startup area manager
Oil Industries’ Commissioning and Operation Company (OICO)
Total years of experience :24 years, 10 Months
Main activities
1. Commissioning:
- Preliminary checks
- Commissioning activities: leaks test, chemical cleaning, Degreasing, drying, Function test, rotation check and Box up
- Pre startup activities: chemical and catalysts loading, Operation test, water circulation
2. Startup:
- Preparation of units: pressurizing, complex loop check,
-Startup sequentially
Main activities
1. Pre commissioning: equipment/piping cleaning, flushing, Hydro test, Instrument loop check, Electrical check
2. Commissioning:
- Preliminary checks
- Commissioning activities: leaks test, chemical cleaning, Degreasing, drying, Function test, rotation check and Box up
- Pre startup activities: chemical and catalysts loading, Operation test, water circulation
This project was constructed bitumen blowing air unit from Vacuum Bottom and Vacuum Slops from Abadan
Refinery as Feed.
Manage the Construction and erection of Piping, Instruments; Equipment’s & power devices of new bitumen production plant. The plant capacity was 15000 BPD.
. • Engineering & Procurement & Construction of 29 Storage tanks (weight: 23000 ton).
• Manage and monitor the various phases of the project within the time specified by the employer based on the Company strategy
• Design the Cash flow, Cost control, Following the Invoices.
• Ensures that all work is carried out in accordance with project specification /procedure / method statements and schedule.
• Coordinated with Commercial and Engineering Departments
Monitoring, expedition and coordination all activities in accordance to project master schedule.
Checking and reporting any nonconformity, deviation of standards and specifications and/or the scope of works resulted from CONTRACTOR act which may have effect on the quality and/or cost and/or schedule of the works. In such a case we shall take the remedial and/or corrective actions.
Coordination with inspection agency and ensured all fabrication and welding work followed the relevant procedure/specifications, and all materials used were strictly in accordance with approved specifications.
Reviewing all Documents and drawings; make the shop drawings &Material takes off.
Checking and reporting any nonconformity, deviation of standards and specifications. In such a case we shall take the remedial and/or corrective actions.
Site execution and team leading, Coordination of works, Fabrication and erection of Both Fix and floating roof tanks.
Managing a large number of personnel.