Total years of experience :12 years, 11 Months
Designing of Un Designed Projects as per client’s requirements.
Selection of the Electrical Distribution Boards, Main Distribution Boards (M.D.B’S), Sub Main Distribution Boards (S.M.D.B’S), and Final Distribution Boards (F.D.B’S) etc and Work out for The Most Economical and Suitable Scheme.
Designing for LV Panel, Main Distribution Boards, Sub Main Distribution Boards & Final Distribution Boards, Selection of Circuit Breaker According to the Load, Determine The Sizes Of Cables & Sleeves.
Guiding the AutoCAD Draftsman for Preparing the Electrical Shop Drawings as Per the Client’s Approval.
PVC, GI Conduits, Wiring Accessories, Cables, Cable Trays and Material Required Quantity Take Off From Drawings.
Supervision of Site Works and Installation Works.
Preparation of Material Submittals for Clients Approval.
Co-Ordinate with A/C Works, Pre-Commissioning & Commissioning of Distribution Boards & Make Sure That All the Relevant Processing Equipments & Accessories Are Installed Properly.
Ensure That the Work Should Complete In Time with The Given Specifications
Managed two teams of onsite sub-contractors for 6 months.
Led the Electrical Engineering and Estimation team in two multi-million dollar projects that spanned 1.5 years.
Managed a team of an Electrical Estimation Engineer, two estimators and 4 Draftsman in the estimation department.
Effectively managed resources, created project schedules and maintained department budgets
Involved in various residential projects, workshop projects, labour accommodation projects and commercial tower projects at various parts of India and UAE.
Reviewed design drawings, specifications and client requirements for newly engineered constructions.
Involved in the Electrical estimation of construction projects, prepared and evaluated shop drawings, bill of quantities and tender documents.
Effectively coordinated between the Client, Consultant and Civil Contractor.
Responsible for design check, planning, site co-ordination, supervision and insure progress of Electrical works at site.
Responsible for Procurement, arranging the material and necessary manpower in advance.
Responsible for timely material submittal and drawings
Responsible for timely material inspection to consultant.
Ensuring work is executed in accordance with contract specification, approved drawings.
Attending co-ordination & site meeting with Client/ Consultant/ Main contractor.
Ensuring that safety rules and regulations are strictly followed at site.
Testing, Commissioning and handing over of complete works.
Third Party Inspection of RGGVY project in Northern districts of Kerala.
Physical inspection and technical evaluation of materials received / installed for Distribution Transformers, HT/LT lines, Poles, Earth electrodes etc. of RGGVY project.
Inspection of materials relevant to RGGVY project at factory premises as per standards.
Coordinating Inspection at various locations.
Preparation of Inspection reports of RGGVY project.
Co-ordination with Site Engineer as well as vendor to solve the
site related problems.
Follow up for approved drawing, material, test report, short
supply.
Co-ordination for the procurement of materials for the Projects.
Associated in monitoring, tracking status of progress of RGGVY project.
Route map preparation using Auto CAD.