Electrical Engineer
Al Khaddah Group, Kuwait
Total years of experience :9 years, 11 Months
Electrical Maintenance, Electrical Inspection, Equipments inspection, Power Distribution, Utility, Low voltage system installation and maintenance, Project Planning & Scheduling, Industrial Lighting, Commercial Lighting, Audit support, Procurement, Machineries & equipments scheduling & maintenance, Electrical Safety, Electrical Standards & Procedure (NFPA 70E, ANSI, IEC, IMS, NEC), KOC electrical codes & Standards (KOC.SA.27 & 22, KOC.E-001, 002, 003 (Part #1 to 5), 004 (Part#1 to 6).
Electrical Maintenance, Inspection, Distribution, Utility, Construction, Procurement, Internal Auditing, Administration, Corporate Assistance, Electrical Safety, Industrial Lighting, Commercial Lighting, Facility Maintenance, Project Management, Projects Planning and Scheduling, SAP ERP Modules SAP PP, SAP MM, SAP PM, SAP QM & SAP PRC, SAP PRA, SAUDI ARAMCO Electrical Codes & Standards (ANSI, ASTM, BSI, IEEE, ICEA, IEC, NEMA, SASO, NFPA 70E, NEC, IMS)
Electrical Maintenance, Inspection, Cable calculations & laying, Power calculations, Electrical Safety, Electrical Low voltage distribution, industrial & commercial lighting, Equipment installation and maintenance, preparation of distribution systems, etc.
I have completed my b.tech with good communication skills and core skills with two two live projects. 1. Name of the project work (MINI PROJECT): AUTOMATIC ELECTRICAL SENSING SYSTEM Description of the Project: My project major role is to decreases the power consumption in the larger and mini shopping complex and also industries when this project Equipment is connected to any electrical system, the entire system equipment can be controlled current flow. Also it is simple operation and low cost of the project. My role in the project: Project Team Leader Number of team members: 10 Tools using in the project: 8051 Micro Controller, Power Supply Design, Embedded C- Language for Processer Coding, LED Display, Integrated Circuit(IC), KEIL Software. 2. Name of the project work (ACADEMIC PROJECT): SOLAR TRACKING SYSTEM FOR INCREASING THE SOLAR SYSTEM ELECTRICAL GENERATION EFFICIENCY Description of the Project: This project main role is to increase the present solar system of electrical generation efficiency by tracking solar light automatically by using microcontroller programming. This project can be added to the present solar system to increase efficiency up to 40%. My role in the project: the project team leader Number of team members: 4 Tools using in a project: 8051 Micro Controller, Embedded C- Language for Processer Coding, LED Display, Integrated Circuit(IC), KEIL Software, Stepper Motor for Rotation of Solar Pannel,LDR(Light Dependent Resistor).