Chief Surveyor "Land Surveyor"
Lynx Contracting Company
Total years of experience :14 years, 11 Months
Attending request from Sub-Contractors for inspection for all survey and setting out based work on a daily basis, ensuring that all works are validated on site.
Checking the Sub-contractors drawings and site operations in relation to required survey checks and reviews.
Preparing daily project reports (written and photographic) on progress of the works for survey related matters.
Reviewing and comment on shop drawings for setting out accuracy and identify any existing areas which may be affected by the proposed Site construction works.
Assisisting the Sub-contractors Land Surveyor to address key stakeholder queries in relation to the orientation of the proposed works as required.
Continually monitor the works to ensure the sub-contractor complies with his agreed site safety policies and proposed methods of working and where necessary prohibit continuation of unsafe execution of works by the Contractor.
Ensure that any safety concerns are reported to the site management team and relevant safety officers.
Attend periodical technical, safety, quality and progress meetings as and when required.
Constantly review the sub-contractors ongoing and scheduled work to ensure that potential issues are identified and raised prior to causing an impact on the progress of the works on site.
Head of Survey Department And Responsible for All Surveying Works At Civil Projects like :-
1.Export and Import Surveying Data From Shop Drawings .
2. Prepare and maintain sketches, maps, reports, and legal descriptions of surveys in order to describe, certify, and assume liability for work performed.
3. Responsible for the Quality Control and Quality Assurance of Survey Data, Field Checks, Calibrations and Survey Results
4. Record the results of surveys, including the shape, contour, location, elevation, and dimensions of land or land features.
5. Calculate heights, depths, relative positions, property lines, and other Characteristics of Terrain.
6. Plan and conduct ground surveys designed to establish baselines, elevations, and other geodetic measurements.
7. Perform other tasks as assigned by the project management .
8. Support, advise and facilitate the Site Project Team in survey and operational matters .
9. Reports all survey activities via the Weekly Survey Report to the Project Manager (Personnel, Equipment, Activities, Planning).
10.Responsible for the Installation and troubleshooting of survey equipment, hardware and software
11. Cut &Fill Volume Calculation .
Head Of Surveying Department IN Company
Responsible for
responsible for upcoming field tasks, to include planning, scheduling, calculations, materials, and equipment necessary for surveying, control, and various building systems layout.
ensure that the work is performed to client quality standards, and fully meets the intent and specific requirements of the contract.
make sure that the results are presented in a manner that is accurate, efficient, timely and above all professional.
worked as a sr. land surveyor for KAp03 for Ministry of Interior of KSA " the new Passport building in jeddah "
and KAIA " King Abdulaziz International Airport " the New Airport
responsible to mange the Surveying Teams And Make All coordination Of Surveying Drawings, And lead The teams at Site And Supervise All Surveying Works
Working As Buildings Surveyor At The New Taif University Projects (T.U.H) Taif university Housing, and (T.U.M) Taif university Medicine collage .
total amount of this projects : more than 750 millions sr
consultant : zfp Zuhir Fayez And Partners "
working For All Surveying Works At Building Such As :
Foundations, Slabs, Columns, Leveling, false ceiling, fire fighting, irrigation systems, landscape etc "
working on levels, total stations
Working as Roads Surveyor in The Infrastructure of New Port Said Container Terminal.
Faculty Of Arts , Geography Department , Surveying Division