Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
soji Varghese, Estimation  Engineer

soji Varghese

Estimation Engineer·AE ARMA ELEKTROPANC

United Arab Emirates

Diploma,

Work experience

Total years of experience: 25 years, 1 months

Estimation Engineer

November 2012 - Present

AE ARMA ELEKTROPANC

Abu Dhabi, United Arab Emirates

November 2012 - Present

Working with AE Arma Elektropanc as an Estimation Engineer in the Tendering team. In my duty, taking the Quantities of Electrical accessories and materials from the tender drawing with the help of Software. Six months worked in the project Al Shohub private school, Khalifa city, Abu Dhabi. |In these duration attend the jobs related QA, QC and prepare the Inspection schedules. Attend the site engineering works for this 52 class room building.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical Asst. Engineer

March 2012 - October 2012

no name

India

March 2012 - October 2012

Co-ordinate the Electrical works, wiring and check the drawings for the particular works of villa.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Maintenance Supervisor/Asst.Site Engineer

February 2009 - January 2012

saudi bin ladin group (sbg)

Riyadh, Saudi Arabia

February 2009 - January 2012

Works for the project King Abdullah Financial District, Riyadh. Working at Low and medium voltage errection and maintenance works.Telephone and fire alarm works. Preparing load schedules, estimation, quantity survey of the site works. Co-ordinating foremen for the maintenance works managing more than 30 electricians through foremen. Look after the maintenance works of equipments which were using in site. Designs the office lighting layouts and prepare drawings also for that..

Company industry:
Installation & Technical Services
Job role:
Maintenance, Repair, and Technician

Electrical Supervisor

October 2005 - February 2009

Wonderla Holidays Pvt Ltd.

Bengaluru, India

October 2005 - February 2009

Worked wonderla for the Maintenance, Errection, and commissioning of Imported rides using PLC and drive control systems. Includes RO and STP.
The entire entire breakdown and trouble shooting works carried out by the maintenance team.The incoming supply of the Electrical sub station is 11kv., and with the help of a 2MVA transformer taken ouputs for the distribution.
The periodical maintenance of the protective devices at the high voltage side is Vacuum circuit breakers, Medium voltage breaker Air circuit breakesalso carried out by the maintenance team itself.Co-ordinate the errection works of the panels, Cable trays with cabling and bus bar systems of medium voltage panels.
Park had a back up of 2520KVA back up generators. Prepared the maintenance schedule of the total elecrical system and sub station equipments in the park together with Senior engineer.The park had its own Industrial eater and Borewell treatment plants.The whole maintenance of the PLC controlled system also carried out by the electrical team itself.

Company industry:
Entertainment
Job role:
Electrical Engineering

Sub Station Operator

September 2003 - October 2005

Bharat Petroleum Pvt Ltd.

India

September 2003 - October 2005

The company’s 110kv.sub station’s operation and maintenance carried out by Electrotek Engineers Pvt ltd. Oil and Vacuum circuit breakers are used for the protection of the main outgoing electrical system. For power factor control HT capacitor banks are provided. For pumping products.Attended the maintenace works for the sub station, the motors placed in site and its panels for the product pumping. Check and prepare the periodical preventive maintenance schedule and supervise the maintenance works also.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Engineering

Shift assistant

October 2002 - August 2003

KSEB

India

October 2002 - August 2003

In this distribution system assisting the operator is the duty. The systems have 66kv. Incoming voltage supply and 11kv, 415v, outgoing feeders included. For protection purpose of the distribution system VCBs are using in High Voltage side. Attended the periodical, Breakdown maintenance works of breakers, Lightning arrestors, and other isolators and all other equipments in the substation together with KSEB staffs.

Company industry:
Technical Maintenance & Repair
Job role:
Engineering

Electrical Technician (Apprentice Trainee )

November 2000 - November 2001

Kerala State Electricity Board (KSEB)

India

November 2000 - November 2001

Attending all the breakdown complaints comes under the 66kv. Substation Peermade. Office works related new connections and disconnections of the domestic and commercial consumers under the elctrical section. Attended the break down maintenance of transformers placed in site. Attended the Low tension and High tension line faults with the help of KSEB staffs.Maintaining the office registers.

Company industry:
Electric Power Production & Transmission
Job role:
Electrical Engineering

Sub Engineer Trainee

June 2000 - November 2000

The Travancore Cements Ltd

India

June 2000 - November 2000

Assisting the company staff in electrical dept. with the works. In this plant 11kv. incoming supply. The plant consisting of Large number of AC motors . Attended the maintenace works together other with company staffs.The company is using automated systems for the production of the white cement and its loading area.

Company industry:
Industrial Production
Job role:
Engineering

Education

Govt.Poly Technic ,Kerala

March 1999

March 1999

Diploma,

India

Passed the Electrical engineering diploma with 63.5% of marks.

Technical High School , Kerala

March 1999

March 1999

High school or equivalent,

India

Passed the Technical High School Leaving cerificate exam with 74.7% marks. And at the high school duration Electronics takes as the specialised subject.

Skills

Motors
Expert
Motors
Expert
Panels
Expert
Panels
Expert
Operation
Expert
Operation
Expert
Protection
Expert
Protection
Expert
Approvals
Expert
Approvals
Expert
Autocad 2006
Intermediate
Autocad 2006
Intermediate
PRIMAVERA
Beginner
PRIMAVERA
Beginner
Microsoft Excel and Word 2003,2005
Intermediate
Microsoft Excel and Word 2003,2005
Intermediate
work with picassa photo editing
Intermediate
work with picassa photo editing
Intermediate
Quantity Take off / Autodesk
Intermediate
Quantity Take off / Autodesk
Intermediate
Motors
Expert
Motors
Expert
Panels
Expert
Panels
Expert
Operation
Expert
Operation
Expert
Protection
Expert
Protection
Expert
Approvals
Expert
Approvals
Expert

Languages

English
Expert
Hindi
Expert
Urdu
Intermediate
Malayalam
Expert
Kannada
Beginner
Tamil
Intermediate
Arabic
Beginner

Training and Certifications

Certifications
Diploma in Electrical CADD
cadd centre
Mar 2010 - May 2010