sreekumar KR, Environmental Engineer

sreekumar KR

Environmental Engineer

Abu Dhabi Polymers

Location
United Arab Emirates - Abu Dhabi
Education
Master's degree, Finance Mangement
Experience
21 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 7 Months

Environmental Engineer at Abu Dhabi Polymers
  • United Arab Emirates - Abu Dhabi
  • August 2010 to April 2015

Supporting the Polyethylene and Polypropylene production facility. Responsible for implementation of ISO 14001, RC 14001 standards. Implementation of the ADNOC code or practice, which is the legal requirements. Regular monitoring of air emissions, effluent treatment plant, treated wastewater discharges, ambient air quality monitoring, sea water monitoring and hazardous waste monitoring. Implementation of projects to reduce the GHG emissions. Implementation of hazardous waste reduction program. Implementation of the hazardous waste collection, packaging, documentation and disposal. Disposal of selected hazardous waste to international locations through approved processes. Preparation of monitoring reports and submission of the same to the legal authorities. Presentation of the monitoring results to the plant operation team to rectify the operating conditions. Member of the ADNOC environmental committee to support the group companies to achieve environmental targets. Involve in the development of environmental KPI for the company. Preparation of Sustainability report based on GRI reporting framework. Coordination of submission of applications to various Environmental awards like ADNOC, ADEPIC etc. Member of team to scrutiny the award applications. Team member in developing ambient air quality network for ADNOC group. Facilitator for the Japan Coordination Center Petroleum with ADNOc for water pollution prevention and treatment strategy. Provide training and orientation to newly joined employees on environment. Provide refresher courses on Environment related courses as internal trainer. Team member for the HSE Road map implementation for new regulations and standards coordinating environmental related part. Coordinator for various environmental campaigns like environment day, earth hour, waste free environment etc.

Vice President at E& S Technologies India Private Limited
  • India
  • February 2009 to August 2010

Key Deliverables:
 Pre- Qualification with Oil& Gas, Petrochemicals and Heavy Industries in India, Middle East and South East Asia for refinery shut down maintenance and tank cleaning.
 Develop the organization to handle Maintenance Services for the Heavy industries.
 Enforcement of the QHSE policy among the industries in the Company.
 Develop process Engineering, Detailed Engineering capabilities to take part in EPC jobs.
 Develop a business volume of One Million USD in first 3 years.
Accomplishments:
 Acquisition of two companies with existing work orders to start off the jobs, with no gestation period of establishments.
 Pre- Qualification completed in all major companies in India.
 Developed the core team for job execution.
 Procurement of all major equipments tools and tackles for the proposed jobs.
 Developed strategic partnership with major companies in US, South East Asia and Middle East for the expansion and technology know- how.
 Acquisition of 30% business world over from a US based shutdown maintenance company with differed payment terms.

Manager Process Engineering at Oil and Natural Gas Corporation India
  • India
  • September 2006 to February 2009

 Obtaining the statutory clearance for the 3MMTPA Refinery, Olefin complex, Aromatic Complex and Related Infrastructure.
 Obtain the clearances for the Single Buoy mooring system, pipelines, and underground rock carven storage of crude oil storage of 10 MMT.
 Identification of suitable technologies, development of technologies suitable for the SEZ.
 Developing the QHSE standards for the SEZ.
 Evaluation and selection of the appropriate entrepreneurs for the operation in SEZ.
 Obtain the necessary Environmental clearances.
 Enforcement of the QHSE policy among the industries in the SEZ
 Process engineering support for the ONGC petrochemical plants.
Accomplishments:
 Obtain the clearances for the Single Buoy mooring system, pipelines, and underground rock carven storage of crude oil storage of 10 MMT.
 Verification and study of the Risk of the proposed process plants and the crude oil storage facility.
 Completed the EIA and RRA (Rapid Risk Assessment) studies for the entire complex through reputed institutes.
 Approvals from central Govt, state Govt, Coastal Regulatory authority, permission for disposal of trade effluent to sea, permits for the relocation and rehabilitation of the displaced families obtained.
 Completion of the design and engineering of the Water Management System.
 Obtained the Environmental clearances for the Complex.
 Training for all the employees on statutory compliance.
 Developed a Comprehensive HSE system for the proposed entrepreneurs inside the free zone.

Projet Manager at Hamed Establishment GTC
  • United Arab Emirates - Abu Dhabi
  • July 2001 to August 2006

Development of business and execute the Tank cleaning Service project.
Identification of suitable technologies, development of technologies to treat sludge and drill cuttings. Testing of the technologies through pilot plant studies, development of the basic engineering package, development of procurement package, procurement of the equipments, inspection, identification of the detailed engineering consultant, implementation, commissioning and project operation of the drill cutting treatment and sludge treatment. Developing technologies for hazardous waste treatment, pollution abatement technologies. Development of the P&ID, detailed Engineering, commissioning, and operation supervision of the plant for the sludge treatment plant for the AEPCO, Fujairah. De Bottle necking study of the Melubco lubes oil blending facilities and for Oman Engine Oil, Sohar.
Under taken Feasibility Study of National Resins, Burami. Development of ‘Dure Oil” a used lubricating oil recycling refinery in Abu Dhabi to produce 1500 liters of treated base oil, the job involved was the development of concepts to the selection of Vacuum distillation technology, clay cartridge filtration and pre- distillation etc, project execution till operation of the plant.
The key projects undertaken were:
ADNOC Waste Management Facility - Oily sludge treatment ADMA OPCO - 3 year Tank Desludging Services. Abu Dhabi Water and Electricity Company - Integrated Hazardous Waste Management ADNOC - Refinery Tank Desludging and sludge treatment. ADCO - Tank cleaning and sludge treatment. BOROUGE - Integrated Hazardous Waste Management
Successfully opened up new areas of business to Hamed Est by selecting and developing business in Oil and Gas field. Developed new method of cleaning high capacity crude oil tank (1 Million Barrel) with out man entry to the tank. Obtained Health safety and Environment Award from Abu Dhabi National Oil Company for the Innovative Oily Waste treatment methods.

Senior Process Engineer ( Tech services) at Mangalore Refinery and Petrochemicals Limited
  • India
  • October 1993 to July 2001

Jun ‘97 - Jul ‘01 Production Superintend (Technical Services) Mangalore Refinery and Petrochemicals Ltd, Mangalore, India
Development of the FEED and Basic Engg Package in house for the Naphtha - MS segregation facility.
Development of the additional two numbers of 30” product pipelines to Jetty.
Development of flushing and line decontamination facility for black oil and white oil with three jetty operation and ATF shipping. Project co-ordination for the Phase - 2 expansions of the Oil storage and Movement facility including the development of “virtual Jetty” and second phase oil terminal.Verification of P&ID as per the approved norms of the Company.Coordination with PMC, contractor for the compliance of the process requirements of Phase -2.Developing and enforcing the safe construction of LPG storage facility as part of expansion facility. Developed internal basic engineering for the phase- 1 & phase-2 tie-up. Monitor and report the daily operations of Oil movement and storage, Jetty, and waste water treatment plant, product bulk and loose dispatch facilities like bitumen, Fuel oil and drum filling plants. e and transfer facilities


Oct 1993 - June 1997 Engineer Mangalore Refinery and Petrochemicals Ltd, Mangalore, India


Project, Pre- Commissioning and Commissioning


Operation

Jetty operation

Feed preparation and intermediate product receipt.


Finished product receipt and dispatch.

safety supervision of the loading terminals and pump houses, blend chart preparation and documentation regarding the rundown receipt and internal and external transfers. Dip memo preparation and refinery material balance on daily basis.
Plant in charge for operation of Oil movement facility, maintenance coordination, plant safety, and coordination with quality control and process engineering group.
Attending monthly planning meeting with customers for monthly product movement plan.
Blending preparation along with Laboratory and daily dispatch planning.

Education

Master's degree, Finance Mangement
  • at Indiragandhi Open university
  • November 2000

Masters in Finance Management with B grade, specialised in project management & budgeting, estimation

Bachelor's degree, Chemical Engineering
  • at University of Calicut
  • September 1993

First class with honours 83 % marks in chemical engineering

Specialties & Skills

Environmental
Operation
Terminal Server
Technical Service
Benchmarking
Process design
Plant Operation
Project excecution & Contracts
Project excecution & Contracts

Languages

English
Expert

Training and Certifications

Certificate ACA (Certificate)
Date Attended:
January 2011
Valid Until:
February 2011

Hobbies

  • Writing Technical papers
    Published in international petroleum