HCIS Project -Diplomatic Quarter Area.
Total built area 50000 m², contract value SAR 520M, Designer Zuhair Fayez.
Project consist: Infrastructure, Buildings, Transformers room, Electrical room, Generator room,
water tanks, and Pump Stations.
Two District Cooling plants/Power plant in KAFD Project (SAR 200M).Main
Contractor: SNC-Lavalin. - Consultants: AECOM/Stanley.
Owner: Al Rayada (RIC). Total Built area 25000 m².
ITCC Project, Four towers (5B+GF+20 Floors), plus six buildings
(2B+GF+6Floors), (2.6 billion S.R).Consultant: Dar Al Riyadh. - MEP Works:
Drake and Scull. - Owner Al Rayada (RIC)
Al Arrab Contracting KSA-Riyadh (simultaneously with above project)
Hospital 420 Bed (B+GF+4 Floors) in Al Ahsaa Eastern region. Consultant Khatib
&Alami. Main Hospital building 9 floors; External clinics building; Kidneys
and tumors building; Physiotherapy building, Cars parking building, Doctors
and nurses residences; and Services building.
Silver tower (2 B+4 P+40 floors)-Dubai Business bay. (500 million AED).
Consultant Khatib&Alami -Owner: TAMEER.
(simultaneously with above project)
Mena-
Mecca Projects. Large scale project Private Buildings, Infrastructure, water
treatment. Power plants and Road works.
Musaffah Dhafra Project. Governmental and Industrial
Buildings:
Lebanese Energy Company-onshore and offshore Oil and Gas- Lebanon 1993
Position site Manager .Bulk Terminal Project (Zahrani).
The terminal Plant sits on an area about 100000 m², consist: Storage tanks, loading
area, Pumps stations, Transformers, Electrical, Generator room.as well as Potable
and Fire Tanks.