صهيب  زاهد, Signaling Engineer

صهيب زاهد

Signaling Engineer

Hitachi Rail STS

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Electrical Communication Engineering
الخبرات
7 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :7 years, 3 أشهر

Signaling Engineer في Hitachi Rail STS
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ فبراير 2024

Signaling and Asset Protection Systems maintenance and engineering management.

Testing Commissioning Engineer في Hitachi Rail STS
  • الإمارات العربية المتحدة - أبو ظبي
  • سبتمبر 2022 إلى سبتمبر 2023

Installation, commissioning and validation for all subsystems like DED, HWD, ABD, WILD, HABD, WIM, RFID, RHTM etc of APS on HW/ SW level.
Prepare test reports in according project process.
HW/ SW configuration management.
Support integration and System test.
Check correctness of the documentation in use.
Check the completeness of list of the appendix inspection reports of the site installation test.
General installation inspection and product traceability.
Supervise the subcontractor activities.
APS equipment start-up.
Configuration and Verification of APS subsystems.
Standalone, Communication, Configuration, MSN, Functionality and Diagnostic tests.
Trackside objects calibration.
Perform SAT/ PAT/ FAT/ SIT test with Client/ Consultant.
Prepare and Raise ITR/ Punch list etc

Lead Engineer في Orange Line Metro Rail Transit System Lahore
  • باكستان - لاهور
  • يونيو 2020 إلى أكتوبر 2021

• In charge of Monitoring, Supervising and Controlling of Operational activities in the OCC and as well as stations
• Responsible to prepare timetable for train services and monitoring of train service punctuality and availability through different ATS reports and Time Distance Graph.
• Responsible for the information to be communicated to the various management levels.
• Responsible for defining the scenarios of operation in degraded mode and recovery plan, in case of incidents
• Assisted Director Operation & DGM OCC to review and analyze operations and monitor system performance to identify and solve problems and ensure efficient and cost effective operations.
• Prepared maintenance/ incident/ daily operation reports, correspondence, standard operating procedures.
• Plan and implement maintenance schedules.
• Ensure maintenance or installation activity to be done according to the approved Method Statement
complying complete safety protocols.
• Facilities Management for all 26 stations, Main Sub stations, depot, S. Yard
• Approve temporary/emergency constructions(maintenance) after go through their work methodology.
• FAS, BAS, SCADA, HMI, MMI, Signaling System operations and maintenance management.
• Secure and meet KPIs for train operations and faults handling.
• Monitor and Evaluate performance of the OCC Controllers and subordinates to ensure performance with the directions goals and objectives and eliminate impediments to peak performance.

IVVQ Engineer/ Consultant في Thales
  • الإمارات العربية المتحدة - دبي
  • مايو 2019 إلى مايو 2020

• Prepare and verify CCTV system configuration data using various tools(TVS, Ode etc).
• Apply the configuration data/script files on desired station using Ansible and other tools.
• As per design, install and configure NVRs (Linux Servers) and VMs(Web Machine etc) onsite and troubleshoot
for any problem/issue.
• Testing and Commissioning of every component of CCTV system.
• Integrate CCTV in OCS system and test/verify its working on OCS level.
• As a PIC ensure safety for installations and other activities.
• Escalate issues where necessary and provide status report to the IVVQ Manager

CCTV System/ Network Consultant & Auditor في Abu Dhabi Monitoring and Control Center
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2017 إلى أبريل 2019

• Consult and audit several commercial entities for their CCTV Security Systems as per security standards.
• Complete technical assessment of project design; submittals, specifications, software/systems, programs,
schematics/SLD, operational/product manuals, blueprints, and soft drawings.
• Onsite testing and verification of configuration and working of Video Management System/ NVR, CCTV
cameras/ coverage levels(Identification, recognition and detection), Storage(SAN/NAS/RAID configuration),
SNMP Log server and Firewall.
• Testing and verification of redundancy on HLD/LLD for Servers/Switches/Storage.
• Provide consultancy during the project approval or during/after the onsite audit, for compliance.
• Prepare and maintain inspection report for the inspection/audit

CCTV System Engineer في Advanced Technology systems Fujairah
  • الإمارات العربية المتحدة - الفجيرة
  • سبتمبر 2016 إلى مارس 2017

• Prepare proposals, BOQ after site survey for CCTV system/ network.
• Project design/ Autocad Design (Single Line Diagram/ Layouts) and Estimation.
• NVR, Router(Remote View) and CCTV cameras configurations as per client requirements.
• Project deployment plan and implementation.
• Testing/commissioning and project completion/handover report

Electrical Design Engineer في Enmaa Engineering Consultancy Sharjah
  • الإمارات العربية المتحدة - الشارقة
  • يوليو 2016 إلى أغسطس 2016

• AutoCAD drafting/ Electrical designing for lighting systems..
• Installation of lighting systems as per design/plan.
• Figure out load schedule/ power schedule and cable calculation

IT Support Engineer في Touchpoint Pvt Ltd
  • باكستان - إسلام أباد
  • يناير 2016 إلى يوليو 2016

• Several types of ATM installation after confirming the requirements.
• All types of Soft and hard configurations for ATM machines.
• On call Support and onsite fault diagnostics and rectification.
• Develop training materials and procedures, and train users for the proper use of hardware and software.
• Prepare reports for new ATM installation or fault rectification/remedial action.
• Perform ATM Preventive maintenance as per PM plan

Trainee Engineer في WAPDA
  • باكستان - Swabi
  • أكتوبر 2015 إلى أكتوبر 2015

• Operation & Maintenance for Power Generating Machines, Switch yard, Grid Station and Electrical System for
power house.
• Complete DAM/ hydra power generation mechanism and procedure.
• Control for Digital Governor System/Digital Exciter.
• Maintenance and Several tests for Transformers.
• Power Factor improvement and machine efficiency
• Instrumentation and Protection System for Turbines/ Generators/ Switch yard

الخلفية التعليمية

بكالوريوس, Electrical Communication Engineering
  • في University of Engineering and Technology Peshawar
  • يونيو 2015

Specialties & Skills

Management
Customer Service
Field Work
Goal Orientation
Marketing Communications
COMPUTER HARDWARE
CONSULTING
CABLING
Maintenance Management
operations management
APACHE WEBSERVER
AUTOCAD
CUSTOMER RELATIONS
installation
testing commissioning
Project Management
Commissioning
Electrical Engineering

اللغات

الانجليزية
متمرّس
الأوردو
اللغة الأم

التدريب و الشهادات

ISO 55001 Asset Management System (تدريب)
معهد التدريب:
Orange Line Metro Rail Transit System Lahore
Trade Proficiency Certificate (تدريب)
معهد التدريب:
KPK Technical Board
Person's In charge Controller (تدريب)
معهد التدريب:
Serco
Thales Video System certified (تدريب)
معهد التدريب:
Thales Middle East
Security Monitoring Standards V4.0 (تدريب)
معهد التدريب:
Abu Dhabi Monitoring and Control Center
Video Surveillance Systems Standards 5.0 (تدريب)
معهد التدريب:
Abu Dhabi Monitoring and Control Center
Train the Trainer (تدريب)
معهد التدريب:
Orange Line Metro Rail Transit System Lahore
Operations Controller (الشهادة)