Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
MUNNANGI SIVA PRASADA REDDY, Chief Engineer / Site In Charge

MUNNANGI SIVA PRASADA REDDY

Chief Engineer / Site In Charge·M.N.DASTUR & COMPANY (P) LTD

India

Diploma, Mechanical Engineering

Work experience

Total years of experience: 35 years, 10 months

Chief Engineer / Site In Charge

June 2019 - October 2020

M.N.DASTUR & COMPANY (P) LTD

Khammam, India

June 2019 - October 2020

Period : Since June 2019 - Till 31-10-2020.
CLIENT - RINL- Visakhapatnam Steel Plant.
Chief Engineer & Site In charge
Project : at 6.3 MTPA Expansion Project: Madharam Dolomite Mine expansion project.
Total Project Estimated Cost : Rs 1500 Million.
Man force deployed - more than 120.

Successfully Executed Tender Bids evaluation, Finalize the agencies for all balance project works and commissioning of the project.
Structural steel Cladding work -Executed successful Structural steel works above 2700 MT work for - all Buildings, Crusher, Screen houses, Conveyors, stock Bin House, Wagon Loading Fabrication and installation of all balance structures & cladding work.
Installation of Equipment: installation & commissioning trails of Crushers, Screens, Conveyors & wagon loading station etc.,
Electrical, Instruments & Automation work: Installation & Commissioning of equipment like MRSS, Transformers, LCSS, capacitor bank, MCC Rooms, control room&Total project illumination work etc., .

Company industry:
Management Consulting
Job role:
Construction and Building

Chief Engineer/ Bharch Head for Business Development.

April 2018 - May 2019

DASTUR ENGINEERING INTERNATIONAL GMBH-FOREIGN BRANCH

Manama, Bahrain

I found this job using Bayt.com

April 2018 - May 2019

Worked at “DASTUR ENGINEERING INTERNAL GMBH- Foreign Branch”, BAHRAIN.
Designation: Chief Engineer and Branch Head for Business Development.

Preparation of Tenders Bids, Received Work Orders & Executed successfully for supply of our Execution Engineers /Commissioning Engineers for our Clients:
- Fives Solios (France) - for their ALBA’s 6th Line Project
- Fives Solios (UK) - for their GARMCO’s Remelt Expansion Project.
 Preparation and submission of Tenders Bids for the following Projects :
- Design & Execution of ALBA’s SPL Project of estimated Project cost- USD $ 120 Million.
- Review, Study and submission of project report to Bahrain Ferro Alloys company (BAFA) for
their expansion Project.
- Preparation of all statutory study reports as per the guide lines provided by Bahrain
Electricity, Water and Authority (EWA).
- Design and Execution of Entire GARMO Plant’s Safety study & recommendations for
necessary safety practices for better safety management as per the Bahrain Government
national safety policy.
- Design and Execution for our client Fives Solios (France) - for ‘Providing the Workshop
Facilities’ estimated project cost USD $ 40 Million - in collaboration with Bahrain Govt for
Local Bahrain nationals skill development purpose.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Cheif Engineer/ Brach Head & Project Site In Charge

March 2016 - April 2018

DASTUR ENGINEERING INTERNATIONAL GMBH - FOREIGN BRANCH.

Sitrah, Bahrain

March 2016 - April 2018

CLIENT - GARMCO, North Industrial area, Sitra, Bahrain.
Project : Aluminum Remelt Expansion Project Total Project Cost : USD $ 72 Million.

Man force deployed - more than max.300 (entire work was executed Round the clock.

Successful execution of entire project commissioning:
Erection of all balance Mechanical Equipment for Mill Housing accessories, drives, gear boxes etc, Technological structures, fume extraction system and Pulpit etc.,
Successful execution of entire project commissioning as per contract schedules:
Civil Foundations RCC work - 15000 m³ for All steel structure Building, furnace Buildings - Raw
materials storage building, Administrative office, work shop, Canteen, MRSS, sub-station, MCC Rooms & Control Room, MCC rooms, Control rooms, Furnace Foundations, Caster Foundation from depth of (-)22mtrs.etc., .
Structural Steel & Cladding work up to 3000 MT pertaining to Melting, Finishing and storage Bay. Mechanical.Equipment erection of 900 MT connected to Tilting Furnace equipment, EOT Cranes, ID Fans Pumps, Fume exhaust with connected ducts, through Bag Filter house & Steel stacks, Fire Fighting system, Co2sytem, HVAC System.
Refractory and Insulation work : Total for Re-heating Furnace - 3000MT.
Electrical, Instruments & Automation work: Installation of all Systems along with cable tray laying, cable termination- MRSS, Sub Station, Transformers, MCC Rooms, Control Room, Automation & total project Illumination work.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Additional Chief Engineer (on deputaion as Team Leader )

November 2015 - March 2016

M.N.DASTUR & COMPANY (P) LTD

Salem, India

November 2015 - March 2016

Period : Since November 2015 to March 2016.
CLIENT - STEEL AUTHORITY OF INDIA LTD (SAIL) Salem Steel Plant.

Project : Cold Rolling Mill (CRM-3), (Stainless Steel).

Designation : on Deputation as Team Leader( Additional Chief Engineer )

Total Project Cost : Rs 4000 Million.
Executed cost of the project work: Rs1800 Million.
Man force deployed - more than max. 80 (Round the clock).

Successful execution of entire project commissioning:
Erection of all balance Mechanical Equipment for Mill Housing accessories, drives, gear boxes etc, Technological structures, fume extraction system and Pulpit etc.,
Fabrication and erection of piping connected piping with equipment. Lubrication systems, Roll Coolant system, Hydraulic systems, Grease system, Cooling water system with cooling towers, Carbon dioxide, HVAC system, fire fighting System.
Electrical, Instruments & Automation work: Installation of all Systems along with cable tray laying, cable termination- MRSS, Sub Station, Transformers, MCC Rooms, Control Room, Automation & total project Illumination work.

Company industry:
General Engineering Consultancy
Job role:
Construction and Building

Additinal ChiefEngineer / Resident Manager & Site In Charge

May 2014 - October 2015

M.N.DASTUR & COMPANY (P) LTD

Lingsugur, India

May 2014 - October 2015

Period : since May 2014 to November 2015.
CLIENT - KARE POWER Resources Private Ltd.
Project : Thangarabalu Small Hydro Power Project. Yelgondi, Lingasugur, Karnataka, India. Hydro power projects-(Cap - 2 X 12.375 MW)
Designation :Resident Manager /Site In Charge ( Additional Chief Engineer )
Total Project Cost : Rs 3600 Million.
Man force deployed - more than 300(Round the clock).

Successful execution of entire project commissioning:
Civil RCC work - above 260, 000 m³ for foundations like 450 mtr length Dam (River Diversion), 4 km of canal, Gates, 2no-Penstocks, Hydel Turbo generator foundations from (-) 38 mtr Depth, Tail ponds, MCC Room, Substation, MRSS, MCC Room, Control Rooms etc.,
Structural Steel & Cladding work to a total of 400 MT for Power house Building, Crane Girders and MCC Room & Control Room etc.,
Mechanical Equipment erection for technological structures, Penstock ducts, , Hydro-Gates, Hydro-Turbines, casings, Generators.
Electrical, Instruments & Automation work: Installation of all Systems along with cable tray laying, cable termination- MRSS, Sub Station, 18 Kms Transmission Towers installations, Transformers, MCC Rooms, Control Room, Automation & total project Illumination work.

Company industry:
General Engineering Consultancy
Job role:
Construction and Building

Additional Cheif Engineer / Resident Manager.

March 2013 - May 2014

DASTUR ENGINEERING INTERNATIONAL GMBH, DUSSELDORF, GERMANY.

Bintulu, Malaysia

March 2013 - May 2014

CLIENT - AML, Hongkong.

Project : AML’s ‘PERATAMA FERRO ALLOY COMPLEX’, BINTULU, SARWAK, MALAYSIA.
“DASTUR ENGINEERING INTERNAL GMBH-
Designation : Additional Chief Engineer / Resident Manager.

Total Project Cost: USD $ 450 millions.
Man force deployed - more than max of 700 (Round the clock)

Successful execution of entire project commissioning- 6 no-33MVA Ferro Alloy Furnace complex:

- Civil RCC work : Foundations for 6-Furnaces, Kiln, Sinter plant, , RCC Stack, Pump Houses, Cooling Towers, 250KVA MRSS, Transformers, MCC rooms, Admin Building, Canteen, Roads & Drains etc., all comes to a RCC quantity - 45000 m³.
- Structural Steel & Cladding work: for Furnace Bay, Casting Bay, Finished product Storage Bay, Crane Girders, Raw Material Storage Buildings, Raw water Storage Reservoirs and Emergency (Elevated)Water Tanks etc., Pump House, Emergency water tank, control rooms, pulpits which comes to a total quantity - 27000MT.
- Erection of Mechanical Equipment: for Furnace Shells, Kilns, Fume exhaust systems, ESPs, Dust extraction system, Steel stacks, EOT Cranes, crushers, screens, fire fighting systems, LDO/HSD systems, Fire fighting System, Co2 system, Emergency Generator Systems.
- Piping work: All connected piping with equipment. Lube systems, Hydraulic systems & Grease system, Cooling water system with cooling towers, CO2 & fire fighting System etc., ) Pipe pressure testing etc.,
- Refractory and Insulation work total for Furnaces & Kiln - 3000MT.
- Electrical, Instruments & Automation work: Installation of all Systems along with cable tray laying, cable termination- 250KVA MRSS, Sub Station, Transformers, MCC Rooms, Control Room, Automation & total project Illumination work.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Deputy Chief Engineer / Resident Manager

November 2011 - March 2013

DASTUR INTERNATIONAL INC., NEWJERCY, USA.

Jeddah, Saudi Arabia

November 2011 - March 2013

CLIENT: Al Rajhi Steel, Jeddah, Saudi Arabia (KSA).

Project: 1 MTPA, Combined Bar & Rod Mill (CBRM) at Jeddah, Saudi Arabia (KSA).
Total Project Cost : USD $150 millions.

Man force deployed - more than max. of 700 (Round the clock)

Successful execution and Commissioning of entire1MTPA CBRM Project as per contract schedules:
- Civil Foundations RCC work (above 15000m³) for all Buildings foundations, all Mill Equipment foundations, MCC Rooms, Pump Houses, Cooling Towers, RO plants, Scale pits of depth(-)24mtr etc.,
- Structural Steel and Cladding work for Melting Bay, Finishing Bay, Storage Bay and Billet Bay, Crane Girders, which comes to a total of 18000MT.
- Mechanical Equipment erection of Reheating furnace, Mill stands, Cooling beds, EOT cranes, scrapper, oil skimmers LDO/HSD storage tank which comes to 4500 MT.
- Piping work :All connected piping with equipment. Lube systems, Hydraulic systems & Grease system, Cooling water system with cooling towers, utility piping, CO2 & fire fighting System etc., installation, Pipe pressure testing, Pickling& Flushing etc.,
- Refractory and Insulation work : Total for Re heating Furnace - 2500MT.
- Electrical, Instrumentation & Automation work: Installation of all Systems along with cable tray laying, cable termination- MRSS, Sub Station, Transformers, MCC Rooms, Control Room, Automation & total project Illumination work.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Deputy Chief Engineer / Team Leader

October 2011 - November 2011

M.N.DASTUR & COMPANY (P) LTD

Bilaspur, India

October 2011 - November 2011

Client : KSK - Lafarge cements, CPP, Bilaspur, CG, India.

Deputy Chief Engineer/ Team Leader for the Coal Based Thermal Power Project (Cap-2 X 45 MW) Testing the operational performance.

- As in Role of Consultants for Bankers/ Financiers Performance guarantee tests were conducted satisfactorily, in co-ordination with client, round the clock for one week. All required Tests witnessed & documentation was made. Reports were analyzed & Final reports were forwarded our recommendations to Bankers.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Deputy Chief Engineer / Resident Manager.

November 2010 - October 2011

M.N.DASTUR & COMPANY (P) LTD

Korba, India

November 2010 - October 2011

Period : Since Nov-2010 to October, 2011.
Client : Vandana Vidyut Ltd at Korba, CG, India.
Project : Coal based Thermal Power Project - 35 MW X 2 no.
Total Project Cost : Rs 3600 Million.
Designation as Deputy Chief Engineer/Resident Manager.
Man force deployed more than max. 700.

Successful commissioning of entire Project:
Civil RCC work Foundations for Boiler, steam turbo generators, ground water reservoir Pump house Cooling Towers & all auxiliary equipment foundations, water treatment plants, Raw material storage building, ground Hopper, Crusher, screening, Conveyors foundations, MRSS, Sub station, MCC Room, Office&Admin building, Security building, RCC Chimney(-)180 mtr tall etc.,
Fabrication and installation of Structural steel for all the buildings which comes to 2700 MT.
Equipment & Technological Structures (up to +54 height) - 3600MT Equipment ( for material handling facilities weight bridges, coal crusher, screens, conveyors, Fans & Boiler, Steam drum, Generator, Condensers, ESPs, ID fan, Ash Handling Facilities), Boiler, Water Treatment Plant.etc., )
Refractory & Insulation work: Insulation & cladding for Steam piping, ESPs Boilers, Turbines etc.,
Electrical, Instrumentation & Automation work: Installation of all Systems along with cable tray laying, cable termination, MRSS, Sub Station, Transformers, MCC Rooms, Control Room, Automation & total project Illumination work.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Deputy Chief Engineer / Zonal In Charge,

July 2007 - October 2010

M.N.DASTUR & COMPANY (P) LTD

Khammam, India

July 2007 - October 2010

Period: since July-2007 to Oct-2010.
CLIENT - VSP- 6.3 MTPA Expansion Project.
RINL-Visakhapatnam Steel Plant.
Project : Madharam Dolomite Mine & Jaggayyapet Lime stone Mines, AP, India.
Designation - Dy. Chief Engineer/Zonal In charge.
Total Project Cost : Rs 2000 Million.
Man force deployed - more than 150.

Tender Bids evaluation, Finalize the agencies for all entire project works Executed -
Civil works : RCC - above 20000 m³ Equipment foundations for Crushers, stock bins, LCSS buildings, Pumps etc and Building Foundations etc.,
Structural steel & Cladding work-Fabrication & Installation up to elevation +36mtr at total of 3000 MT .

Company industry:
General Engineering Consultancy
Job role:
Engineering

Deputy Chief Engineer / Resident Engineer

October 2004 - June 2007

MN.DASTUR & COMPANY (P) LTD

Phuntsholing, Bhutan

October 2004 - June 2007

Period : since Oct-2004 to June-2007.
Client : Bhutan Ferro Alloys Limited (BFAL), Pasakha, Phuentsholing, Bhutan.
Project : BFAL’s Diversification and Expansion of Ferro Alloys Project (18MVA FeSi).
Total Project cost : Rs 1800 Million.
Designation as Dy Chief Engineer/Resident Engineer.
Man force deployed - more than 250.

Successful execution of entire project commissioning as per contract schedules:
Tender Bids evaluation, Finalize the agencies for Entire Project Works.
Civil works - above 10000 m³ RCC foundations for all equipment, Entire Buildings, Emergency Water Tank, RCC floors on Steel Structural Buildings at different elevations upto +45mtr.
Structural steel & Cladding work - Fabrication, Installation comes to 3000 MT.
Major Equipment - 18 MVA Revolving Furnace, Shell Raw materials Feeding system, Continuous electrode case facility, Case holding clamps with cooling system, Raw materials crushing, screening, Storage bins facilities with on line weighting, hot tapping facilities, Hot Metal Transfer cars, winches, Dust & Fume Extraction systems and De-dusting system, Micro silicon packing unit. Material handling conveyor systems, EOT Cranes, Recirculation pump house etc.
Piping work - 6 km piping work includes fabrication, installation and testing of all the utility lines, Lub system, Hydraulic systems etc.,
Refractory work-Furnace Shell with connected fume Duct.
Electrical, Instrumentation & Automation work : All Electrical Systems- MRSS, Sub Station, Transformers, MCC Rooms & total project Illumination work, instrumentation & automation work.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Superindent Engineer

July 2004 - September 2004

M.N.DASTUR & COMPANY P) LTD

Chaibasa, India

July 2004 - September 2004

Period : Since July-2004 to Sep-2004.
Client : TATA STEEL.

Project : TATA STEEL IRON MINES - Noumundi, Jharkhand, India for their Expansion/upgrading of captive mines capacity enhancement to 11 MTPA
.
Designation: Superintendent Engineer.

Successful execution of entire 11 MTPA Lump ore project commissioning:
On deputation for Lump Ore Plant - Up grading of Crushing, washing & screening plant - dismantling and installation of new equipment on existing facilities.
Successfully commissioned 11 MTPA facilities.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Superindent Engineer

June 2003 - June 2004

DASTUR ENGINEERING INTERNATIONAL GMBH, DUSSELDORF, GERMANY.

Annaba, Algeria

June 2003 - June 2004

Period : Since June-2003 to June -2004.
Client : ISPAT Annaba, ALGERIA ( Present ARCELOR MITTAL ).
Project: Ispat ANNABA (ALGERIA) - for 0.6 MTPA Split Bar mill
Total Cost of the Project: USD $75 Million.
Estimated value is around USD $ 42 Million.
Designation : Superintendent Engineer on deputation (to DASTUR ENGINEERING INTERNATIONAL GMBH, GERMANY)
Man force deployed - more than 200.

Successfully Executed & Commissioned all Mechanical equipment of the the plant :
Mechanical Equipment erection of Reheating furnace, all Mill stands, 2no Cooling beds, Fished product - Bundling facilities etc., EOT cranes, scrapper, oil skimmers LDO/HSD storage tank which comes to 1900 MT.
Piping work: All connected piping more than 70 Kms, with respective equipment. Lube systems, Hydraulic system & Grease system, Cooling water system with cooling towers, utility piping, CO2 & fire fighting System etc., installation, Pipe pressure testing, Pickling& Flushing etc.,

Company industry:
General Engineering Consultancy
Job role:
Engineering

Superindent Engineer (Team Leader - Commissioning)

April 2003 - May 2003

M.N.DASTUR & COMPANY (P) LTD

Pen, India

April 2003 - May 2003

Period : Since April-2003 to May-2003.
Client : ISPAT Dolvi ( Present JSW Jindal ).
Project : Integrated Steel Plant Commissioning from 1.2 MTPA to 2.4 MTPA.
Designation : Superintendent Engineer.
Man force deployed - more than 400(( Round the clock).

Successful execution of entire project commissioning:
On deputation as Commissioning team leader : Completed successful - installation of one-Hot Strip Mill’s Rolling Mill stand and 2nd SMS Facilities with Compact Strip Product(CSP) thin slab caster, On-Line Thin slab soaking Furnace, connecting to Mill stand & 2nd coiler facilities.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Superindent Engineer

November 2002 - April 2003

M.N.DASTUR & COMPANY (P) LTD

Barbil, India

November 2002 - April 2003

Period : Since November-2002 - April-2003.
CLIENT -TATA Sponge Iron Limited (TSIL) Bilaipada, Joda, Orissa, India.
Project : Coal based DRI project - TSIL’s 3rd Kiln facilities of Cap - 500 TPD).
Total Cost of the Project: Rs 3600 Million.
Designation as Superintendent Engineer.
Man force deployed - more than 15.

Executed in association with our team for obtaining the successful MOEF clearances from GOI - for report preparation - collecting samples of Soil, air & water quality (Flora & Fauna) reports &obtaining the required data as per the norms.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Senior Engineer

September 1999 - November 2002

M.N.DASTUR & COMPANY (P) LTD

Barbil, India

September 1999 - November 2002

Period : Since October September1999 - November 2002.
CLIENT -TATA Sponge Iron Limited (TSIL), Bilaipada, Joda, Orissa, India.
Project :Captive Power Plant, Cap-7.5 MW, Waste Heat Recovery from TSIl’s-2nd Kiln.
Total Cost of the Project : Rs 540 Million.
Designation as Senior Engineer.
Man force deployed - more than 150.

Successful execution of 7.5 MW Power plant commissioning:
Structural Steel, Cladding work : Successfully fabricated and installed around 300MT.
Mechanical Equipment installation above 1800 MT for waste heat recovery boiler, Boiler Drum and other ancillary Equipment for Steam Turbo Power Generator, condenser, De mineral water plant, Cooling Tower, recalculating pump House etc piping (IBR & Non IBR, including insulation & cladding) .,
Completion of major equipment retro-fit -installation - waste gas chamber rotation for connection along with refractory at + 36mtr, wt of 168 MT and waste gas chamber gate in between Kiln waste gases & Boiler.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Senior Engineer

July 1996 - September 1999

M.N.DASTUR & COMPANY (P) LTD

Barbil, India

July 1996 - September 1999

Period : Since July 1996 - September- 1999.
CLIENT -TATA Sponge Iron Limited (TSIL), Bilaipada, Joda, Orissa, India.
Project : Coal based DRI project - TSIL’s 2ndKiln facilities. Cap - 350 TPD.
Total Project cost is Rs 2400 Million.
Executed estimated value around : Rs 1100 Million .
Designation as Senior Engineer.
Man force deployed - more than 180.

Successful execution of project commissioning:
Successfully completed fabrication, Inspection & Installation of 18000 MT Structural Steel and Cladding work for of all Structural Steel Buildings, columns, Trestles, Floor beam, conveyors, Hoppers/Bins all are at an Elevation of +45 Meter.
Successfully completed mechanical equipment and technological structures includes Evaporating Cooling System, ESP, ID Fan (insulation & cladding) which comes at around 450 MT.
Successfully completed the fabrications, installation, testing and commissioning of Piping for all the utilities.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Mechanical Engineer

September 1993 - July 1996

M.N.DASTUR & COMPANY (P) LTD

Salem, India

September 1993 - July 1996

Period: Since September 1993 - July 1996.
CLIENT- Steel Authority of India Ltd (SAIL), Salem Steel Plant, Salem, Tamil Nadu, India.
Project : Stainless steel Hot strip Mill (HSM).
Total Project Cost : Rs 7200 Million.
Executed estimated value around Rs 2800 Million.
Designation as Engineer.
Man force deployed - more than 120.

Successful execution of project commissioning:
Successfully completed the installation & commissioning of 2700 MT Hot strip mill major Mechanical equipment which includes Reheating furnace, Edger, Reversible Roughing Mill, Reversible Finishing Mill (6 Meter High) Laminor Cooling system, Coiler and coil Finishing storage line., Pump House with cooling towers, , Lub oil system, Hydraulic oil system.etc.,
Supervised the erection of all Mill Housings, Edger executed with special lifting facilities - hired from UK based HSC - Heavy Lifters. Each Mill housing is around 180 MT.
Successfully commissioned around 90 KM of Piping for Lube oil, Hydraulic oil and other utilities.
Supervised all the Pickling and testing of the above Piping work with SMS Germany Contractors.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Assistant Engineer Mechanical

December 1992 - August 1993

M.N.DASTUR & COMPANY (P) LTD

Tarapur, India

December 1992 - August 1993

Period : since December 1992 - August 1993
CLIENT-Special Steels Ltd (Present - TATA STEELS LTD) Tarapur, Maharastra, India.
Project : Cold Rolling Mill (Special grade Alloy Steel) CRM Cap: 100000 TPA.
Total Project Cost : Rs1720 Million.
Designation as Assistant Engineer:
Executed estimated value around Rs 830 Million.
Man force deployed - more than 150.

Successful execution of project commissioning:
Successfully completed installation of 600 MT mechanical equipment which includes Sennzimer mill, 6 Hi-Skin Pass Mill, Pickling Bay, Hydrogen Based Annealing furnaces, Hydrogen Plant and other ancillary units.
Successfully fabricated and commissioned Piping which comes to 9 KM for all the Utility, Gas, Hydraulic and Lube oil lines.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Assistant Engineer Mechanical

January 1992 - November 1992

M.N.DASTUR & COMPANY (P) LTD

Bellary, India

January 1992 - November 1992

Period: Since January 1992 - November 1992.
CLIENT - Bellary Steels and Alloys Ltd (Sponge Iron Division) Bellary, Karnataka.
Project : BSAL’s Sponge Iron Division of 60, 000MT of coal based DRI (Direct Reduced Iron) plant ( Cap - 100TPD x 2no).
Total Project Cost: Rs.1400 Million.
Executed estimated value around Rs 850 Million.
Designation as Assistant Engineer.
Man force deployed - more than 150.

Successful execution of project commissioning:
Successfully completed installation of 750 MT Mechanical equipment which includes Horizontal kilns, coolers and other auxiliary equipment with connected Technological Structures. Successfully fabricated and commissioned Underground and over ground Piping which comes to 12 KM for all the Utility, Gas, Hydraulic and Lube oil lines. Water system connected with for Re-circulation Pump House with Cooling Towers, Fire fighting system.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Assistant Engineer Mechanical

August 1990 - December 1991

M.N.DASTUR & COMPANY (P) LTD

Visakhapatnam, India

August 1990 - December 1991

Period: Since August 1990 - December 1991.
CLIENT - Rashtriya Ispat Nigam Ltd (RINL)-Visakhapanam Steel Project, AP, India.
Project : VSP’s Rolling Mills - Visakhapatnam.
Medium Merchant & Structural Mill (MMSM) of Cap-1MTPA, Total Project Cost - Rs 8000 Million.
Light & Medium Merchant Mill (LMMM) of 1.2 MTPA Total Project Cost - Rs 12000 Million.and
Wire rod Mill (WRM) - 0.8MTPA Total Project Cost - Rs 6000Million.
Designation as Assistant Engineer.
Man force deployed - more than 200.

Successful execution of project commissioning:
Rolling Mill - MMSM:
- Mechanical Equipment installation and commissioning all 20 Rolling mill strand which comes to
around 1800 MT.
- Piping work : Installation and commissioning of 120 KM Piping work connected for all cooling
Water systems, Lub oil system, Hydraulic systems & Grease systems etc.,
Commissioning assistance for Rolling Mill - LMMM’s Billet Mill only.
Commissioning assistance for Entire Rolling Mill - WRM.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Mechanical Engineer

March 1990 - July 1990

ABAN CONSTRUCTIONS, CHENNAI. INDIA.

Visakhapatnam, India

March 1990 - July 1990

Period: Since March, 1990 to July 1990.
Worked with : M/s. ABAN Constructions, Chennai.
CLIENT : at Hindustan Shipyard Ltd - Offshore Flat Forms Division.
Project : ONGC’s Off Shore works for - “6 legged Off shore Jacket PE-1157 for ONGC”.
Estimated Project Cost : Rs 180 Million.
Executed estimated value around Rs 63 Million.
Man force deployed - more than 90.
Designation as Engineer:

Executed estimated value around Rs63 Million of around 975MT of Tubular Structures upto 63mm thk pipes of Ø2800mm.
Leading the Team of 90 (round the clock) and Involved & associated for the Fabrication, Inspection & Quality, Control Assembly of PE-1157 Jacket and Skidding activity of entire assembled Jacked to the barge.

Company industry:
Oil & Gas
Job role:
Construction and Building

Project Site In Charge

July 1987 - March 1990

J.K.Engineers, Visakhapatnam.

Visakhapatnam, India

July 1987 - March 1990

Period: since July 1987 - March 1990
Worked with : M/S. J.K. Engineers, Visakhapatnam for their works
CLIENT - RINL- VSP - 3.2 MTPA Steel Project, Visakhapanam, AP, India.
Project : at VSP’s Rolling Mills & Steel Melt shop Zonal area’s different various utility piping services- open yard / above ground & under ground
Designation: Site In charge

Successfully Executed the estimated value of the project - Rs 6 Crores.
Leading the of work force around 120 no for Supply, fabrication, Installing, Pickling & Passivation and Pressure Testing (Tested upto 350 Kg/Cm²) of various “utility services of 36 kms pipes / tubes of different sizes from Ø6mm to Ø2500mm.

Company industry:
Construction & Building
Job role:
Construction and Building

Trainee Enginner & Engineer

January 1985 - July 1987

DEVI ENGINEERING WORKS, CHENNAI.

Chennai, India

January 1985 - July 1987

Period : Since Jan, 1985 to July, 1987.
Worked with : M/s. DEVI ENGINEERING WORKS., at SIDCO, GUINDY, CHENNAI - India.
Designation: Trainee Engineer & Engineer.

Manufactures of “Cable and Wire Drawing Machines, and paper making units.
Leading the 18 no team, for Installation & Assembly commissioning of the equipment.

Company industry:
Manufacturing
Job role:
Manufacturing

Education

Directorate of Technical Education. Hyderabad, A.P.

December 1984

December 1984

Diploma, Mechanical Engineering

India

GPA (percentage): 67.75%

GPA (percentage): 67.75%

Project : Design , Material supply, & Manufacturing ( moulding, casting & machining )of - "Knuckle Joint". Submission of Detailed Project Reports - Design Engineering calculations of - Knuckle Joint, Details of Materials, arranging the all raw materials and manufacturing procedures.

Languages

Telugu

Native Speaker

English

Expert

Hindi

Expert

Tamil

Intermediate

Kannada

Intermediate

Malayalam

Intermediate

Arabic

Beginner

French

Beginner

Italian

Beginner

Malay

Beginner

Memberships

ISNT- Chennai Chapter

Professional Member ship

September 1998

Institute of Engineers( India)

Senoir Technian

November 1985

Hobbies and interests

Morning Walk,Anguling,Reading,Serving society thruogh charity trusts,Organise Cultral Fest,Games

Tzu Chi foundation, Bintulu, Sarawak, Malaysia : During 2013-cyclone/Flood-relief camps, distribution-Food,Medicine&Clothes to poor. Week Ends-conducting charity shows,Collecting Old items- Books,Papers & clothes and do recycling them. ISCON-Bahrain: Distributing food/clothes/Medicines to poor workmen at their camps. Conducting-Blood Donation camps every 3 months-with help of Govt. of Bahrain.