سياد عبد اللطيف أنداراثارا, QA/QC ENGINEER

سياد عبد اللطيف أنداراثارا

QA/QC ENGINEER

POSCO GULF SFC

البلد
الإمارات العربية المتحدة - رأس الخيمة
التعليم
دبلوم, Mechanical Engineering
الخبرات
10 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 9 أشهر

QA/QC ENGINEER في POSCO GULF SFC
  • الإمارات العربية المتحدة - رأس الخيمة
  • سبتمبر 2013 إلى مارس 2017

General:

1. Attending pre-Inspection Meeting with client & Contractors.
2. Implementation of Quality Assurance & Quality Control Program on mechanical, storrage tank, welding, Steel 3.Providing advice and guidance to the issue of Quality Controls
4. Inspection & Frequency Test, Audit QA/QC Contractor Departments, Reported progress, Weekly Inspection Report to CSR (Client Site Representative)
5. Assuring the performance of QA/QC resources to ensure all project’s Quality objectives are met
6. Attending Project Coordination / Construction Meeting to improve workmanship, Quality of Works Progress and to achieve target completion date
7. Responsible for assuring that all required certification documentation is produced and compiled in a Progressive and timely manner
8. Supervised welding and NDT activities, consist of monitor before during and after welding as per ITP 9.Review Film Radiography, Witness Welder Performance Test(WQT), Hydro test and PWHT
10. Review Material Certificate & Verification consists of Pipe, Plate (vessels), structure, fitting & accessories (Stud Bolt/Nut) etc together with Material controller
11. Liaison with client inspectors for inspections of Hold and Witness Point
12. Inspection as per ITP, Witness NDE performed, Review Manufacture procedure, Monitor Progress until millstone (delivery) report to QA/ QC manager
13. Well experience in steel structure and storage tank drawing


Document Preparation:
1. PQR, WPS, and WQT as per ASME Sec IX, AWS D 1.1, BS EN ISO 15614-1, BS EN 287-1 and Client Specification
2. Method statement, Daily Welding Reports, Weekly Inspection Reports, QA\QC inspection Reports 3.Punch List preparation before Hydro Test
4.Preparation and issue of Non Conformation Report (NCR) and Corrective Action Request (CAR) 5.Painting inspection and its document preparation
6.Final handover dossiers (manufacturer data record)Make soft copy for all dossiers & documents and handover to the client 7.To ensure that all handover system documentation was progressively handed over to the client

QA/QC Engineer في YOUNG HWA STEEL CO.FZ.LLC
  • الإمارات العربية المتحدة - رأس الخيمة
  • يناير 2012 إلى أغسطس 2013

General:
Attending pre-Inspection Meeting with client & Contractors.
Implementation of Quality Assurance & Quality Control Program on mechanical, piping, welding, Steel Structures, painting and insulation works
Providing advice and guidance to the issue of Quality Controls
Inspection & Frequency Test, Audit QA/QC Contractor Departments, Reported progress, Weekly Inspection Report to CSR (Client Site Representative)
Assuring the performance of QA/QC resources to ensure all project’s Quality objectives are met Attending Project Coordination / Construction Meeting to improve workmanship, Quality of Works Progress and to achieve target completion date
Responsible for assuring that all required certification documentation is produced and compiled in a Progressive and timely manner
Supervised welding and NDT activities, consist of monitor before during and after welding as per ITP Review Film Radiography, Witness Welder Performance Test(WQT), Hydro test and PWHT
Review Material Certificate & Verification consists of Pipe, Plate (vessels), structure, fitting & accessories (Stud Bolt/Nut) etc together with Material controller
Verification of Reinstatement of Piping systems after completion of all hydro testing activities Line walk and Punch List preparation before Hydro Test
Liaison with client inspectors for inspections of Hold and Witness Point
Inspection as per ITP, Witness NDE performed, Review Manufacture procedure, Monitor Progress until millstone (delivery) report to QA/ QC manager
Well experience in piping steel structure and storage tank drawing
Conducting Adhesion test, Curing test, Impact test, Contamination test, Holiday and Pinhole tests in buried pipe lines & Inside the Tanks with Client representative.
Inspection of all Coating & Insulation works as per Project Standards/Specification with Client representative.
Inspection of all materials using for Insulation, Blasting, and Painting and related works as per Inspection check list and also reviewing the Manufacturer Material Technical & Safety Data Sheets (Verification of Materials documentation & Visual Receiving Inspection.
Checking and Monitoring Relative Humidity, Dew point, Air temperature and steel temperature (Ambient Conditions), WFT and DFT.
Monitoring and inspecting all the Insulation activities such as Pre application (Inspection of surface prior to Insulation), Inspection of In process application,
Monitoring and inspecting of intumescent fire proof painting work


Document Preparation:
PQR, WPS, and WQT as per ASME Sec IX, AWS D 1.1, BS EN ISO 15614-1, BS EN 287-1 and Client Specification Method statement, Daily Welding Reports, Weekly Inspection Reports, QA\QC inspection Reports
Hydro Test Package preparation based on Line Schedule, System and Service Punch List preparation before Hydro Test
Preparation and issue of Non Conformation Report (NCR) and Corrective Action Request (CAR) Painting inspection and its document preparation
Final handover dossiers (manufacturer data record)Make soft copy for all dossiers & documents and handover to the client To ensure that all handover system documentation was progressively handed over to the client

QA/QC في BONG KYUNG CO.LTD
  • المملكة العربية السعودية - الجبيل
  • سبتمبر 2010 إلى نوفمبر 2011

General:


1. Providing advice and guidance to the issue of Quality Controls
2. Inspection & Frequency Reported progress, Weekly Inspection Report to CSR (Client Site Representative) 3.Assuring the performance of QA/QC resources to ensure all project’s Quality objectives are met 4.Progress and to achieve target completion date
5. Responsible for assuring that all required certification documentation is produced and compiled in a Progressive and timely manner
6. Supervised welding and NDT activities, consist of monitor before during and after welding as per ITP
6. Review Material Certificate & Verification consists of Pipe, Plate (vessels), structure, fitting & accessories (Stud Bolt/Nut) etc together with Material controller
7. Liaison with client inspectors for inspections of Hold and Witness Point
8. Inspection as per ITP, Witness NDE performed, Review Manufacture procedure, Monitor Progress until millstone (delivery) report to QA/ QC manager
9. Conducting Adhesion test, Curing test, Impact test, Contamination test, Holiday and Pinhole tests in buried pipe lines & Inside the Tanks with Client representative.

10. Inspection of all materials using for Insulation, Blasting, and Painting and related works as per Inspection check list and also reviewing the Manufacturer Material Technical & Safety Data Sheets (Verification of Materials documentation & Visual Receiving Inspection.

Document Preparation:

PQR, WPS, and WQT as per ASME Sec IX, AWS D 1.1, BS EN ISO 15614-1, BS EN 287-1 and Client Specification Method statement, Daily Welding Reports, Weekly Inspection Reports, QA\QC inspection Reports
Hydro Test Package preparation based on Line Schedule, System and Service Punch List preparation before Hydro Test
Preparation and issue of Non Conformation Report (NCR) and Corrective Action Request (CAR) Painting inspection and its document preparation
Final handover dossiers (manufacturer data record)Make soft copy for all dossiers & documents and handover to the client To ensure that all handover system documentation was progressively handed over to the client

QA/QC Engineer في Kazstroy Service Infra Sructure
  • الهند - نافي مومباي
  • يونيو 2006 إلى سبتمبر 2010

✓ Designation: QA/QC Engineer

✓ Period: 2006 June-2010 September
➢ Weld visual inspection, and defect rectification.
➢ WQT
➢ Preparation of Method statement for constructing and inspection.
➢ Preparing schedule for erections
➢ RT Analysis and repairing - rework
➢ Monitoring the daily activities and updating the progress reports and issuing to clients as well as filing.
➢ Arranging Clients for internal cleaning and Box-up of manholes prior to hydro-test and at the final hand over.
➢ Knowledge in sorting out interface problems with other departments as well as in common areas.
➢ Knowledge of permit systems for hot work, cold work.
➢ To ensure that the work is completed in time with the given specification and standards.
➢ To carry out the site work inspections by the consultant
➢ Strict adherence to safety regulations and conducting monthly safety audits
➢ To ensure construction activities with in company safety rules and standards

الخلفية التعليمية

دبلوم, Mechanical Engineering
  • في Coimbatore under board of technical education
  • أبريل 2006

➢ DIPLOMA:-Mechanical Engineering. From NIT Coimbatore under board of technical education INDIA with an aggregate of 70%. ( first class)

Specialties & Skills

اللغات

الهندية
متمرّس
الملايام
اللغة الأم
الانجليزية
متمرّس
التاميلية
مبتدئ

التدريب و الشهادات

ISO 9001 AND NDT LEVEL2 (الشهادة)
تاريخ الدورة:
August 2009
صالحة لغاية:
November 2009