complies steel I - sections for columns, beams and composite construction of concrete and corrugated steel deck for slabs.
Execution of cars parking and hard & soft landscaping with all associated industries buildings.
University of Technology / Building and Construction Engineering Dept., Baghdad, Iraq.
Undertaking a taught and research program for the degree of Master.
Analytical experience during the master study includes development of interaction bond of corrugated sheets with concrete slabs normally used for buildings and bridges.
Civil Defence, Structural Engineer
Structural design and supervision engineer for construction and rehabilitation of several Multi-storey buildings and infrastructure.
Other Experience
Academic and research experience in Structural and Civil Engineering
I worked for the Civil Defence Department as site ENGINEER for construction of shelters. These underground buildings had 1.65m thick R.C. walls and 2m thick slabs reinforced with layers of reinforcement #20 every 0.3m taking all requirements to reduce temperature. I also undertook three months training at Haditha dam and gained a substantial experience in water cement injection in earth to reduce permeability and reinforcement soil filling.
Share on Facebook