SREEDHARAN PILLAI VIMAL KUMAR VIMAL KUMAR, QC INSPECTOR COATING & INSULATION)

SREEDHARAN PILLAI VIMAL KUMAR VIMAL KUMAR

QC INSPECTOR COATING & INSULATION)

SK ENGINEERING & CONSTRUCTION

Location
India
Education
Diploma, MECHANICAL ENGINEERING
Experience
1 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :1 years, 6 Months

QC INSPECTOR COATING & INSULATION) at SK ENGINEERING & CONSTRUCTION
  • Kuwait - Al Ahmadi
  • March 2016 to August 2017

 Based on Project Variation (PV) Check the cleanliness and roughness of blasted surface as per the specification by using replica tape or visual comparators.
 Wrapping & Coating inspection as per KNPC standard.
 Test conducted like Adhesion test such as Dolly, Cross cut.
 Monitor and record ambient conditions before starting each coat of Paint application at shop.
 Calibrate the gauges such as Foil gauge, D.F.T gauge etc.
 Maintain Calibration certificates of all Painting related equipment and Paint Batch certificates.
 Monitor the mixing & thinning, Induction, pot life, application, DFT & WFT values during surveillance.
 Check the paint thickness by using D.F.T Gauges (SSPC PA 2) after each coat.
 Check the inter-coat cleanliness before each coat and ensure stripe coat at weld joints.
 Inspect and maintain records of final D.F.T.
 Check the line as per isometric drawing and ensure correct Painting systems according to process temperature of the line.
 Check the Chloride, Cleanliness and Roughness of blasted surface as per the specification and using replica tape or visual comparators
 Surface preparation and painting inspection of weld joints after hydro test.
 Test conducted like Holiday test (Low Voltage Type), Dolly, Cross cut (adhesion).
 Conduct the required test as per the requirements.
 Arrange final Inspection at site after cosmetic coat.
 Inspection co- ordination & records maintaining.
 Check and maintain Inspection reports and update in system.
 Attending inspection with Client after getting RFI.
 Get the approval of Inspection reports from Client inspector.
 Punch Clear & Dossier submission.
 Calibration of all Inspection equipment’s like D.F.T gauge, Hygrometer, profile gauge etc.
 Inspection of Epoxy coatings and Polyurethane coatings at Tank Internal and External.
 Inspection of Insulation activities such as IH, IC, IS, ST, STR, ET, PP Etc. at the site as per KNPC Std 82A1, 82A5, SHELL DEP 30.46.00.31, DEP 30.46.00.32 Etc..
Carryout Cold Insulation Inspection of FRP/GRP piping and Hot Insulation inspection such as Feed Effluent Exchanger, Stripped Sour Water Trim Cooler, K O Flare Drum, Sour water Stripper, Reactor, Reactor Stripper, Upper Generator, Main Column, Orifice Chamber, Stripper Steam Reboiler, Compressor Inter stage Cooler, Feed Steam Separator, Speed Catalyst Stripper Steam, SWS Overhead Accumulator, Reboiler Condenser etc..
Conducting Insulation Material receiving inspection as per KNPC standard with client.

Education

Diploma, MECHANICAL ENGINEERING
  • at GURUDEV TECHNICAL TRAINING COLLEGE
  • July 1998

Specialties & Skills

Languages

English
Expert

Training and Certifications

NACE INTERNATIONAL (Certificate)
Date Attended:
November 2011
Valid Until:
November 2017

Hobbies

  • INTERNET AND READING
    AM INTEREST IN BOOK READING AND WATCHING ENTERTAINMENT PROGRAMS