chief land surveyor
Infinty construction co
Total years of experience :12 years, 7 Months
Responsibilities:
Verifying data and calculations ofsurvey, taking measurements of distance and Angles
calculations conducted at survey sites expert in data analyzing using CAD and GIS.
Establish legal property boundaries for sites based on legal documents survey record and land titles to
Clarify information about property boundaries.
Record the results of surveys, Including the shape, contour, location, elevation, and dimensions
of land or land features with good experience on advanced equipment like GPS TS etc.
Coordinate findings with the work of engineering and architectural personnel, clients, and
others.
Concerned with project Adjust surveying Instruments in order to maintain their accuracy.
Establish.
fixed points for use In making maps, using geodetic and engineering Instruments. Analyze
survey objectives and specifications in order to prepare survey proposals or to direct others in
survey proposal preparation.
Responsibilities:
Serving as a Head of survey teams for building structural & Utilities and road works on Project.
Analyzing project Planning, coordinating and supervising the work of survey crews Organizing work,
people and resources Study operational problems in coordination with site engineers and other related
experts Report on events and activities which may affect progress Coordinating with site engineers in order.
to ensure Organizing third party surveying Progress monitoring Maintaining of survey equipment Checking
IFC Drawings and preparing Shop Drawings Making survey reports in civil 3D and all related documents
for superior, engineers and consultant preparing all relevant drawings and as built for handing over.
Responsibilities:
Performed Supervise site according to drawings and specification, setting out and controlling
all axis, gridlines.
Structure work. Earth work, sewerage & manhole, duct bank, industrial &sanitary pipeline,
Portable water.
Excavation work for identifying pipes, finding locations &marking according to the specified
drawings by using.
Total Station and Level, data processing, as built drawing mechanical pipe line leveling as built
dwg and filter Layout.
Daily basis site inspection and work activity report share with construction manger.
With the direction of the project manger completed survey and feasibly report.
Support and direction and designing with project team Coordination with team and project manager.
Project Status: Completed
Responsibilities:
Supervised efficient working of crew members on various construction activities Performed research and
collected evidence to complete survey such as maps and deeds.
Evaluated survey data and ensured accuracy of information in coordination with crew members.
Communicated with team members and ensured completion of projects within timeframe.
Performed data process as built dwg structural column layout asphalt curbstone interlock and landscaping.
Project Status: Completed
Monitoring construction works as per IFC drawings. Carried out the inspection of survey work for different activities i-e R.O building, wells water
pipeline, Fiber optic cable, electrical cables mechanical trenches etc.
Reviewing shop drawings.
Supervise and provide guidance to survey team.
Comparing between Structural and Mechanical design to avoid any conflict.
Keeping all survey data up to-date.
Planning, managing & monitoring the implementation of correct QA/QC procedures for survey
section.
Identifying errors and informing engineers and ensuring zero defects in setting outs
Controlling work as per approved drawing/design.
Checking as-built works of the completed works for project hand-over.
Guide contractor to follow safety rules, Report any unsafe condition to HSE team.
Expert in dealing and communication with Clint and internal project team .
Daily basis report for R E
Status: Completed
Responsibilities:
Performed Marking of boundaries and limits for excavation Checking excavation after interval for formation level and to avoid over excavation
Putting level and offset points for blending concrete and also to align shutters for blending concrete
Marking the points for footing and properly monitoring that survey points to be properly followed by the
construction team
Marking the column points and then guiding the site foremen and supervisor how to follow and erect the
columns vertically and avoid any bend in columns
Extracting all the required data for sitting out and then let it checked by the consulting team also
Carried out inspections with consultant for all the site activity and prior any concrete pouring activities
taking as-built survey for all the excavation areas and the concrete done
Data processing, as built dwg structural column layout asphalt curbstone interlock and landscaping.
URL removed due to policy violation. Please contact support for further information.