صبح بدر, Project Manager- Utilities Department

صبح بدر

Project Manager- Utilities Department

Parsons

البلد
الإمارات العربية المتحدة - دبي
التعليم
دكتوراة, Technical Sciences (Hydraulics & Engineering Hydrology)
الخبرات
17 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 6 أشهر

Project Manager- Utilities Department في Parsons
  • الإمارات العربية المتحدة - دبي
  • مارس 2008 إلى يونيو 2011

Parsons is a leader in many diverse markets such as infrastructure, water distributor in Dubai, environmental, industrial manufacturing, life sciences and homeland security.

Key Responsibilities:
• Defined project objectives including delineation of scope, budgeting, scheduling, setting performance requirements and assigning field-specialists.
• Managed the whole gamut of dry and wet utility services right from designing infrastructure to implementation as per project schedules/budget lines.
• Administered sectional processes and evaluations / plans to guarantee standard running conditions of all utilities of the plant.
• Reviewed project and technical drawings pertaining to storm water, sewerage networks, irrigation network and water distribution networks including design calculations, specifications as well as offering assistance in estimation of project costs and bills of quantities.
• Directed the assigned project resources to overcome triple constraints- project scope, time and cost.
• Provided technical support to subordinates for analyzing engineering designs and drawings, construction and structural issues, errors, omissions and executing requisite measures for resolving the same.
• Liaised with the utility service authorities and QA / QC Manager to ensure strict adherence to quality control procedures.
• Monitored / devised strategies for reducing suspended solid carry over through secondary clarifier, sewage effluent treatment and water reclamation for irrigation purposes.
• Conducted regular site visits to ensure execution of projects as per set schedules/plans, organized meetings, formulated project correspondence/reports and submitted the same to upper management for further analysis.

Key Projects to Credit:
• Dubai Arabian Canal Development Project- Storm water Drainage network Phase I and Phase II.
• Dubai International Financial Center Project: Infrastructure and Utility services.

Project Manager - Utilities Department في Khatib & Alami
  • الإمارات العربية المتحدة - دبي
  • يناير 1994 إلى فبراير 2008

Key Responsibilities:
• Applied appropriate technologies and devised methodologies to design, develop and simulate state-of-the-art designs for projects under my scope.
• Conceptualized and designed the project work for sewerage and storm water networks, reviewed and finalized designs as well as conducted value engineering exercise.
• Assured procedural adherence, catered to any unexpected technical difficulties, identifying bottlenecks and recommending alterations if required to circumvent bottlenecks.
• Managed high end project management concepts like critical path management, material and human resource management to plan and efficiently organized the site facilities to meet deadlines.
• Evaluated / approved design changes, specification and drawing releases. Coordinated activities concerned with technical developments, scheduling, and resolving engineering design and test problems.
• Maintained highest standard of quality on deliverables as per envisaged implementation methodology and ensured that escalation procedures are followed.
• Implemented a wide variety of engineering solutions to increase equipment availability and operation rate, optimize manpower and machinery usage, reduce operation losses and achieve standard/acceptable production rates.
• Acted as a member of engineering and technical group, evaluated sewage treatment network design proposals and recommended appropriate measures for the same.
• Employed AutoCAD programming techniques for designing networks, thus lowering the project costs and shortening design cycle.

Continued في Continued
  • الإمارات العربية المتحدة - دبي
  • يناير 1994 إلى فبراير 2008

Key Projects to Credit:
• Dubai Municipality Contract DS135 - Sewerage, Drainage, Irrigation, Water Supply Network and Firefighting System for Sama Al Jadaf Residential Areas Community No. 326 (USD 76 million)
• Dubai Municipality Contract DS143 - Sewerage and Drainage System for Al Warqaa Community C 423 Residential Areas (USD 52 Million)
• Dubai Municipality Contract DS152 - Sewerage and Drainage System for Al Warqaa Community C 424 Residential Areas (USD 60 Million)
• Dubai Land Project
• Dubai Municipality Contract DS127 - Sewerage and Drainage System for the Labor accommodation in Al Quoz Industrial Areas (USD 80 Million)
• Dubai Municipality Contract DS164 - Pump Station and its Rising Mains (USD 155 Million)
• Dubai Silicon Oasis Project
• Drainage System for The Heavy Equipment Park (JAFZA)
• Water Supply Network for Dubai Aid City
• Oman Muscat Wastewater Scheme
• Jewel of Muscat
• Doha and Rayyan Sewerage - PS32A Main Forwarding
• Water Supply Network, Surface Water and Sewerage Systems for East, West and South of Al Kheesa in Doha
• Water Supply Surface Water and Sewerage Systems for Umm Salal Phase II in Doha
• Roadwork’s & Infrastructure project, The Green Community in Dubai Investments Park, UAE
• DS 117 Main Pumping Station ‘K’ - Sewerage and Drainage (from Dec 1999 - Sept 2001)
• Dubai Municipality Contract DS86 - Pump Station Rising Mains
• Al Awir Sewage Treatment Plant
• Department of Civil Aviation (Government of Dubai)
• TD121 - Dubai International Airport Expansion Project - Storm water Drainage System - Phase 1
• Dubai Municipality Project DS 68/6 - Jumeirah & Al Safa Sewerage and Drainage
• Water Supply Sewerage and Drainage Networks for Al Hamra Infrastructure Project, Ras Al Khaimah
• Dubai DS96 - Dubai Master Plan Sewerage and Drainage
• Al Wajbah Palace Sewerage System, Qatar
• Doha & Al Rayyan Sewerage System, Qatar- PS 12A/II
• R689 - Planning Works for Al Warqah Residential Area

Continued في Continued
  • الإمارات العربية المتحدة - دبي
  • يناير 1994 إلى فبراير 2008

Key Projects to Credit (Cont'd):
• R674 - Planning Works for New Hatta Residential Area
• Planning and Development of Al Zora Area, Ajman, and Ajman Municipality project
• Jumeirah & Al Safa Sewerage and Drainage, Dubai - Project DS68 (9 Phases) (Dhs 400 million)
• Buraimi Water Supply Project
• Oman - Ministry of Regional Municipalities and Environment - Nizwa & Samail Wastewater Treatment Plants and Sewerage System Network
• Palestine Economic Council for Development and Reconstruction (PECDAR), Gaza - Salah El Din Road (USD 80 Million)
• Storm Water and Sewerage System for Salah El Din Road (Eriz - Rafah)
•Etihad Rail Project, Abu Dhabi UAE- Project Management Consultancy Service. - Lead Drainage Manager for length of 1200 km.
•Abu Dhabi Operation and Maintenance Project Zone 1.
•Access to Palm Deira- Lead Utilities manager.
•Road Drainage Manual for Emirate Abu Dhabi -DOT

الخلفية التعليمية

دكتوراة, Technical Sciences (Hydraulics & Engineering Hydrology)
  • في Moscow State Automobile & Road Construction Institute (Technical University)
  • يونيو 1994

Publications: • Hydrological Study for Rivers in Lebanon, Automobile Highways Magazine, No. 8 (1993). • Air Pollution Monitoring in Modern Cities, Emirate of Dubai, Environment & Development Magazine (July - August 1998). • Effect of Rainfall and Ecological/Economic Factors on the Road Networks in Lebanon, Environment & Development Magazine, in review. • Procedure for Maximum Rainfall Calculation Applicable to Highway Structures in the Republic of Lebanon, Ph.D Dissertation (1994). • Highway Soil Material Analysis for Roads in the United Arab Emirates (1989).

ماجستير, Civil Engineering
  • في Moscow State Automobile & Road Construction Institute (Technical University)
  • يونيو 1988
دبلوم, Business and Office Practice
  • في Siblin College
  • يونيو 1982

Other Professional Trainings / Courses: • Haestad Methods - A+ Master Modeler in Wastewater Collection Modeling and Design • Project Management • Sharp / Start Management Trainings - Parsons • Safety and Ethics Training - Parsons • Geographic Information System (GIS) Services Division -Khatib and Alam • Water Hammer (KYPIPE Software), Surge Analysis for Piping Networks

Specialties & Skills

Planning
Infrastructure Projects
Storm Water Management
Wastewater
Construction Design
Engineering Software: Mouse GIS, Arc Info Works, Sewer Cad Storm Cad, H2O Net
Project Management, Project Testing & Commissioning, Quality Assurance, Reviewing Technical Drawings
Design Engineering, Design Audits, Leveling, Coordinating Various Departments
Contractual & Client Negotiations, Tendering, Coordination and Development, Manpower Distribution
Leadership, Team Building, Motivational Skills, Interpersonal & Communication Skills
Analytical Skills, Ability to Work Under Pressure, Decision Making & Problem Solving Skills
MS Office & Internet Usage
Budget Estimates & Feasibility Studies, Planning & Scheduling, Report Generation
Construction Plans-Conceptualizing, Designing & Detailing, Managing, Surveying, Developing,Sketching
ms project
program management
marketing
operation
project execution
materials
procurement
negotiation
project planning
problem solving
engineering management

اللغات

العربية
متمرّس
الروسية
متمرّس
الانجليزية
متمرّس

العضويات

Canadian Council of Professional Engineers (CCPE)
  • Member
  • June 2005
British Columbia Waste Water Association (BCWWA)
  • Member
  • September 2007
British Columbia of International Trained Engineers (BCITE)
  • Member
  • September 2008
Water Environmental Federation (WEF)
  • Member
  • September 2008

الهوايات

  • Reading, Musics, Swiming