Lead Electrical Engineer
SKM consultants Pvt ltd
Total years of experience :28 years, 2 Months
I have been working in OIL & Gas field Since 2000, in design and detailed engineering. Below summarizes my experience
• Engaged in operations pertaining to competitive design and detailed engineering activity of projects with a team of effective engineers and designers located at multiple locations including UAE, Mumbai
• Developed design as per technical requirement of the contract ensuring meeting of all the local and Russian regulations; undertook document design approvals and interface between the design team, company representatives,
• Conducted detailed engineering, preparing technical notes to design the normal, emergency and essential power, power distribution scheme for the entire plant network and plant electrical isolation philosophy
• Performed detail design of electrical load list, single line diagrams, electrical system control and synchronizing schemes, electrical interlock diagrams, equipment sizing calculation, electrical system studies, detailed equipment specifications and data sheets for procurement, technical bid evaluations, vendor drawing reviews, electrical package substation layouts and equipment inspection
• Optimized plant package substation design including GTU, emergency diesel generator
• Managed the overall coordination for the deliverables & non-deliverables of electrical scope for Modular Technical Rooms(MTR) at Upper Zakum, UZ750 Project
I have been working as a Team Load for their Electrical Projects at various districts in Kerala, includes estimation costing, Tendering Bid valuation, Preparation of Specifications, Award contracts, Design and detailed Engineering for industrial and commercial projects
As a Principal Engineer, I was leading a Team of Engineers and Draft men, for the Design and Detailed Engineering, Specifications, Data sheet, TBE, , Mechanical Packages ete. In addition to I was engaged in Weekly/ Monthly progress reports, FEED engineering, Handling Mechanical Packages, Weekly client meeting etc
• Prepared SLD for 13.8 KV switchgear, 3.3 KV MCC, 380V LV MCC; prepared technical specification for transformers and switchgears
• Developed load schedule, load flow study, short circuit study, volt drop study; undertook protection coordination study using ETAP 6.0
• Created material and equipment specifications, data-sheets, cable & interconnection schedule, electrical equipment list; engaged in vendor offer review, technical bid evaluations, detailed vendor documentation/drawing review
• Undertook inspection (FAT) of various electrical equipment; coordinated for receiving inputs from other disciplines for managing electrical design activities and generating required design inputs for other disciplines
As a senior Electrical Engineer I was Handling their various Water Treatment projects. In addition to was handling the procurement activities for Electrical Engineering. Protection Coordination Study with ETAP software
As an Electrical Engineer, I was working for their Various projects for their Clients, KOC and KNPC in design and detailed Engineering
I was working as aSenior Electrical Engineer, as Design Enginior for their various Buildings and Industrial projects
I have got 80 % in my 10th , and 75% in my HSE and 58% aggregate in Engineering