Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

siddique ur Rehman

Assistant Electrical Engineer

Kashif Aslam & Associates Pvt. Limited

Location:
Pakistan
Education:
Bachelor's degree, BACHELORS SCIENCE IN ELECTRICAL TECHNOLOGY
Experience:
14 years, 7 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  14 Years, 7 Months   

September 2015 To Present

Assistant Electrical Engineer

at Kashif Aslam & Associates Pvt. Limited
Location : Pakistan - Lahore
1. Electrical Designing
2. Preparation of Bill of Quantities(BOQ) & Consultant Estimates
3. Supervision/Consultancy of Designed Projects
4. Verification of Bills
5. Submittal Technical Review
August 2009 To Present

DESIGN ENGINEERS

at INTERNATIONAL ENGINEERS
Location : Pakistan - Lahore
1. . Electrical Designing

Designing of following electrical works by marking on architectural plans given by architect.
a. Lighting Fixture Layout
b. Power Socket Layout
c. Air Conditioner wiring
d. Telecommunication Layout
e. Networking Layout
f. Fire Alarm Layout
g. Public Address Layout
h. Security System Layout
i. UPS System Layout
j. Earthing and Lightening protection system Layout
k. Power Distribution system Layout
l. LT-Switch Board, Power Distribution Board, Sub Main switch board, Motor control panel, Main panel board, Distribution boards, sub main boards, metering panel.
m. Preparation of Load statements of whole building/project keeping in view the individual load of electrical items installed in it. This practice is used to calculate the required size of Transformers, Generator and UPS.
2. Preparation of Bill of Quantities(BOQ) & Consultant Estimates

It’s the second step in the designing phase that I carried out there. Bill of Quantities includes the description of items marked in the drawings and prepared keeping in view the designed project.
After preparation of BOQ, Consultant/Engineering estimate is made based on market prices and rate analysis of BOQ items according to the requirements of client.

3. Supervision/Consultancy of Designed Projects

After the allotment of Tender to the contractor, I checked/supervised the whole process of electrification works on regular basis according to the designed criteria (Drawings & BOQ/Specs).

4. Verification of Bills

I used to verify Contractor’s submitted bill in light of designed requirements after carrying out thorough site survey. The verified bill is used for release of payment to the contractor by the client.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
February 2015

Bachelor's degree, BACHELORS SCIENCE IN ELECTRICAL TECHNOLOGY

at UNIVERSITY OF LAHORE,LAHORE
Location : Pakistan - Lahore
Grade: 2.83 out of 4

Specialties & Skills

Electrical Design

Estimating

Site Supervision

Quantity Surveying

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Intermediate

Urdu

Expert

Loading
Loading...
Loading...